메뉴 건너뛰기




Volumn 50, Issue 20, 2012, Pages 5986-6004

Scheduling dynamic block assembly in shipbuilding through hybrid simulation and spatial optimisation

Author keywords

dynamic scheduling; shipbuilding; simulation; spatial planning

Indexed keywords

ACCURATE PREDICTION; BLOCK PLACEMENT; CONTROL POLICY; DISCRETE EVENTS; DYNAMIC SCHEDULING; EXPERIMENTAL INVESTIGATIONS; HYBRID SIMULATION; LOOK-AHEAD SCHEDULING; OPTIMISATIONS; PLANNING METHOD; PRIORITY RULES; PRODUCTION SYSTEM; RULE BASED; SCHEDULING BLOCK; SCHEDULING DYNAMICS; SEARCH ALGORITHMS; SHIPYARD PRODUCTION; SIMULATION; SPATIAL CONFIGURATION; SPATIAL LAYOUT; SPATIAL OPERATIONS; SPATIAL PLANNING; SPATIAL RESOURCES; STOCHASTIC NATURE;

EID: 84867341632     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207543.2011.639816     Document Type: Article
Times cited : (21)

References (45)
  • 2
    • 77950865187 scopus 로고    scopus 로고
    • Hierarchical production planning for semiconductor wafer fabrication based on linear programming and discrete-event simulation
    • Bang, J.Y. and Kim, Y.D., 2010. Hierarchical production planning for semiconductor wafer fabrication based on linear programming and discrete-event simulation. IEEE Transactions on Automation Science and Engineering, 7 (2), 326-336.
    • (2010) IEEE Transactions on Automation Science and Engineering , vol.7 , Issue.2 , pp. 326-336
    • Bang, J.Y.1    Kim, Y.D.2
  • 3
    • 84867394684 scopus 로고    scopus 로고
    • Discrete-event system simulation, 2008. The geometry of nesting problems: A tutorial
    • Engelwood Cliffs, NJ: Prentice Hall. Bennell, J.A. and Oliveira, J.F., 2008. The geometry of nesting problems: A tutorial
    • Banks, J., et al., 2003. Discrete-event system simulation. Engelwood Cliffs, NJ: Prentice Hall. Bennell, J.A. and Oliveira, J.F., 2008. The geometry of nesting problems: A tutorial. European Journal of Operational Research, 184 (2), 397-415.
    • (2003) European Journal of Operational Research , vol.184 , Issue.2 , pp. 397-415
    • Banks, J.1
  • 4
  • 5
    • 0032638699 scopus 로고    scopus 로고
    • Production planning using a hybrid simulation-analytical approach
    • Byrne, M.D. and Bakir, M.A., 1999. Production planning using a hybrid simulation-analytical approach. International Journal of Production Economics, 59 (1-3), 305-311.
    • (1999) International Journal of Production Economics , vol.59 , Issue.1-3 , pp. 305-311
    • Byrne, M.D.1    Bakir, M.A.2
  • 6
    • 0034957508 scopus 로고    scopus 로고
    • A spatial scheduling system for block painting process in shipbuilding
    • Cho, K.K., et al., 2001. A spatial scheduling system for block painting process in shipbuilding. CIRP Annual Manufacturing Technology, 50 (1), 339-342.
    • (2001) CIRP Annual Manufacturing Technology , vol.50 , Issue.1 , pp. 339-342
    • Cho, K.K.1
  • 7
    • 85014157956 scopus 로고    scopus 로고
    • London: Butterworth-Heinemann
    • Eyres, D.J., 2007. Ship construction. London: Butterworth-Heinemann.
    • (2007) Ship Construction
    • Eyres, D.J.1
  • 8
    • 0016534815 scopus 로고
    • Determining the minimum-area encasing rectangle for an arbitrary closed curve
    • Freeman, H. and Shapira, R., 1975. Determining the minimum-area encasing rectangle for an arbitrary closed curve. Communications of the ACM, 18 (7), 409-413.
    • (1975) Communications of the ACM , vol.18 , Issue.7 , pp. 409-413
    • Freeman, H.1    Shapira, R.2
  • 10
    • 0032641064 scopus 로고    scopus 로고
    • Scheduling in the dynamic job shop under auxiliary resource constraints: A simulation study
    • Gargeya, V.B. and Deane, R.H., 1999. Scheduling in the dynamic job shop under auxiliary resource constraints: A simulation study. International Journal of Production Research, 37 (12), 2817-2834.
    • (1999) International Journal of Production Research , vol.37 , Issue.12 , pp. 2817-2834
    • Gargeya, V.B.1    Deane, R.H.2
  • 11
    • 67749116482 scopus 로고    scopus 로고
    • Integrating simulation and genetic algorithm to schedule a dynamic flexible job shop
