메뉴 건너뛰기




Volumn , Issue , 2010, Pages

Maturity models in IS research

Author keywords

CMM; CMMI; IS research agenda; Literature review; Maturity; Maturity models

Indexed keywords

CMM; CMMI; IS RESEARCH AGENDA; LITERATURE REVIEWS; MATURITY; MATURITY MODEL;

EID: 84870646627     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: None     Document Type: Conference Paper
Times cited : (96)

References (54)
  • 1
    • 51449103484 scopus 로고    scopus 로고
    • A dyadic model of Interorganizational Systems (IOS) adoption maturity
    • Hawaii
    • Ali, M., Kurnia, S. and Johnston, R. B. (2008). A Dyadic Model of Interorganizational Systems (IOS) Adoption Maturity. In Proceedings of the HICSS, Hawaii.
    • (2008) Proceedings of the HICSS
    • Ali, M.1    Kurnia, S.2    Johnston, R.B.3
  • 3
    • 0043133393 scopus 로고    scopus 로고
    • The impact of software process improvement on quality: In theory and practice
    • Ashrafi, N. (2003). The impact of software process improvement on quality: In theory and practice. Information & Management, 40 (7), pp. 677-690.
    • (2003) Information & Management , vol.40 , Issue.7 , pp. 677-690
    • Ashrafi, N.1
  • 4
    • 42549167686 scopus 로고    scopus 로고
    • A multiple narrative approach to information systems failure: A succesful system that failed
    • Bartis, E. and Mitev, N. (2008). A multiple narrative approach to information systems failure: a succesful system that failed. European Journal of Information Systems, 17 (2), pp. 112-124.
    • (2008) European Journal of Information Systems , vol.17 , Issue.2 , pp. 112-124
    • Bartis, E.1    Mitev, N.2
  • 6
    • 8744244463 scopus 로고    scopus 로고
    • An information abstraction model for end user CASE support
    • Becker, S. A. and Gibson, R. (1997). An information abstraction model for end user CASE support. Journal of End User Computing, 9 (1), pp. 28-34.
    • (1997) Journal of End User Computing , vol.9 , Issue.1 , pp. 28-34
    • Becker, S.A.1    Gibson, R.2
  • 7
    • 0003140320 scopus 로고
    • Organizing knowledge syntheses: A taxonomy of literature reviews
    • Cooper, H. M. (1988). Organizing Knowledge Syntheses: A Taxonomy of Literature Reviews. Knowledge in Society 1(1), pp. 104-126.
    • (1988) Knowledge in Society , vol.1 , Issue.1 , pp. 104-126
    • Cooper, H.M.1
  • 8
    • 33749625596 scopus 로고    scopus 로고
    • The project management maturity model
    • Crawford, J. K. (2006). The Project Management Maturity Model. Information Systems Management, 23 (4), pp. 50-58.
    • (2006) Information Systems Management , vol.23 , Issue.4 , pp. 50-58
    • Crawford, J.K.1
  • 11
    • 0031526151 scopus 로고    scopus 로고
    • Measuring software engineering evolution: A rasch calibration
    • Dekleva, S. and Drehmer, D. (1997). Measuring Software Engineering Evolution: A Rasch Calibration. Information Systems Research, 8 (1), pp. 95-104.
    • (1997) Information Systems Research , vol.8 , Issue.1 , pp. 95-104
    • Dekleva, S.1    Drehmer, D.2
  • 12
    • 84865656489 scopus 로고    scopus 로고
    • Controlling curriculum redesign with a process improvement model
    • Drinka, D. and Yen, M. Y.-M. (2008). Controlling Curriculum Redesign with a Process Improvement Model. Journal of Information Systems Education, 19 (3), pp. 331-342.
