메뉴 건너뛰기




Volumn 27, Issue , 2012, Pages 40-49

GIS-based dynamic construction site material layout evaluation for building renovation projects

Author keywords

Building renovation; GIS; Materials management; Site layout planning

Indexed keywords

BUILDING RENOVATION; CONSTRUCTION PLANNING; COST OVERRUNS; DYNAMIC CONSTRUCTION; EVALUATION MODELS; MATERIAL LAYOUT; MATERIALS MANAGEMENT; MITIGATION MEASURES; PROJECT DELAYS; PROJECT DURATION; SITE LAYOUT PLANNING; SPACE AND TIME; SPATIAL TEMPORALS;

EID: 84863694377     PISSN: 09265805     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.autcon.2012.04.007     Document Type: Article
Times cited : (54)

References (31)
  • 3
    • 84863678919 scopus 로고    scopus 로고
    • Materials management: The key to successful project management
    • D.U. Kini Materials management: the key to successful project management Journal of Management in Engineering 13 1999 198 206
    • (1999) Journal of Management in Engineering , vol.13 , pp. 198-206
    • Kini, D.U.1
  • 4
    • 0037647504 scopus 로고    scopus 로고
    • GA-ANN model for optimizing the locations of tower crane and supply points for high-rise public housing construction
    • C.M. Tam, and T.K.L. Tong GA-ANN model for optimizing the locations of tower crane and supply points for high-rise public housing construction Construction Management and Economics 21 2003 257 266
    • (2003) Construction Management and Economics , vol.21 , pp. 257-266
    • Tam, C.M.1    Tong, T.K.L.2
  • 11
    • 2342430993 scopus 로고    scopus 로고
    • Identification and resolution of workspace conflicts in building construction
    • S. Guo Identification and resolution of workspace conflicts in building construction Journal of Construction Engineering and Management 128 2002 287 295
    • (2002) Journal of Construction Engineering and Management , vol.128 , pp. 287-295
    • Guo, S.1
  • 12
    • 0031362303 scopus 로고    scopus 로고
    • Space planning for mechanical, electrical, plumbing and fire protection trades in multi-story building construction
    • ASCE Reston, Va
    • D. Riley, and V. Sanvido Space planning for mechanical, electrical, plumbing and fire protection trades in multi-story building construction 5th ASCE Construction Congress 1997 ASCE Reston, Va 102 109
    • (1997) 5th ASCE Construction Congress , pp. 102-109
    • Riley, D.1    Sanvido, V.2
  • 19
    • 0029344681 scopus 로고
    • Construction-site layout using annealed neural network
    • I.C. Yeh Construction-site layout using annealed neural network Journal of Computing in Civil Engineering 9 1995 201 208
    • (1995) Journal of Computing in Civil Engineering , vol.9 , pp. 201-208
    • Yeh, I.C.1
  • 24
    • 2342444431 scopus 로고    scopus 로고
    • Genetic algorithm for solving site layout problem with unequal-size and constrained facilities
    • P.P. Zouein, H. Harmanani, and A. Hajar Genetic algorithm for solving site layout problem with unequal-size and constrained facilities Journal of Computing in Civil Engineering 16 2002 143 151
    • (2002) Journal of Computing in Civil Engineering , vol.16 , pp. 143-151
    • Zouein, P.P.1    Harmanani, H.2    Hajar, A.3
  • 25
    • 33847198334 scopus 로고    scopus 로고
    • Optimization of floor-level construction material layout using genetic algorithms
    • H. Jang, S. Lee, and S. Choi Optimization of floor-level construction material layout using genetic algorithms Automation in Construction 16 2007 531 545
    • (2007) Automation in Construction , vol.16 , pp. 531-545
    • Jang, H.1    Lee, S.2    Choi, S.3
  • 30
    • 84863645392 scopus 로고    scopus 로고
    • Arcgis Desktop Help obtained Dec 16th
    • ArcGIS Desktop Help How path distance tools work http://help.arcgis.com/ en/arcgisdesktop/10.0/help/index.html#/How-the-path-distance-tools-work/ 009z00000027000000/ 2011 obtained Dec 16th
    • (2011) How Path Distance Tools Work


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.