    • Gholami, M. and Zandieh, M., 2009. Integrating simulation and genetic algorithm to schedule a dynamic flexible job shop. Journal of Intelligent Manufacturing, 20 (4), 481-498.
    • (2009) Journal of Intelligent Manufacturing , vol.20 , Issue.4 , pp. 481-498
    • Gholami, M.1    Zandieh, M.2
  • 12
    • 80052169302 scopus 로고
    • A group technology approach to master scheduling of shipbuilding projects
    • 24-26 August 1998, Seattle, Washington
    • Gribsokov, J., 1988. A group technology approach to master scheduling of shipbuilding projects. In: Proceedings of the 1988 NSAP ship production symposium, 24-26 August 1998, Seattle, Washington.
    • (1988) Proceedings of the 1988 NSAP Ship Production Symposium
    • Gribsokov, J.1
  • 13
    • 0010848666 scopus 로고    scopus 로고
    • An extended dispatching rule approach in an on-line scheduling framework for batch process management
    • Ishii, N. and Muraki, M., 1996. An extended dispatching rule approach in an on-line scheduling framework for batch process management. International Journal of Production Research, 34 (2), 329-348.
    • (1996) International Journal of Production Research , vol.34 , Issue.2 , pp. 329-348
    • Ishii, N.1    Muraki, M.2
  • 14
    • 0032163477 scopus 로고    scopus 로고
    • A real-time scheduling mechanism for a flexible manufacturing system: Using simulation and dispatching rules
    • Jeong, K.C. and Kim, Y.D., 1998. A real-time scheduling mechanism for a flexible manufacturing system: Using simulation and dispatching rules. International Journal of Production Research, 36 (9), 2609-2626.
    • (1998) International Journal of Production Research , vol.36 , Issue.9 , pp. 2609-2626
    • Jeong, K.C.1    Kim, Y.D.2
  • 17
    • 0028594405 scopus 로고
    • Simulation-based real-time scheduling mechanism in a flexible manufacturing system
    • Kim, M.H. and Kim, Y.D., 1994. Simulation-based real-time scheduling mechanism in a flexible manufacturing system. Journal of Manufacturing System, 13 (2), 85-93.
    • (1994) Journal of Manufacturing System , vol.13 , Issue.2 , pp. 85-93
    • Kim, M.H.1    Kim, Y.D.2
  • 18
    • 0031705292 scopus 로고    scopus 로고
    • A simulation study on lot release control, mask scheduling, and batch scheduling in semiconductor wafer fabrication facilities
    • Kim, Y.D., Lee, D.H., and Kim, J.U., 1998. A simulation study on lot release control, mask scheduling, and batch scheduling in semiconductor wafer fabrication facilities. Journal of Manufacturing System, 17 (2), 107-117.
    • (1998) Journal of Manufacturing System , vol.17 , Issue.2 , pp. 107-117
    • Kim, Y.D.1    Lee, D.H.2    Kim, J.U.3
  • 19
    • 0040621775 scopus 로고    scopus 로고
    • Experimental investigation of iterative simulation-based scheduling in a dynamic and stochastic job shop
    • Kutanoglu, E. and Sabuncuoglu, I., 2001. Experimental investigation of iterative simulation-based scheduling in a dynamic and stochastic job shop. Journal of Manufacturing System, 20 (4), 264-279.
    • (2001) Journal of Manufacturing System , vol.20 , Issue.4 , pp. 264-279
    • Kutanoglu, E.1    Sabuncuoglu, I.2
  • 20
    • 0031103567 scopus 로고    scopus 로고
    • Developing scheduling systems for Daewoo shipbuilding: DAS project
    • Lee, J.K., et al., 1997. Developing scheduling systems for Daewoo shipbuilding: DAS project. European Journal of Operational Research, 97 (2), 380-395.
    • (1997) European Journal of Operational Research , vol.97 , Issue.2 , pp. 380-395
    • Lee, J.K.1
  • 21
    • 0029700032 scopus 로고    scopus 로고
    • A spatial scheduling system and its application to shipbuilding: DAS-CURVE
    • Lee, K.J. and Lee, J.K., 1996. A spatial scheduling system and its application to shipbuilding: DAS-CURVE. Expert System with Application, 10 (3/4), 311-324.
    • (1996) Expert System with Application , vol.10 , Issue.3-4 , pp. 311-324
    • Lee, K.J.1    Lee, J.K.2
  • 22
    • 48049100176 scopus 로고    scopus 로고
    • Simulation-based planning and control: From shop floor to top floor