    • (2008) Journal of Information Systems Education , vol.19 , Issue.3 , pp. 331-342
    • Drinka, D.1    Yen, M.Y.-M.2
  • 13
  • 14
    • 57049177828 scopus 로고    scopus 로고
    • Maturity levels for interoperability in digital government
    • Gottschalk, P. (2009). Maturity levels for interoperability in digital government. Government Information Quaterly, 26 (1), pp. 75-81.
    • (2009) Government Information Quaterly , vol.26 , Issue.1 , pp. 75-81
    • Gottschalk, P.1
  • 16
    • 7744242486 scopus 로고    scopus 로고
    • Prescription, description, reflection: The shape of the software process improvement field
    • Hansen, B., Rose, J. and Tjørnehøj, G. (2004). Prescription, description, reflection: the shape of the software process improvement field. International Journal of Information Management, 24, pp. 457-472.
    • (2004) International Journal of Information Management , vol.24 , pp. 457-472
    • Hansen, B.1    Rose, J.2    Tjørnehøj, G.3
  • 18
    • 0242652022 scopus 로고    scopus 로고
    • Design science in information systems research
    • Hevner, A. R., March, S. T., Park, J. and Ram, S. (2004). Design science in information systems research. MIS Quarterly, 28 (1), pp. 75-105.
    • (2004) MIS Quarterly , vol.28 , Issue.1 , pp. 75-105
    • Hevner, A.R.1    March, S.T.2    Park, J.3    Ram, S.4
  • 19
    • 80055032149 scopus 로고    scopus 로고
    • Downloaded from, on 2010-01-14
    • Hewlett-Packard (2007). The HP Business Intelligence Maturity Model. Downloaded from http://h71028.www7.hp.com/ERC/downloads/4AA1-5467ENW.pdf on 2010-01-14.
    • (2007) The HP Business Intelligence Maturity Model
  • 20
    • 2942718210 scopus 로고    scopus 로고
    • A stage maturity model for enterprise resource planning systems use
    • Holland, C. P. and Light, B. (2001). A stage maturity model for enterprise resource planning systems use. Database for Advances in Information Systems, 32 (2), pp. 24-45.
    • (2001) Database for Advances in Information Systems , vol.32 , Issue.2 , pp. 24-45
    • Holland, C.P.1    Light, B.2
  • 21
    • 33644680151 scopus 로고    scopus 로고
    • Selection priority of process areas based on CMMI continuous representation
    • Huang, S.-J. and Han, W.-M. (2006). Selection priority of process areas based on CMMI continuous representation. Information & Management, 43 (3), pp. 297-307.
    • (2006) Information & Management , vol.43 , Issue.3 , pp. 297-307
    • Huang, S.-J.1    Han, W.-M.2
  • 23
    • 0347412022 scopus 로고    scopus 로고
    • An exploration of the relationship between software development process maturity and project performance
    • Jiang, J. J., Klein, G., Hwang, H.-G., Huang, J. and Hung, S.-Y. (2004). An exploration of the relationship between software development process maturity and project performance. Information & Management, 41 (3), pp. 279-288.
    • (2004) Information & Management , vol.41 , Issue.3 , pp. 279-288
    • Jiang, J.J.1    Klein, G.2    Hwang, H.-G.3    Huang, J.4    Hung, S.-Y.5
  • 24
    • 0000046276 scopus 로고
    • An empirical test of a stage of growth progression model
    • Kazanjian, R. K. and Drazin, R. (1989). An empirical test of a stage of growth progression model. Management Science, 35 (12), pp. 1489-1503.
    • (1989) Management Science , vol.35 , Issue.12 , pp. 1489-1503
    • Kazanjian, R.K.1    Drazin, R.2
  • 25
    • 70449707600 scopus 로고    scopus 로고
    • A simple instrument to measure IT-Business alignment maturity
    • Khaiata, M. and Zuelkarnan, I. A. (2009). A Simple Instrument to Measure IT-Business Alignment Maturity. Information Systems Management, 26 (2), pp. 138-152.
