메뉴 건너뛰기




Volumn 20, Issue 4, 2001, Pages 264-279

Experimental investigation of iterative simulation-based scheduling in a dynamic and stochastic job shop

Author keywords

Scheduling and control; Simulation methods and models

Indexed keywords


EID: 0040621775     PISSN: 02786125     EISSN: None     Source Type: Journal    
DOI: 10.1016/s0278-6125(01)80046-7     Document Type: Article
Times cited : (51)

References (28)
  • 2
    • 0028516860 scopus 로고
    • Genetic learning of dynamic scheduling within a simulation environment
    • Aytug, H.; Koehler, G.J.; and Snowdon, J.L. (1994). "Genetic learning of dynamic scheduling within a simulation environment." Computers and Operations Research (v21, n8), pp909-925.
    • (1994) Computers and Operations Research , vol.21 , Issue.8 , pp. 909-925
    • Aytug, H.1    Koehler, G.J.2    Snowdon, J.L.3
  • 3
    • 0002563758 scopus 로고
    • Job shop scheduling with modified due dates
    • Baker, K.R. and Kanet, J.J. (1983). "Job shop scheduling with modified due dates." Journal of Operations Mgmt. (v4, n1). pp11-22.
    • (1983) Journal of Operations Mgmt. , vol.4 , Issue.1 , pp. 11-22
    • Baker, K.R.1    Kanet, J.J.2
  • 5
    • 0027576654 scopus 로고
    • A robust adaptive scheduler for an intelligent workstation controller
    • Cho, H. and Wysk, R.A. (1993). "A robust adaptive scheduler for an intelligent workstation controller." Int'l Journal of Production Research (v31, n4), pp771-789.
    • (1993) Int'l Journal of Production Research , vol.31 , Issue.4 , pp. 771-789
    • Cho, H.1    Wysk, R.A.2
  • 6
    • 0000522889 scopus 로고
    • Analysis of periodic and event-driven rescheduling policies in dynamic shops
    • Church, L.K. and Uzsoy, R. (1992). "Analysis of periodic and event-driven rescheduling policies in dynamic shops." Int'l Journal of Computer Integrated Mfg. (v5, n3), pp153-163.
    • (1992) Int'l Journal of Computer Integrated Mfg. , vol.5 , Issue.3 , pp. 153-163
    • Church, L.K.1    Uzsoy, R.2
  • 7
    • 84946299028 scopus 로고
    • A real-time production scheduler for a stochastic manufacturing environment
    • Davis, W.J. and Jones, A.T. (1988). "A real-time production scheduler for a stochastic manufacturing environment." Int'l Journal of Computer Integrated Mfg. (v1, n2), pp 101-112.
    • (1988) Int'l Journal of Computer Integrated Mfg. , vol.1 , Issue.2 , pp. 101-112
    • Davis, W.J.1    Jones, A.T.2
  • 8
    • 0025564697 scopus 로고
    • Implementation issues using simulation for real-time scheduling, control, and monitoring
    • 1990
    • Harmonosky, C.M. (1990). "Implementation issues using simulation for real-time scheduling, control, and monitoring." Proc. of Winter Simulation Conf., 1990.
    • (1990) Proc. of Winter Simulation Conf.
    • Harmonosky, C.M.1
  • 9
    • 0027841423 scopus 로고
    • Analysis of two key issues for using simulation for real-time production control
    • 1993
    • Harmonosky, C.M. (1993). "Analysis of two key issues for using simulation for real-time production control." Proc. of 2nd Industrial Engg. Research Conf., 1993.
    • (1993) Proc. of 2nd Industrial Engg. Research Conf.
    • Harmonosky, C.M.1
  • 10
    • 0001982473 scopus 로고
    • Real-time scheduling in a computer integrated manufacturing: A review of recent research
    • Harmonosky, C.M. and Robohn, S.F. (1991). "Real-time scheduling in a computer integrated manufacturing: a review of recent research." Int'l Journal of Computer Integrated Mfg. (v4, n6), pp331-340.