    • Lee, S., Son, Y.J., and Wysk, R.A., 2007. Simulation-based planning and control: From shop floor to top floor. Journal of Manufacturing System, 26 (2), 85-98.
    • (2007) Journal of Manufacturing System , vol.26 , Issue.2 , pp. 85-98
    • Lee, S.1    Son, Y.J.2    Wysk, R.A.3
  • 24
    • 84867344242 scopus 로고    scopus 로고
    • Available from: [Accessed 10 January 2010]
    • Liker, J.K. and Lamb, T., 2000. Lean manufacturing principles guide [online]. Available from: Http://www.nsrp.org/ Project-Information/major- projects/deliverables/ase-91000.pdf [Accessed 10 January 2010].
    • (2000) Lean Manufacturing Principles Guide [online]
    • Liker, J.K.1    Lamb, T.2
  • 25
    • 80052147949 scopus 로고    scopus 로고
    • Aggregate production planning for shipbuilding with variation-inventory tradeoffs
    • Liu, Z., Chua, D.K.H., and Yoeh, K.W., 2011. Aggregate production planning for shipbuilding with variation-inventory tradeoffs. International Journal of Production Research, 49 (20), 6249-6272.
    • (2011) International Journal of Production Research , vol.49 , Issue.20 , pp. 6249-6272
    • Liu, Z.1    Chua, D.K.H.2    Yoeh, K.W.3
  • 27
    • 0020706698 scopus 로고
    • Spatial planning: A configuration space approach
    • Lozano-Perez, T., 1983. Spatial planning: A configuration space approach. IEEE Transactions on Computing, 32 (2), 108-120.
    • (1983) IEEE Transactions on Computing , vol.32 , Issue.2 , pp. 108-120
    • Lozano-Perez, T.1
  • 28
    • 84867340874 scopus 로고    scopus 로고
    • NISTSEMATECH 2003. E-Handbook of statistical methods [online]. Available from: [Accessed 12 January 2011]
    • NIST/SEMATECH, 2003. E-Handbook of statistical methods [online]. Available from: Http://www.itl.nist.gov/div898/handbook/ [Accessed 12 January 2011].
  • 29
    • 0036610212 scopus 로고    scopus 로고
    • A spatial scheduling application at the block paint shop in shipbuilding: The HYPOS project
    • Park, C., et al., 2002. A spatial scheduling application at the block paint shop in shipbuilding: The HYPOS project. Production Planning & Control, 13 (4), 342-354.
    • (2002) Production Planning & Control , vol.13 , Issue.4 , pp. 342-354
    • Park, C.1
  • 30
    • 0030196914 scopus 로고    scopus 로고
    • Modelling and solving the spatial block scheduling problem in a shipbuilding company
    • Park, K., et al., 1996. Modelling and solving the spatial block scheduling problem in a shipbuilding company. Computer and Industrial Engineering, 30 (3), 357-364.
    • (1996) Computer and Industrial Engineering , vol.30 , Issue.3 , pp. 357-364
    • Park, K.1
  • 32
    • 0023437076 scopus 로고
    • A comparative analysis of the COVERT job sequencing rule using various shop performance measures
    • Russel, R.S., Dar-el, E.M., and Taylor, B.W., 1987. A comparative analysis of the COVERT job sequencing rule using various shop performance measures. International Journal of Production Research, 25 (10), 1523-1540.
    • (1987) International Journal of Production Research , vol.25 , Issue.10 , pp. 1523-1540
    • Russel, R.S.1    Dar-el, E.M.2    Taylor, B.W.3
  • 33
    • 54949115886 scopus 로고    scopus 로고
    • Development of integrated and interactive spatial planning system of assembly blocks in shipbuilding
    • Ryu, C., Shin, J.G., and Lee, J.M., 2008. Development of integrated and interactive spatial planning system of assembly blocks in shipbuilding. International Journal of Computer Integrated Manufacturing, 21 (8), 911-922.
    • (2008) International Journal of Computer Integrated Manufacturing , vol.21 , Issue.8 , pp. 911-922
    • Ryu, C.1    Shin, J.G.2    Lee, J.M.3
  • 34
    • 0032000897 scopus 로고    scopus 로고
    • A study of scheduling rules of flexible manufacturing systems: A simulation approach
    • Sabuncuoglu, I., 1998. A study of scheduling rules of flexible manufacturing systems: A simulation approach. International Journal of Production Research, 36 (2), 527-546.
    • (1998) International Journal of Production Research , vol.36 , Issue.2 , pp. 527-546
    • Sabuncuoglu, I.1
  • 35
    • 57349088203 scopus 로고    scopus 로고
