메뉴 건너뛰기




Volumn 25, Issue 4, 1997, Pages 437-447

Scheduling jobs with uncertain setup times and sequence dependency

Author keywords

Job shop scheduling; Sequencing; Setup times; Simulation

Indexed keywords

NORMAL DISTRIBUTION;

EID: 0031206538     PISSN: 03050483     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0305-0483(97)00013-3     Document Type: Article
Times cited : (45)

References (25)
  • 1
    • 84985757538 scopus 로고
    • An evaluation of order release mechanisms in a job shop environment
    • Ragatz, R. L. and Mabert, V. A., An evaluation of order release mechanisms in a job shop environment. Decision Science, 1988, 19, 167-189.
    • (1988) Decision Science , vol.19 , pp. 167-189
    • Ragatz, R.L.1    Mabert, V.A.2
  • 2
    • 0027634134 scopus 로고
    • BPSS: A scheduling support system for the packaging industry
    • Adler, L., Fraiman, N., Kobacker, E. and Pinedo, M., BPSS: a scheduling support system for the packaging industry. Operations Research, 1993, 41, 641-648.
    • (1993) Operations Research , vol.41 , pp. 641-648
    • Adler, L.1    Fraiman, N.2    Kobacker, E.3    Pinedo, M.4
  • 3
    • 85170015113 scopus 로고
    • Multi-cut blanking: A variety of approaches
    • Linders. D., Multi-cut blanking: a variety of approaches. Metal Center News, 1994, 34, 42-44.
    • (1994) Metal Center News , vol.34 , pp. 42-44
    • Linders, D.1
  • 4
    • 85170000957 scopus 로고
    • Present Perfect
    • Rebsamen, W., Present Perfect. American Printer, 1994, 212, 66-70.
    • (1994) American Printer , vol.212 , pp. 66-70
    • Rebsamen, W.1
  • 5
    • 0002240548 scopus 로고
    • Rapid modeling helps focus setup reduction at Ingersoll
    • Rehman, A. and Diehl, M. B., Rapid modeling helps focus setup reduction at Ingersoll. Industrial Engineering, 1993, 25, 52-55.
    • (1993) Industrial Engineering , vol.25 , pp. 52-55
    • Rehman, A.1    Diehl, M.B.2
  • 7
    • 38249034192 scopus 로고
    • Repetitive lots: The use of a sequence-dependent set-up time scheduling procedure in group technology and traditional shops
    • Flynn, B. B., Repetitive lots: the use of a sequence-dependent set-up time scheduling procedure in group technology and traditional shops. Journal of Operations Management, 1987, 7, 203-216.
    • (1987) Journal of Operations Management , vol.7 , pp. 203-216
    • Flynn, B.B.1
  • 8
    • 0023576978 scopus 로고
    • The effects of setup time on output capacity in cellular manufacturing
    • Flynn, B. B., The effects of setup time on output capacity in cellular manufacturing. International Journal of Production Research, 1987, 25, 1761-1772.
    • (1987) International Journal of Production Research , vol.25 , pp. 1761-1772
    • Flynn, B.B.1
  • 9
    • 0002687992 scopus 로고
    • Impact of the setup variable on capacity and inventory decisions
    • Hahn, C. K., Bragg, D. J. and Shin, D. W., Impact of the setup variable on capacity and inventory decisions. Academic Management Review, 1988, 13, 91-103.
    • (1988) Academic Management Review , vol.13 , pp. 91-103
    • Hahn, C.K.1    Bragg, D.J.2    Shin, D.W.3
  • 10
    • 0028462998 scopus 로고
    • The impact of sequence dependent setup time on job shop scheduling performance
    • Kim, S. C. and Bobrowski, P. M., The impact of sequence dependent setup time on job shop scheduling performance. International Journal of Production Research, 1994, 32, 1503-1520.
    • (1994) International Journal of Production Research , vol.32 , pp. 1503-1520
    • Kim, S.C.1    Bobrowski, P.M.2
  • 11
    • 84985801774 scopus 로고
    • Repetitive lots: Flow-time reductions through sequencing and dynamic batch sizing