    • (2009) Information Systems Management , vol.26 , Issue.2 , pp. 138-152
    • Khaiata, M.1    Zuelkarnan, I.A.2
  • 26
    • 0141637145 scopus 로고    scopus 로고
    • Assessing IT-Business alignment
    • Luftman, J. (2003). Assessing IT-Business Alignment. Information Systems Management 20 (4), pp. 9-15.
    • (2003) Information Systems Management , vol.20 , Issue.4 , pp. 9-15
    • Luftman, J.1
  • 27
    • 58149191576 scopus 로고    scopus 로고
    • Explaining information systems change: A punctuated socio- technical change model
    • Lyytinen, K. and Newman, M. (2008). Explaining Information Systems Change: A Punctuated Socio- Technical Change Model. European Journal of Information Systems, 17 (4), pp. 589-613.
    • (2008) European Journal of Information Systems , vol.17 , Issue.4 , pp. 589-613
    • Lyytinen, K.1    Newman, M.2
  • 28
    • 0033416832 scopus 로고    scopus 로고
    • Learning failure in information systems development
    • Lyytinen, K. and Robey, D. (1999). Learning failure in information systems development. Information Systems Journal, 9 (2), pp. 85-101.
    • (1999) Information Systems Journal , vol.9 , Issue.2 , pp. 85-101
    • Lyytinen, K.1    Robey, D.2
  • 29
    • 54349105989 scopus 로고    scopus 로고
    • Towards collaboration maturity in business processes: An exploratory study in oil production processes
    • Magdaleno, A. M., Cappelli, C., Baiao, F. A., Santoro, F. M. and Araujo, R. (2008). Towards Collaboration Maturity in Business Processes: An Exploratory Study in Oil Production Processes. Information Systems Management, 25 (2), pp. 302-318.
    • (2008) Information Systems Management , vol.25 , Issue.2 , pp. 302-318
    • Magdaleno, A.M.1    Cappelli, C.2    Baiao, F.A.3    Santoro, F.M.4    Araujo, R.5
  • 32
    • 36549001623 scopus 로고    scopus 로고
    • Infosys technologies: Improving organizational knowlegde flows
    • Mehta, N., Oswald, S. and Mehta, A. (2007). Infosys Technologies: improving organizational knowlegde flows. Journal of Information Technology, 22, pp. 456-464.
    • (2007) Journal of Information Technology , vol.22 , pp. 456-464
    • Mehta, N.1    Oswald, S.2    Mehta, A.3
  • 33
    • 70350662681 scopus 로고    scopus 로고
    • Situational maturity models as instrumental artifacts for organizational design
    • Philadelphia
    • Mettler, T. and Rohner, P. (2009). Situational Maturity Models as Instrumental Artifacts for Organizational Design. In Proceedings of the DESRIST, Philadelphia.
    • (2009) Proceedings of the DESRIST
    • Mettler, T.1    Rohner, P.2
  • 34
    • 0000481870 scopus 로고    scopus 로고
    • Qualitative research in information systems
    • Myers, M. D. (1997). Qualitative Research in Information Systems. MIS Quarterly, 21 (2), pp. 241- 242.
    • (1997) MIS Quarterly , vol.21 , Issue.2 , pp. 241-242
    • Myers, M.D.1
  • 35
    • 0000671970 scopus 로고
    • Managing the crisis in data processing
    • Nolan, R. L. (1979). Managing the crisis in data processing. Harvard Business Review, 57 (2), pp. 115-126.
    • (1979) Harvard Business Review , vol.57 , Issue.2 , pp. 115-126
    • Nolan, R.L.1
  • 37
    • 0035648134 scopus 로고    scopus 로고
    • Software quality and management
    • Phan, D. D. (2001). Software Quality and Management. Information Systems Management, 18 (1), pp. 56-67.