    • Heuristic and meta-heuristic spatial planning of assembly blocks with process schedules in an assembly shop using differential evolution
    • Shin, J.G., Kwon, O.H., and Ryu, C., 2008. Heuristic and meta-heuristic spatial planning of assembly blocks with process schedules in an assembly shop using differential evolution. Production Planning & Control, 19 (6), 605-615.
    • (2008) Production Planning & Control , vol.19 , Issue.6 , pp. 605-615
    • Shin, J.G.1    Kwon, O.H.2    Ryu, C.3
  • 36
    • 3042692204 scopus 로고    scopus 로고
    • Survey on the use of simulation for manufacturing system design and operation
    • Smith, J.S., 2003. Survey on the use of simulation for manufacturing system design and operation. Journal of Manufacturing System, 22 (2), 157-171.
    • (2003) Journal of Manufacturing System , vol.22 , Issue.2 , pp. 157-171
    • Smith, J.S.1
  • 37
    • 0042370532 scopus 로고    scopus 로고
    • Simulation-based shop floor control
    • Son, Y.J., et al., 2002. Simulation-based shop floor control. Journal of Manufacturing System, 21 (5), 380-394.
    • (2002) Journal of Manufacturing System , vol.21 , Issue.5 , pp. 380-394
    • Son, Y.J.1
  • 39
  • 40
    • 0023399009 scopus 로고
    • Priority rules for job shops with weighted tardiness costs
    • Vepsalainen, A.P.J. and Morton, T.E., 1987. Priority rules for job shops with weighted tardiness costs. Management Science, 33 (8), 1035-1047.
    • (1987) Management Science , vol.33 , Issue.8 , pp. 1035-1047
    • Vepsalainen, A.P.J.1    Morton, T.E.2
  • 41
    • 0024731596 scopus 로고
    • An application of discrete-event simulation to on-line control and scheduling in flexible manufacturing
    • Wu, S.Y.D. and Wysk, R.A., 1989. An application of discrete-event simulation to on-line control and scheduling in flexible manufacturing. International Journal of Production Research, 27 (9), 1603-1623.
    • (1989) International Journal of Production Research , vol.27 , Issue.9 , pp. 1603-1623
    • Wu, S.Y.D.1    Wysk, R.A.2
  • 42
    • 60549105193 scopus 로고    scopus 로고
    • An evolutionary simulation-optimization approach in solving parallel-machine scheduling problems - A case study
    • Yang, T., 2009. An evolutionary simulation-optimization approach in solving parallel-machine scheduling problems - A case study. Computer & Industrial Engineering, 56 (3), 1126-1136.
    • (2009) Computer & Industrial Engineering , vol.56 , Issue.3 , pp. 1126-1136
    • Yang, T.1
  • 43
    • 5144226254 scopus 로고    scopus 로고
    • Tabu-search simulation optimization approach for flow-shop scheduling with multiple processors - A case study
    • Yang, T., Kuo, Y., and Chang, I., 2004. Tabu-search simulation optimization approach for flow-shop scheduling with multiple processors - A case study. International Journal of Production Research, 42 (19), 4015-4030.
    • (2004) International Journal of Production Research , vol.42 , Issue.19 , pp. 4015-4030
    • Yang, T.1    Kuo, Y.2    Chang, I.3
  • 44
    • 56549110421 scopus 로고    scopus 로고
    • Integrating simulation and optimization to schedule loading operations in container terminals
    • Zeng, Q. and Yang, Z., 2009. Integrating simulation and optimization to schedule loading operations in container terminals. Computers & Operations Research, 36 (6), 1935-1944.
    • (2009) Computers & Operations Research , vol.36 , Issue.6 , pp. 1935-1944
    • Zeng, Q.1    Yang, Z.2
  • 45
    • 60949107906 scopus 로고    scopus 로고
    • Simulation-based optimization of dispatching rules for semiconductor wafer fabrication system scheduling by the response surface method
    • Zhang, H., Jiang, Z., and Guo, C., 2009. Simulation-based optimization of dispatching rules for semiconductor wafer fabrication system scheduling by the response surface method. International Journal of Advanced Manufacturing Technology, 41 (1-2), 110-121.
    • (2009) International Journal of Advanced Manufacturing Technology , vol.41 , Issue.1-2 , pp. 110-121
    • Zhang, H.1    Jiang, Z.2    Guo, C.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.