-
1
-
-
0004140981
-
-
Cincinnati, OH: South-Western Publishing)
-
Blackstone, J. H., Jr, 1989, Capacity Management (Cincinnati, OH: South-Western Publishing).
-
(1989)
Capacity Management
-
-
Blackstone, J.H.1
-
3
-
-
0030212185
-
Scheduling research in multiple resource constrained job shops: A review and critique
-
Gargeya, V. B. and Deane, R. H., 1996, Scheduling research in multiple resource constrained job shops: A review and critique. International Journal of Production Research, 34, 2077-2097.
-
(1996)
International Journal of Production Research
, vol.34
, pp. 2077-2097
-
-
Gargeya, V.B.1
Deane, R.H.2
-
4
-
-
0026883892
-
Tooling constraints and shop floor scheduling: Evaluating the impact of sequence dependency
-
Ghosh, S., Melnyk, S. A. and Ragatz, G. L., 1992, Tooling constraints and shop floor scheduling: Evaluating the impact of sequence dependency. International Journal of Production Research, 30, 1237-1253.
-
(1992)
International Journal of Production Research
, vol.30
, pp. 1237-1253
-
-
Ghosh, S.1
Melnyk, S.A.2
Ragatz, G.L.3
-
5
-
-
0003710588
-
-
Croton-on-Hudson, NY: North River Press)
-
Goldratt, E. M. and Fox, R. E., 1986, The Race (Croton-on-Hudson, NY: North River Press).
-
(1986)
The Race
-
-
Goldratt, E.M.1
Fox, R.E.2
-
7
-
-
0020822392
-
The OPT scheduling system: A review of a new production scheduling system
-
Jacobs, F. R., 1983, The OPT scheduling system: A review of a new production scheduling system. Production and Inventory Management Journal, 24, 47-51.
-
(1983)
Production and Inventory Management Journal
, vol.24
, pp. 47-51
-
-
Jacobs, F.R.1
-
9
-
-
84987012876
-
Shifting production bottlenecks: Causes, cures, and conundrums
-
Lawrence, S. R. and Buss, A. H., 1994, Shifting production bottlenecks: Causes, cures, and conundrums. Production and Operations Management, 3, 21-37.
-
(1994)
Production and Operations Management
, vol.3
, pp. 21-37
-
-
Lawrence, S.R.1
Buss, A.H.2
-
11
-
-
38249021670
-
Tooling constraints and shop floor scheduling: A simulation study
-
Melnyk, S. A., Ghosh, S. and Ragatz, G. L., 1989, Tooling constraints and shop floor scheduling: A simulation study. Journal of Operations Management, 8, 69-89.
-
(1989)
Journal of Operations Management
, vol.8
, pp. 69-89
-
-
Melnyk, S.A.1
Ghosh, S.2
Ragatz, G.L.3
-
12
-
-
0016070630
-
Heuristic methods for assigning men to machines: An experimental analysis
-
Miller, J. G. and Berry, W. L., 1974, Heuristic methods for assigning men to machines: An experimental analysis. AIIE Transactions, 6, 97-104.
-
(1974)
AIIE Transactions
, vol.6
, pp. 97-104
-
-
Miller, J.G.1
Berry, W.L.2
-
13
-
-
0003973174
-
-
Homewood, IL: Richard D. Irwin)
-
Neter, J., Wasserman, W. and Kutner, M. H., 1985, Applied Linear Statistical Models (Homewood, IL: Richard D. Irwin).
-
(1985)
Applied Linear Statistical Models
-
-
Neter, J.1
Wasserman, W.2
Kutner, M.H.3
-
15
-
-
0003486518
-
-
Sewickley, PA: Systems Modeling Corporation)
-
Pegden, C. D., 1989, Introduction to SIMAN (Sewickley, PA: Systems Modeling Corporation).
-
(1989)
Introduction to SIMAN
-
-
Pegden, C.D.1
-
16
-
-
84985747359
-
An evaluation of sequencing rules for an assembly shop
-
Russell, R. S. and Taylor, B. W., III, 1985, An evaluation of sequencing rules for an assembly shop. Decision Sciences, 16, 196-212.
-
(1985)
Decision Sciences
, vol.16
, pp. 196-212
-
-
Russell, R.S.1
Taylor, B.W.2
-
18
-
-
0024731874
-
A review of the dual resource constrained system research
-
Treleven, M. D., 1989, A review of the dual resource constrained system research. IIE Transactions, 21, 279-287.
-
(1989)
IIE Transactions
, vol.21
, pp. 279-287
-
-
Treleven, M.D.1
|