-
1
-
-
0028429339
-
A review of machine learning in scheduling
-
Aytug, H.; Bhattacharyya, S.; Koehler, G.J.; and Snowdon, J.L. (1994). "A review of machine learning in scheduling." IEEE Trans. on Engg. Mgmt. (v41, n2), pp165-171.
-
(1994)
IEEE Trans. on Engg. Mgmt.
, vol.41
, Issue.2
, pp. 165-171
-
-
Aytug, H.1
Bhattacharyya, S.2
Koehler, G.J.3
Snowdon, J.L.4
-
2
-
-
0028516860
-
Genetic learning of dynamic scheduling within a simulation environment
-
Aytug, H.; Koehler, G.J.; and Snowdon, J.L. (1994). "Genetic learning of dynamic scheduling within a simulation environment." Computers and Operations Research (v21, n8), pp909-925.
-
(1994)
Computers and Operations Research
, vol.21
, Issue.8
, pp. 909-925
-
-
Aytug, H.1
Koehler, G.J.2
Snowdon, J.L.3
-
3
-
-
0002563758
-
Job shop scheduling with modified due dates
-
Baker, K.R. and Kanet, J.J. (1983). "Job shop scheduling with modified due dates." Journal of Operations Mgmt. (v4, n1). pp11-22.
-
(1983)
Journal of Operations Mgmt.
, vol.4
, Issue.1
, pp. 11-22
-
-
Baker, K.R.1
Kanet, J.J.2
-
5
-
-
0027576654
-
A robust adaptive scheduler for an intelligent workstation controller
-
Cho, H. and Wysk, R.A. (1993). "A robust adaptive scheduler for an intelligent workstation controller." Int'l Journal of Production Research (v31, n4), pp771-789.
-
(1993)
Int'l Journal of Production Research
, vol.31
, Issue.4
, pp. 771-789
-
-
Cho, H.1
Wysk, R.A.2
-
6
-
-
0000522889
-
Analysis of periodic and event-driven rescheduling policies in dynamic shops
-
Church, L.K. and Uzsoy, R. (1992). "Analysis of periodic and event-driven rescheduling policies in dynamic shops." Int'l Journal of Computer Integrated Mfg. (v5, n3), pp153-163.
-
(1992)
Int'l Journal of Computer Integrated Mfg.
, vol.5
, Issue.3
, pp. 153-163
-
-
Church, L.K.1
Uzsoy, R.2
-
7
-
-
84946299028
-
A real-time production scheduler for a stochastic manufacturing environment
-
Davis, W.J. and Jones, A.T. (1988). "A real-time production scheduler for a stochastic manufacturing environment." Int'l Journal of Computer Integrated Mfg. (v1, n2), pp 101-112.
-
(1988)
Int'l Journal of Computer Integrated Mfg.
, vol.1
, Issue.2
, pp. 101-112
-
-
Davis, W.J.1
Jones, A.T.2
-
8
-
-
0025564697
-
Implementation issues using simulation for real-time scheduling, control, and monitoring
-
1990
-
Harmonosky, C.M. (1990). "Implementation issues using simulation for real-time scheduling, control, and monitoring." Proc. of Winter Simulation Conf., 1990.
-
(1990)
Proc. of Winter Simulation Conf.
-
-
Harmonosky, C.M.1
-
9
-
-
0027841423
-
Analysis of two key issues for using simulation for real-time production control
-
1993
-
Harmonosky, C.M. (1993). "Analysis of two key issues for using simulation for real-time production control." Proc. of 2nd Industrial Engg. Research Conf., 1993.
-
(1993)
Proc. of 2nd Industrial Engg. Research Conf.
-
-
Harmonosky, C.M.1
-
10
-
-
0001982473
-
Real-time scheduling in a computer integrated manufacturing: A review of recent research
-
Harmonosky, C.M. and Robohn, S.F. (1991). "Real-time scheduling in a computer integrated manufacturing: a review of recent research." Int'l Journal of Computer Integrated Mfg. (v4, n6), pp331-340.
