-
3
-
-
84863678919
-
Materials management: The key to successful project management
-
D.U. Kini Materials management: the key to successful project management Journal of Management in Engineering 13 1999 198 206
-
(1999)
Journal of Management in Engineering
, vol.13
, pp. 198-206
-
-
Kini, D.U.1
-
4
-
-
0037647504
-
GA-ANN model for optimizing the locations of tower crane and supply points for high-rise public housing construction
-
C.M. Tam, and T.K.L. Tong GA-ANN model for optimizing the locations of tower crane and supply points for high-rise public housing construction Construction Management and Economics 21 2003 257 266
-
(2003)
Construction Management and Economics
, vol.21
, pp. 257-266
-
-
Tam, C.M.1
Tong, T.K.L.2
-
11
-
-
2342430993
-
Identification and resolution of workspace conflicts in building construction
-
S. Guo Identification and resolution of workspace conflicts in building construction Journal of Construction Engineering and Management 128 2002 287 295
-
(2002)
Journal of Construction Engineering and Management
, vol.128
, pp. 287-295
-
-
Guo, S.1
-
12
-
-
0031362303
-
Space planning for mechanical, electrical, plumbing and fire protection trades in multi-story building construction
-
ASCE Reston, Va
-
D. Riley, and V. Sanvido Space planning for mechanical, electrical, plumbing and fire protection trades in multi-story building construction 5th ASCE Construction Congress 1997 ASCE Reston, Va 102 109
-
(1997)
5th ASCE Construction Congress
, pp. 102-109
-
-
Riley, D.1
Sanvido, V.2
-
18
-
-
0029714192
-
Adaptation of a layout design system to a new domain: Construction site layouts
-
B. Choi, and U. Flemming Adaptation of a layout design system to a new domain: construction site layouts Proc. of 3rd Congress Computing in Civil Engineering, ASCE, A/E/C Systems, Anaheim, Calif 1996 718 725
-
(1996)
Proc. of 3rd Congress Computing in Civil Engineering, ASCE, A/E/C Systems, Anaheim, Calif
, pp. 718-725
-
-
Choi, B.1
Flemming, U.2
-
19
-
-
0029344681
-
Construction-site layout using annealed neural network
-
I.C. Yeh Construction-site layout using annealed neural network Journal of Computing in Civil Engineering 9 1995 201 208
-
(1995)
Journal of Computing in Civil Engineering
, vol.9
, pp. 201-208
-
-
Yeh, I.C.1
-
23
-
-
0034588313
-
An evolutionary algorithm for solving the geometrically constrained site layout problem
-
ASCE Reston, Va
-
H. Harmanani, P. Zouein, and A. Hajar An evolutionary algorithm for solving the geometrically constrained site layout problem Proc., of the 8th Int. Conf. on Computing in Civil Engineering 2000 ASCE Reston, Va 1442 1449
-
(2000)
Proc., of the 8th Int. Conf. on Computing in Civil Engineering
, pp. 1442-1449
-
-
Harmanani, H.1
Zouein, P.2
Hajar, A.3
-
24
-
-
2342444431
-
Genetic algorithm for solving site layout problem with unequal-size and constrained facilities
-
P.P. Zouein, H. Harmanani, and A. Hajar Genetic algorithm for solving site layout problem with unequal-size and constrained facilities Journal of Computing in Civil Engineering 16 2002 143 151
-
(2002)
Journal of Computing in Civil Engineering
, vol.16
, pp. 143-151
-
-
Zouein, P.P.1
Harmanani, H.2
Hajar, A.3
-
25
-
-
33847198334
-
Optimization of floor-level construction material layout using genetic algorithms
-
H. Jang, S. Lee, and S. Choi Optimization of floor-level construction material layout using genetic algorithms Automation in Construction 16 2007 531 545
-
(2007)
Automation in Construction
, vol.16
, pp. 531-545
-
-
Jang, H.1
Lee, S.2
Choi, S.3
-
30
-
-
84863645392
-
-
Arcgis Desktop Help obtained Dec 16th
-
ArcGIS Desktop Help How path distance tools work http://help.arcgis.com/ en/arcgisdesktop/10.0/help/index.html#/How-the-path-distance-tools-work/ 009z00000027000000/ 2011 obtained Dec 16th
-
(2011)
How Path Distance Tools Work
-
-
|