    • (1991) Int'l Journal of Computer Integrated Mfg. , vol.4 , Issue.6 , pp. 331-340
    • Harmonosky, C.M.1    Robohn, S.F.2
  • 11
    • 0005874462 scopus 로고
    • Imestigating the application potential of simulation to real-time control decisions
    • Harmonosky, C.M. and Robohn, S.F. (1995). "Imestigating the application potential of simulation to real-time control decisions." Int'l Journal of Computer Integrated Mfg. (v8, n2), pp126-132.
    • (1995) Int'l Journal of Computer Integrated Mfg. , vol.8 , Issue.2 , pp. 126-132
    • Harmonosky, C.M.1    Robohn, S.F.2
  • 12
    • 0026374056 scopus 로고
    • A transient-based real-time scheduling algorithm in FMS
    • Ishii, N. and Talavage, J.J. (1991). "A transient-based real-time scheduling algorithm in FMS." Int'l Journal of Production Research (v29, n12), pp2501-2520.
    • (1991) Int'l Journal of Production Research , vol.29 , Issue.12 , pp. 2501-2520
    • Ishii, N.1    Talavage, J.J.2
  • 13
    • 0028127531 scopus 로고
    • A mixed dispatching rule approach in FMS scheduling
    • Ishii, N. and Talavage, J.J. (1994). "A mixed dispatching rule approach in FMS scheduling." Int'l Journal of Flexible Mfg. Systems (v2, n6), pp69-87.
    • (1994) Int'l Journal of Flexible Mfg. Systems , vol.2 , Issue.6 , pp. 69-87
    • Ishii, N.1    Talavage, J.J.2
  • 14
    • 0028594405 scopus 로고
    • Simulation-based real-time scheduling in a flexible manufacturing system
    • Kim, M.H. and Kim, Y. (1994). "Simulation-based real-time scheduling in a flexible manufacturing system." Journal of Manufacturing Systems (v13, n2), pp85-93.
    • (1994) Journal of Manufacturing Systems , vol.13 , Issue.2 , pp. 85-93
    • Kim, M.H.1    Kim, Y.2
  • 15
    • 0040075018 scopus 로고
    • Tardiness heuristic for scheduling flexible manufacturing systems
    • Kiran, A.S.; Alptekin, S.; and Kaplan, A.C. (1991). "Tardiness heuristic for scheduling flexible manufacturing systems." Production Planning and Control (v2, n3), pp228-241.
    • (1991) Production Planning and Control , vol.2 , Issue.3 , pp. 228-241
    • Kiran, A.S.1    Alptekin, S.2    Kaplan, A.C.3
  • 16
    • 0032784020 scopus 로고    scopus 로고
    • An analysis of heuristics in a dynamic job shop with weighted tardiness objectives
    • Kutanoglu, E. and Sabuncuoglu, I. (1999). "An analysis of heuristics in a dynamic job shop with weighted tardiness objectives." Int'l Journal of Production Research (v37, n1), pp165-187.
    • (1999) Int'l Journal of Production Research , vol.37 , Issue.1 , pp. 165-187
    • Kutanoglu, E.1    Sabuncuoglu, I.2
  • 18
    • 0031069765 scopus 로고    scopus 로고
    • Heuristic, optimal, static, and dynamic schedules when processing times are uncertain
    • Lawrence, S.R. and Sewell, E.C. (1997). "Heuristic, optimal, static, and dynamic schedules when processing times are uncertain." Journal of Operations Mgmt. (v15), pp71-82.
    • (1997) Journal of Operations Mgmt. , vol.15 , pp. 71-82
    • Lawrence, S.R.1    Sewell, E.C.2
  • 19
    • 0003043947 scopus 로고
    • Design of a knowledge-based on-line simulation system to control a manufacturing shop floor
    • Manivannan, S. and Banks, J. (1992). "Design of a knowledge-based on-line simulation system to control a manufacturing shop floor." IIE Trans. (v24, n3), pp72-80.
    • (1992) IIE Trans. , vol.24 , Issue.3 , pp. 72-80
    • Manivannan, S.1    Banks, J.2
  • 21
    • 0028452709 scopus 로고