    • (2001) Information Systems Management , vol.18 , Issue.1 , pp. 56-67
    • Phan, D.D.1
  • 38
    • 11544271340 scopus 로고    scopus 로고
    • An analysis of excluded IS processes in the capability maturity model and their potential impact
    • Purvis, R. L., Santiago, J. and Sambamurthy, V. (1998). An analysis of excluded IS processes in the capability maturity model and their potential impact. Journal of End User Computing, 10 (1), pp. 20-29.
    • (1998) Journal of End User Computing , vol.10 , Issue.1 , pp. 20-29
    • Purvis, R.L.1    Santiago, J.2    Sambamurthy, V.3
  • 39
    • 44449102655 scopus 로고    scopus 로고
    • Work dispersion, processbased learning, and offshore software development performance
    • Ramasubbu, N., Mithas, S., Krishnan, M. S. and Kemerer, C. F. (2008). Work Dispersion, Processbased Learning, and Offshore Software Development Performance. MIS Quarterly, 32 (2), pp. 437- 458.
    • (2008) MIS Quarterly , vol.32 , Issue.2 , pp. 437-458
    • Ramasubbu, N.1    Mithas, S.2    Krishnan, M.S.3    Kemerer, C.F.4
  • 40
    • 84871022229 scopus 로고    scopus 로고
    • Towards a business process management maturity model
    • Regensburg, Germany
    • Rosemann, M. and de Bruin, T. (2005). Towards a Business Process Management Maturity Model. In Proceedings of the ECIS, Regensburg, Germany.
    • (2005) Proceedings of the ECIS
    • Rosemann, M.1    De Bruin, T.2
  • 41
    • 40749085237 scopus 로고    scopus 로고
    • Toward improving the relevance of information systems research to practice: The role of applicability checks
    • Rosemann, M. and Vessey, I. (2008). Toward Improving the Relevance of Information Systems Research to Practice: The Role of Applicability Checks. MIS Quarterly, 32 (1), pp. 1-22.
    • (2008) MIS Quarterly , vol.32 , Issue.1 , pp. 1-22
    • Rosemann, M.1    Vessey, I.2
  • 42
    • 72749123139 scopus 로고    scopus 로고
    • From teaching to learning: Learner-centered teaching and assessment in information systems education
    • Saulnier, B. M., Landry, J. P., Longenecker Jr., H. E. and Wagner, T. A. (2008). From Teaching to Learning: Learner-Centered Teaching and Assessment in Information Systems Education. Journal of Information Systems Education, 19 (2), pp. 169-174.
    • (2008) Journal of Information Systems Education , vol.19 , Issue.2 , pp. 169-174
    • Saulnier, B.M.1    Landry, J.P.2    Longenecker Jr., H.E.3    Wagner, T.A.4
  • 43
    • 34548476228 scopus 로고    scopus 로고
    • Mobility, business process management, software sourcing, and maturity model trends: Propositions for the is organization of the future
    • Scott, J. E. (2007). Mobility, Business Process Management, Software Sourcing, and Maturity Model Trends: Propositions for the IS Organization of the Future. Information Systems Management 24 (2), pp. 139-145.
    • (2007) Information Systems Management , vol.24 , Issue.2 , pp. 139-145
    • Scott, J.E.1
  • 44
    • 84979205839 scopus 로고    scopus 로고
    • Electronic commerce development in small and medium sized enterprises: A stage model and its implications
    • Subba Rao, S., Metts, G. and Mora Monge, C. A. (2003). Electronic commerce development in small and medium sized enterprises: A stage model and its implications. Business Process Management Journal, 9 (1), pp. 11-32.
    • (2003) Business Process Management Journal , vol.9 , Issue.1 , pp. 11-32
    • Subba Rao, S.1    Metts, G.2    Mora Monge, C.A.3
  • 45
    • 84870642636 scopus 로고    scopus 로고
    • Downloaded from, on 2010-01-14
    • Sun (2005). Information Lifecycle Management Maturity Model. Downloaded from http://www.sun.com/storagetek/white-papers/ILM-Maturity-Model.pdf on 2010-01-14.