-
(1991)
Int'l Journal of Computer Integrated Mfg.
, vol.4
, Issue.6
, pp. 331-340
-
-
Harmonosky, C.M.1
Robohn, S.F.2
-
11
-
-
0005874462
-
Imestigating the application potential of simulation to real-time control decisions
-
Harmonosky, C.M. and Robohn, S.F. (1995). "Imestigating the application potential of simulation to real-time control decisions." Int'l Journal of Computer Integrated Mfg. (v8, n2), pp126-132.
-
(1995)
Int'l Journal of Computer Integrated Mfg.
, vol.8
, Issue.2
, pp. 126-132
-
-
Harmonosky, C.M.1
Robohn, S.F.2
-
12
-
-
0026374056
-
A transient-based real-time scheduling algorithm in FMS
-
Ishii, N. and Talavage, J.J. (1991). "A transient-based real-time scheduling algorithm in FMS." Int'l Journal of Production Research (v29, n12), pp2501-2520.
-
(1991)
Int'l Journal of Production Research
, vol.29
, Issue.12
, pp. 2501-2520
-
-
Ishii, N.1
Talavage, J.J.2
-
13
-
-
0028127531
-
A mixed dispatching rule approach in FMS scheduling
-
Ishii, N. and Talavage, J.J. (1994). "A mixed dispatching rule approach in FMS scheduling." Int'l Journal of Flexible Mfg. Systems (v2, n6), pp69-87.
-
(1994)
Int'l Journal of Flexible Mfg. Systems
, vol.2
, Issue.6
, pp. 69-87
-
-
Ishii, N.1
Talavage, J.J.2
-
14
-
-
0028594405
-
Simulation-based real-time scheduling in a flexible manufacturing system
-
Kim, M.H. and Kim, Y. (1994). "Simulation-based real-time scheduling in a flexible manufacturing system." Journal of Manufacturing Systems (v13, n2), pp85-93.
-
(1994)
Journal of Manufacturing Systems
, vol.13
, Issue.2
, pp. 85-93
-
-
Kim, M.H.1
Kim, Y.2
-
15
-
-
0040075018
-
Tardiness heuristic for scheduling flexible manufacturing systems
-
Kiran, A.S.; Alptekin, S.; and Kaplan, A.C. (1991). "Tardiness heuristic for scheduling flexible manufacturing systems." Production Planning and Control (v2, n3), pp228-241.
-
(1991)
Production Planning and Control
, vol.2
, Issue.3
, pp. 228-241
-
-
Kiran, A.S.1
Alptekin, S.2
Kaplan, A.C.3
-
16
-
-
0032784020
-
An analysis of heuristics in a dynamic job shop with weighted tardiness objectives
-
Kutanoglu, E. and Sabuncuoglu, I. (1999). "An analysis of heuristics in a dynamic job shop with weighted tardiness objectives." Int'l Journal of Production Research (v37, n1), pp165-187.
-
(1999)
Int'l Journal of Production Research
, vol.37
, Issue.1
, pp. 165-187
-
-
Kutanoglu, E.1
Sabuncuoglu, I.2
-
18
-
-
0031069765
-
Heuristic, optimal, static, and dynamic schedules when processing times are uncertain
-
Lawrence, S.R. and Sewell, E.C. (1997). "Heuristic, optimal, static, and dynamic schedules when processing times are uncertain." Journal of Operations Mgmt. (v15), pp71-82.
-
(1997)
Journal of Operations Mgmt.
, vol.15
, pp. 71-82
-
-
Lawrence, S.R.1
Sewell, E.C.2
-
19
-
-
0003043947
-
Design of a knowledge-based on-line simulation system to control a manufacturing shop floor
-
Manivannan, S. and Banks, J. (1992). "Design of a knowledge-based on-line simulation system to control a manufacturing shop floor." IIE Trans. (v24, n3), pp72-80.
-
(1992)
IIE Trans.