    • Rolling horizon algorithms for a single-machine dynamic scheduling problem with sequence-dependent setup times
    • Ovacik, I.M. and Uzsoy, R. (1994). "Rolling horizon algorithms for a single-machine dynamic scheduling problem with sequence-dependent setup times." Int'l Journal of Production Research (v32, n6), pp1243-1263.
    • (1994) Int'l Journal of Production Research , vol.32 , Issue.6 , pp. 1243-1263
    • Ovacik, I.M.1    Uzsoy, R.2
  • 22
    • 0004282518 scopus 로고
    • North Carolina: SAS Institute
    • SAS Institute. (1994). "SAS,STAT(R) User's Guide." North Carolina: SAS Institute.
    • (1994) SAS,STAT(R) User's Guide
  • 23
    • 38249014416 scopus 로고
    • A knowledge-based simulation architecture to analyze interruptions in a flexible manufacturing system
    • Tayanithi, P.; Manivannan, S.; and Banks, J. (1993a). "A knowledge-based simulation architecture to analyze interruptions in a flexible manufacturing system." Journal of Manufacturing Systems (v11, n3), pp195-214.
    • (1993) Journal of Manufacturing Systems , vol.11 , Issue.3 , pp. 195-214
    • Tayanithi, P.1    Manivannan, S.2    Banks, J.3
  • 24
    • 0027150722 scopus 로고
    • Complexity reduction during interruption analysis in a flexible manufacturing system using a knowledge-based on-line simulation
    • Tayanithi, P.; Manivannan, S.; and Banks, J. (1993b). "Complexity reduction during interruption analysis in a flexible manufacturing system using a knowledge-based on-line simulation." Journal of Manufacturing Systems (v12, n2), pp153-169.
    • (1993) Journal of Manufacturing Systems , vol.12 , Issue.2 , pp. 153-169
    • Tayanithi, P.1    Manivannan, S.2    Banks, J.3
  • 25
    • 0023399009 scopus 로고
    • Priority rules for job shops with weighted tardiness costs
    • Vepsalainen, A.P.J. and Morton, T.E. (1987). "Priority rules for job shops with weighted tardiness costs." Mgmt. Science (v33, n8), pp1035-1047.
    • (1987) Mgmt. Science , vol.33 , Issue.8 , pp. 1035-1047
    • Vepsalainen, A.P.J.1    Morton, T.E.2
  • 26
    • 0001336436 scopus 로고
    • Improving local priority rules with global lead-time estimates: A simulation study
    • Vepsalainen, A.P.J. and Morton, T.E. (1988). "Improving local priority rules with global lead-time estimates: a simulation study." Journal of Mfg. and Operations Mgmt. (v1, n2), pp102-118.
    • (1988) Journal of Mfg. and Operations Mgmt. , vol.1 , Issue.2 , pp. 102-118
    • Vepsalainen, A.P.J.1    Morton, T.E.2
  • 27
    • 0023868237 scopus 로고
    • Multi-pass expert control system - A control scheduling structure for flexible manufacturing cells
    • Wu, S.D. and Wysk, R.A. (1988). "Multi-pass expert control system - a control scheduling structure for flexible manufacturing cells." Journal of Manufacturing Systems (v7, n2), pp107-120.
    • (1988) Journal of Manufacturing Systems , vol.7 , Issue.2 , pp. 107-120
    • Wu, S.D.1    Wysk, R.A.2
  • 28
    • 0024731596 scopus 로고
    • An application of discrete-event simulation to on-line control and scheduling in flexible manufacturing
    • Wu, S.D. and Wysk, R.A. (1989). "An application of discrete-event simulation to on-line control and scheduling in flexible manufacturing." Int'l Journal of Production Research (v27, n9), pp1603-1623.
    • (1989) Int'l Journal of Production Research , vol.27 , Issue.9 , pp. 1603-1623
    • Wu, S.D.1    Wysk, R.A.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.