    • (2005) Information Lifecycle Management Maturity Model
  • 47
    • 0031288379 scopus 로고    scopus 로고
    • Integration between business planning and information systems planning: An evolutionary-contingency perspective
    • Teo, T. S. H. and King, W. R. (1997). Integration between Business Planning and Information Systems Planning: An Evolutionary-Contingency Perspective. Journal of Management Information Systems, 14 (1), pp. 185-214.
    • (1997) Journal of Management Information Systems , vol.14 , Issue.1 , pp. 185-214
    • Teo, T.S.H.1    King, W.R.2
  • 48
    • 38949105145 scopus 로고    scopus 로고
    • The IT value hierarchy: Using maslow's hierarchy of needs as a metaphor for gauging the maturity level of information technology use within competitive organizations
    • Urwiler, R. and Frolick, M. N. (2008). The IT Value Hierarchy: Using Maslow's Hierarchy of Needs as a Metaphor for Gauging the Maturity Level of Information Technology Use within Competitive Organizations. Information Systems Management 25 (1), pp. 83-88.
    • (2008) Information Systems Management , vol.25 , Issue.1 , pp. 83-88
    • Urwiler, R.1    Frolick, M.N.2
  • 49
    • 84870974084 scopus 로고    scopus 로고
    • Bringing change in government organizations: Evolution towards post-bureaucracy with web-based IT projects
    • Paris, France
    • Vaast, E. and Binz-Scharf, M. C. (2008). Bringing Change in Government Organizations: Evolution Towards Post-Bureaucracy with Web-Based IT Projects. In Proceedings of the ICIS, Paris, France.
    • (2008) Proceedings of the ICIS
    • Vaast, E.1    Binz-Scharf, M.C.2
  • 50
    • 70249110495 scopus 로고    scopus 로고
    • Measuring critical factors of software quality management: Development and validation of an instrument
    • Vitharana, P. and Mone, M. A. (2008). Measuring Critical Factors of Software Quality Management: Development and Validation of an Instrument. Information Resources Management Journal, 21 (2), pp. 18-37.
    • (2008) Information Resources Management Journal , vol.21 , Issue.2 , pp. 18-37
    • Vitharana, P.1    Mone, M.A.2
  • 51
    • 0035546509 scopus 로고    scopus 로고
    • Forums for information systems scholars: III
    • Walstrom, K. A. and Hardgrave, B. C. (2001). Forums for information systems scholars: III. Information & Management, 39 (2), pp. 117-124.
    • (2001) Information & Management , vol.39 , Issue.2 , pp. 117-124
    • Walstrom, K.A.1    Hardgrave, B.C.2
  • 52
    • 0012903874 scopus 로고    scopus 로고
    • Analyzing the past to prepare for the future: Writing a literature review
    • Webster, J. and Watson, R. T. (2002). Analyzing the past to prepare for the future: Writing a literature review. MIS Quarterly, 26 (2), pp. 13-23.
    • (2002) MIS Quarterly , vol.26 , Issue.2 , pp. 13-23
    • Webster, J.1    Watson, R.T.2
  • 53
    • 0141792319 scopus 로고    scopus 로고
    • Understanding dynamic capabilities
    • Winter, S. G. (2003). Understanding Dynamic Capabilities. Strategic Management Journal, 24 (7), pp. 991-995.
    • (2003) Strategic Management Journal , vol.24 , Issue.7 , pp. 991-995
    • Winter, S.G.1
  • 54
    • 33745479482 scopus 로고    scopus 로고
    • Migration to open-standard IOS: Network effects, switching costs, and path depency
    • Zhu, K., Kraemer, K. L., Gurbaxani, V. and Xu, S. X. (2006). Migration to open-standard IOS: Network effects, switching costs, and path depency. MIS Quarterly, 30, pp. 515-539.
    • (2006) MIS Quarterly , vol.30 , pp. 515-539
    • Zhu, K.1    Kraemer, K.L.2    Gurbaxani, V.3    Xu, S.X.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.