Volumn 10, Issue 2, 2010, Pages 163-173

Road tunnels construction cost estimation: A structural equation model development and comparison

Author keywords

Cost estimation; Multiple regression analysis; Neural networks; Structural equation model; Tunnels

Indexed keywords


EID: 77956917233     PISSN: 11092858     EISSN: 18661505     Source Type: Journal    
DOI: 10.1007/s12351-009-0061-7     Document Type: Review
Times cited : (18)

References (20)
  • 1
    • 3242690152 scopus 로고    scopus 로고
    • A survey of current cost estimating practices
    • Akintoye A, Fitzgerald E (2000) A survey of current cost estimating practices. Constr Manag Econ 18: 161-172.
    • (2000) Constr Manag Econ , vol.18 , pp. 161-172
    • Akintoye, A.1    Fitzgerald, E.2
  • 3
    • 0002231440 scopus 로고
    • Cost estimation of timber bridges using neural networks
    • Creese RC, Li Li (1995) Cost estimation of timber bridges using neural networks. Cost Eng 37(5): 17-22.
    • (1995) Cost Eng , vol.37 , Issue.5 , pp. 17-22
    • Creese, R.C.1    Li, L.2
  • 5
    • 77956895316 scopus 로고    scopus 로고
    • Du Yon Kim, Sang Min Yeom, Seung Heom Han et al (2005) Profit forecasting model for international projects using multiple regression analysis and neural networks. In: Proceedings of the CITC-III Conference, Athens, Greece, 15-17 September 2005, pp 220-226.
  • 6
    • 77956927611 scopus 로고
    • Neural networks in civil engineering
    • Flood I, Kartam N (1994) Neural networks in civil engineering. J Comput Civ Eng 8: 31-162.
    • (1994) J Comput Civ Eng , vol.8 , pp. 31-162
    • Flood, I.1    Kartam, N.2
  • 7
    • 0442328937 scopus 로고    scopus 로고
    • What causes cost overrun in transport infrastructure projects?
    • Flyvbjerg B, Mette SH, Soren B (2004) What causes cost overrun in transport infrastructure projects? Transplant Rev 24(1): 3-18.
    • (2004) Transplant Rev , vol.24 , Issue.1 , pp. 3-18
    • Flyvbjerg, B.1    Mette, S.H.2    Soren, B.3
  • 8
    • 15744362051 scopus 로고    scopus 로고
    • Structural equation model of project planning effectiveness
    • Islam MDM, Faniran OO (2005) Structural equation model of project planning effectiveness. Constr Manag Econ 23(2): 215-223.
    • (2005) Constr Manag Econ , vol.23 , Issue.2 , pp. 215-223
    • Islam, M.D.M.1    Faniran, O.O.2
  • 10
    • 13944261983 scopus 로고    scopus 로고
    • Performance in international construction joint ventures: Model perspective
    • Mohamed S (2003) Performance in international construction joint ventures: model perspective. J Constr Eng Manag ASCE 129(6): 619-626.
    • (2003) J Constr Eng Manag ASCE , vol.129 , Issue.6 , pp. 619-626
    • Mohamed, S.1
  • 11
    • 0034225610 scopus 로고    scopus 로고
    • Structural equation model of construction contract dispute potential
    • Molenaar K, Washington S, Diekmann J (2000) Structural equation model of construction contract dispute potential. J Constr Eng Manag ASCE 126(4): 268-277.
    • (2000) J Constr Eng Manag ASCE , vol.126 , Issue.4 , pp. 268-277
    • Molenaar, K.1    Washington, S.2    Diekmann, J.3
  • 12
    • 0031644126 scopus 로고    scopus 로고
    • Moselhi O, Siqueira I (1998) Neural networks for cost estimating of structural steel buildings. AACE Int Trans IT/IM. 06, IT/IM. 06. 1-06. 4.
  • 14
    • 77956925284 scopus 로고    scopus 로고
    • Petroutsatou K, Lambropoulos S (2007) Early estimating of road tunnel construction Cost. Technica Chronica, Sci J Tech Chamb Greece, vol. I (1, 2): 99-110.
  • 15
    • 77956910571 scopus 로고    scopus 로고
    • Road tunnel early cost estimates using multiple regression analysis
    • Petroutsatou K, Lambropoulos S, Pantouvakis John-Paris (2006) Road tunnel early cost estimates using multiple regression analysis. Oper Res An Int J 6(3): 411-422.
    • (2006) Oper Res An Int J , vol.6 , Issue.3 , pp. 411-422
    • Petroutsatou, K.1    Lambropoulos, S.2    Pantouvakis J., -P.3
  • 16
    • 0036352330 scopus 로고    scopus 로고
    • Setyawati BR, Sahirman S, Creese RC (2002) Neural network for cost estimation. AACE Int Trans EST13. 1-EST 13. 9.
  • 17
    • 0031899466 scopus 로고    scopus 로고
    • Tunnel construction costs for tube transportation systems
    • Sinfield JV, Einstein HH (1998) Tunnel construction costs for tube transportation systems. J Constr Eng Manag ASCE 124: 48-57.
    • (1998) J Constr Eng Manag ASCE , vol.124 , pp. 48-57
    • Sinfield, J.V.1    Einstein, H.H.2
  • 18
    • 2642579411 scopus 로고    scopus 로고
    • Predicting accuracy of early cost estimates using factor analysis and multivariate regression
    • Trost SM, Oberlender GD (2003) Predicting accuracy of early cost estimates using factor analysis and multivariate regression. J Constr Eng Manag ASCE 129(2): 198-204.
    • (2003) J Constr Eng Manag ASCE , vol.129 , Issue.2 , pp. 198-204
    • Trost, S.M.1    Oberlender, G.D.2
  • 19
    • 0036540409 scopus 로고    scopus 로고
    • Predicting completed project cost using bidding data
    • Williams TP (2002) Predicting completed project cost using bidding data. Constr Manag Econ 20: 225-235.
    • (2002) Constr Manag Econ , vol.20 , pp. 225-235
    • Williams, T.P.1
  • 20
    • 15944372664 scopus 로고    scopus 로고
    • Structural equation model of trust and partnering success
    • Wong PSP, Cheung SO (2005) Structural equation model of trust and partnering success. J Manag Eng ASCE 21(2): 70-80.
    • (2005) J Manag Eng ASCE , vol.21 , Issue.2 , pp. 70-80
    • Wong, P.S.P.1    Cheung, S.O.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.