, vol.24
, Issue.3
, pp. 72-80
-
-
Manivannan, S.1
Banks, J.2
-
21
-
-
0028452709
-
Rolling horizon algorithms for a single-machine dynamic scheduling problem with sequence-dependent setup times
-
Ovacik, I.M. and Uzsoy, R. (1994). "Rolling horizon algorithms for a single-machine dynamic scheduling problem with sequence-dependent setup times." Int'l Journal of Production Research (v32, n6), pp1243-1263.
-
(1994)
Int'l Journal of Production Research
, vol.32
, Issue.6
, pp. 1243-1263
-
-
Ovacik, I.M.1
Uzsoy, R.2
-
22
-
-
0004282518
-
-
North Carolina: SAS Institute
-
SAS Institute. (1994). "SAS,STAT(R) User's Guide." North Carolina: SAS Institute.
-
(1994)
SAS,STAT(R) User's Guide
-
-
-
23
-
-
38249014416
-
A knowledge-based simulation architecture to analyze interruptions in a flexible manufacturing system
-
Tayanithi, P.; Manivannan, S.; and Banks, J. (1993a). "A knowledge-based simulation architecture to analyze interruptions in a flexible manufacturing system." Journal of Manufacturing Systems (v11, n3), pp195-214.
-
(1993)
Journal of Manufacturing Systems
, vol.11
, Issue.3
, pp. 195-214
-
-
Tayanithi, P.1
Manivannan, S.2
Banks, J.3
-
24
-
-
0027150722
-
Complexity reduction during interruption analysis in a flexible manufacturing system using a knowledge-based on-line simulation
-
Tayanithi, P.; Manivannan, S.; and Banks, J. (1993b). "Complexity reduction during interruption analysis in a flexible manufacturing system using a knowledge-based on-line simulation." Journal of Manufacturing Systems (v12, n2), pp153-169.
-
(1993)
Journal of Manufacturing Systems
, vol.12
, Issue.2
, pp. 153-169
-
-
Tayanithi, P.1
Manivannan, S.2
Banks, J.3
-
25
-
-
0023399009
-
Priority rules for job shops with weighted tardiness costs
-
Vepsalainen, A.P.J. and Morton, T.E. (1987). "Priority rules for job shops with weighted tardiness costs." Mgmt. Science (v33, n8), pp1035-1047.
-
(1987)
Mgmt. Science
, vol.33
, Issue.8
, pp. 1035-1047
-
-
Vepsalainen, A.P.J.1
Morton, T.E.2
-
26
-
-
0001336436
-
Improving local priority rules with global lead-time estimates: A simulation study
-
Vepsalainen, A.P.J. and Morton, T.E. (1988). "Improving local priority rules with global lead-time estimates: a simulation study." Journal of Mfg. and Operations Mgmt. (v1, n2), pp102-118.
-
(1988)
Journal of Mfg. and Operations Mgmt.
, vol.1
, Issue.2
, pp. 102-118
-
-
Vepsalainen, A.P.J.1
Morton, T.E.2
-
27
-
-
0023868237
-
Multi-pass expert control system - A control scheduling structure for flexible manufacturing cells
-
Wu, S.D. and Wysk, R.A. (1988). "Multi-pass expert control system - a control scheduling structure for flexible manufacturing cells." Journal of Manufacturing Systems (v7, n2), pp107-120.
-
(1988)
Journal of Manufacturing Systems
, vol.7
, Issue.2
, pp. 107-120
-
-
Wu, S.D.1
Wysk, R.A.2
-
28
-
-
0024731596
-
An application of discrete-event simulation to on-line control and scheduling in flexible manufacturing
-
Wu, S.D. and Wysk, R.A. (1989). "An application of discrete-event simulation to on-line control and scheduling in flexible manufacturing." Int'l Journal of Production Research (v27, n9), pp1603-1623.
-
(1989)
Int'l Journal of Production Research
, vol.27
, Issue.9
, pp. 1603-1623
-
-
Wu, S.D.1
Wysk, R.A.2
|