A survey of current cost estimating practices
-
Akintoye A, Fitzgerald E (2000) A survey of current cost estimating practices. Constr Manag Econ 18: 161-172.
-
(2000)
Constr Manag Econ
, vol.18
, pp. 161-172
-
-
Akintoye, A.1
Fitzgerald, E.2
-
3
-
-
0002231440
-
Cost estimation of timber bridges using neural networks
-
Creese RC, Li Li (1995) Cost estimation of timber bridges using neural networks. Cost Eng 37(5): 17-22.
-
(1995)
Cost Eng
, vol.37
, Issue.5
, pp. 17-22
-
-
Creese, R.C.1
Li, L.2
-
5
-
-
77956895316
-
-
Du Yon Kim, Sang Min Yeom, Seung Heom Han et al (2005) Profit forecasting model for international projects using multiple regression analysis and neural networks. In: Proceedings of the CITC-III Conference, Athens, Greece, 15-17 September 2005, pp 220-226.
-
-
-
-
6
-
-
77956927611
-
Neural networks in civil engineering
-
Flood I, Kartam N (1994) Neural networks in civil engineering. J Comput Civ Eng 8: 31-162.
-
(1994)
J Comput Civ Eng
, vol.8
, pp. 31-162
-
-
Flood, I.1
Kartam, N.2
-
7
-
-
0442328937
-
What causes cost overrun in transport infrastructure projects?
-
Flyvbjerg B, Mette SH, Soren B (2004) What causes cost overrun in transport infrastructure projects? Transplant Rev 24(1): 3-18.
-
(2004)
Transplant Rev
, vol.24
, Issue.1
, pp. 3-18
-
-
Flyvbjerg, B.1
Mette, S.H.2
Soren, B.3
-
8
-
-
15744362051
-
Structural equation model of project planning effectiveness
-
Islam MDM, Faniran OO (2005) Structural equation model of project planning effectiveness. Constr Manag Econ 23(2): 215-223.
-
(2005)
Constr Manag Econ
, vol.23
, Issue.2
, pp. 215-223
-
-
Islam, M.D.M.1
Faniran, O.O.2
-
10
-
-
13944261983
-
Performance in international construction joint ventures: Model perspective
-
Mohamed S (2003) Performance in international construction joint ventures: model perspective. J Constr Eng Manag ASCE 129(6): 619-626.
-
(2003)
J Constr Eng Manag ASCE
, vol.129
, Issue.6
, pp. 619-626
-
-
Mohamed, S.1
-
11
-
-
0034225610
-
Structural equation model of construction contract dispute potential
-
Molenaar K, Washington S, Diekmann J (2000) Structural equation model of construction contract dispute potential. J Constr Eng Manag ASCE 126(4): 268-277.
-
(2000)
J Constr Eng Manag ASCE
, vol.126
, Issue.4
, pp. 268-277
-
-
Molenaar, K.1
Washington, S.2
Diekmann, J.3
-
12
-
-
0031644126
-
-
Moselhi O, Siqueira I (1998) Neural networks for cost estimating of structural steel buildings. AACE Int Trans IT/IM. 06, IT/IM. 06. 1-06. 4.
-
-
-
-
14
-
-
77956925284
-
-
Petroutsatou K, Lambropoulos S (2007) Early estimating of road tunnel construction Cost. Technica Chronica, Sci J Tech Chamb Greece, vol. I (1, 2): 99-110.
-
-
-
-
15
-
-
77956910571
-
Road tunnel early cost estimates using multiple regression analysis
-
Petroutsatou K, Lambropoulos S, Pantouvakis John-Paris (2006) Road tunnel early cost estimates using multiple regression analysis. Oper Res An Int J 6(3): 411-422.
-
(2006)
Oper Res An Int J
, vol.6
, Issue.3
, pp. 411-422
-
-
Petroutsatou, K.1
Lambropoulos, S.2
Pantouvakis J., -P.3
-
16
-
-
0036352330
-
-
Setyawati BR, Sahirman S, Creese RC (2002) Neural network for cost estimation. AACE Int Trans EST13. 1-EST 13. 9.
-
-
-
-
17
-
-
0031899466
-
Tunnel construction costs for tube transportation systems
-
Sinfield JV, Einstein HH (1998) Tunnel construction costs for tube transportation systems. J Constr Eng Manag ASCE 124: 48-57.
-
(1998)
J Constr Eng Manag ASCE
, vol.124
, pp. 48-57
-
-
Sinfield, J.V.1
Einstein, H.H.2
-
18
-
-
2642579411
-
Predicting accuracy of early cost estimates using factor analysis and multivariate regression
-
Trost SM, Oberlender GD (2003) Predicting accuracy of early cost estimates using factor analysis and multivariate regression. J Constr Eng Manag ASCE 129(2): 198-204.
-
(2003)
J Constr Eng Manag ASCE
, vol.129
, Issue.2
, pp. 198-204
-
-
Trost, S.M.1
Oberlender, G.D.2
-
19
-
-
0036540409
-
Predicting completed project cost using bidding data
-
Williams TP (2002) Predicting completed project cost using bidding data. Constr Manag Econ 20: 225-235.
-
(2002)
Constr Manag Econ
, vol.20
, pp. 225-235
-
-
Williams, T.P.1
-
20
-
-
15944372664
-
Structural equation model of trust and partnering success
-
Wong PSP, Cheung SO (2005) Structural equation model of trust and partnering success. J Manag Eng ASCE 21(2): 70-80.
-
(2005)
J Manag Eng ASCE
, vol.21
, Issue.2
, pp. 70-80
-
-
Wong, P.S.P.1
Cheung, S.O.2
|