    • Jacobs, F. R. and Bragg, D. J., Repetitive lots: flow-time reductions through sequencing and dynamic batch sizing. Decision Science, 1988, 19, 281-294.
    • (1988) Decision Science , vol.19 , pp. 281-294
    • Jacobs, F.R.1    Bragg, D.J.2
  • 12
    • 0000658024 scopus 로고
    • Search and simulation of a job shop sequencing rule
    • Hershauer, J. C., Search and simulation of a job shop sequencing rule. Management Science, 1975, 21, 833-843.
    • (1975) Management Science , vol.21 , pp. 833-843
    • Hershauer, J.C.1
  • 13
    • 0345403299 scopus 로고
    • The influence of set-up time on job shop performance
    • Wilbrecht, J. K. and Prescott, W. B., The influence of set-up time on job shop performance. Management Science, 1969, 16, B274-B280.
    • (1969) Management Science , vol.16
    • Wilbrecht, J.K.1    Prescott, W.B.2
  • 15
    • 0000587970 scopus 로고
    • Three heuristic rules for sequencing jobs to a single production facility
    • Gavett, J. W., Three heuristic rules for sequencing jobs to a single production facility. Management Science, 1965, 11, B166-B176.
    • (1965) Management Science , vol.11
    • Gavett, J.W.1
  • 16
    • 84952243184 scopus 로고
    • n Jobs and m machines job-shop problems with sequence-dependent set-up times
    • Gupta, S. K., n Jobs and m machines job-shop problems with sequence-dependent set-up times. International Journal of Production Research, 1982, 20, 643-656.
    • (1982) International Journal of Production Research , vol.20 , pp. 643-656
    • Gupta, S.K.1
  • 17
    • 38249010907 scopus 로고
    • Product mix selection and closed manufacturing cell flow time performance
    • Deane, R. H. and Yang, J., Product mix selection and closed manufacturing cell flow time performance. International Journal of Production Economics, 1992, 28, 157-169.
    • (1992) International Journal of Production Economics , vol.28 , pp. 157-169
    • Deane, R.H.1    Yang, J.2
  • 20
    • 0000235161 scopus 로고
    • A scheduling problem involving sequence dependent changeover times
    • Lockett, A. G. and Muhlemann, A. P., A scheduling problem involving sequence dependent changeover times. Operations Research, 1972, 20, 895-902.
    • (1972) Operations Research , vol.20 , pp. 895-902
    • Lockett, A.G.1    Muhlemann, A.P.2
  • 22
    • 0010889791 scopus 로고
    • Power function charts for specifying numbers of observations in analyses of variance of fixed effects
    • Feldt, L. S. and Mahmoud, M. W., Power function charts for specifying numbers of observations in analyses of variance of fixed effects. The Annals of Mathematical Statistics, 1958, 29, 871-877.
    • (1958) The Annals of Mathematical Statistics , vol.29 , pp. 871-877
    • Feldt, L.S.1    Mahmoud, M.W.2
  • 23
    • 78049377645 scopus 로고
    • Manufacturing revitalization at Harley-Davidson Motor Co
    • Sepehri, M., Manufacturing revitalization at Harley-Davidson Motor Co. Industrial Engineering, 1987, 19, 87-93.
    • (1987) Industrial Engineering , vol.19 , pp. 87-93
    • Sepehri, M.1
  • 24
    • 0002998497 scopus 로고
    • Managing capacity: Getting the most from your company's assets
    • Wortman, D. B., Managing capacity: getting the most from your company's assets. Industrial Engineering, 1992, 24, 47-49.
    • (1992) Industrial Engineering , vol.24 , pp. 47-49
    • Wortman, D.B.1
  • 25
    • 85170024686 scopus 로고
    • Beyond the factory walls: Overcoming competitive gridlock
    • Boston University
    • Kim, J. S., Beyond the factory walls: overcoming competitive gridlock. 1994 US Manufacturing Futures Survey. Boston University, 1994.
    • (1994) 1994 US Manufacturing Futures Survey
    • Kim, J.S.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.