메뉴 건너뛰기




Volumn 30, Issue 2, 2012, Pages 151-164

Transaction-related issues and construction project performance

Author keywords

construction projects; Project performance; transaction cost economics

Indexed keywords

CHANGE ORDER; CONSTRUCTION PROJECTS; CONTRACTOR'S ROLE; FEASIBILITY STUDIES; MARKET RESEARCHES; PROJECT PERFORMANCE; QUALITY STANDARD; STRUCTURAL EQUATION MODELS; TRANSACTION COST; TRANSACTION COST ECONOMICS;

EID: 84863235285     PISSN: 01446193     EISSN: 1466433X     Source Type: Journal    
DOI: 10.1080/01446193.2012.655254     Document Type: Article
Times cited : (41)

References (95)
  • 3
    • 84921275857 scopus 로고    scopus 로고
    • Assessment of facilities management performance-what next?
    • Amaratunga, D., Baldry, D. and Sarshar, M. 2000. Assessment of facilities management performance-what next?. Facilities Journal, 18(1/2): 66-76.
    • (2000) Facilities Journal , vol.18 , Issue.1-2 , pp. 66-76
    • Amaratunga, D.1    Baldry, D.2    Sarshar, M.3
  • 4
    • 0000433351 scopus 로고
    • On the assessment of unidimensional measurement: Internal and external consistency, and overall consistency criteria
    • Anderson, J.C., Gerbing, D.W. and Hunter, J.E. 1987. On the assessment of unidimensional measurement: internal and external consistency, and overall consistency criteria. Journal of Marketing Research, 24(4): 432-7.
    • (1987) Journal of Marketing Research , vol.24 , Issue.4 , pp. 432-437
    • Anderson, J.C.1    Gerbing, D.W.2    Hunter, J.E.3
  • 7
    • 0032595622 scopus 로고    scopus 로고
    • Project management: Cost, time and quality, two best guesses and a phenomenon, it's time to accept other success criteria
    • Atkinson, R. 1999. Project management: cost, time and quality, two best guesses and a phenomenon, it's time to accept other success criteria. International Journal of Project Management, 17(6): 337-42.
    • (1999) International Journal of Project Management , vol.17 , Issue.6 , pp. 337-342
    • Atkinson, R.1
  • 8
    • 0035602818 scopus 로고    scopus 로고
    • Incentives versus transaction costs: A theory of procurement contracts
    • Bajari, P. and Tadelis, S. 2001. Incentives versus transaction costs: a theory of procurement contracts. RAND Journal of Economics, 32(3): 387-407.
    • (2001) RAND Journal of Economics , vol.32 , Issue.3 , pp. 387-407
    • Bajari, P.1    Tadelis, S.2
  • 10
    • 0030173778 scopus 로고    scopus 로고
    • A new framework for determining critical success/failure factors in projects
    • Belassi, W. and Tukel, O.I. 1996. A new framework for determining critical success/failure factors in projects. International Journal of Project Management, 14(3): 141-51.
    • (1996) International Journal of Project Management , vol.14 , Issue.3 , pp. 141-151
    • Belassi, W.1    Tukel, O.I.2
  • 12
    • 0008324711 scopus 로고    scopus 로고
    • The Dutch construction industry: A combination of competition and corporatism
    • Bremer, W. and Kok, K. 2000. The Dutch construction industry: a combination of competition and corporatism. Building Research & Information, 28(2): 98-108.
    • (2000) Building Research & Information , vol.28 , Issue.2 , pp. 98-108
    • Bremer, W.1    Kok, K.2
  • 13
    • 0033792524 scopus 로고    scopus 로고
    • Building partnerships: Case studies of client-contractor collaboration in the UK construction industry
    • Bresnen, M. and Marshall, N. 2000. Building partnerships: case studies of client-contractor collaboration in the UK construction industry. Construction Management and Economics, 18(7): 819-32.
    • (2000) Construction Management and Economics , vol.18 , Issue.7 , pp. 819-832
    • Bresnen, M.1    Marshall, N.2
  • 14
  • 15
    • 0036132448 scopus 로고    scopus 로고
    • How practitioners share fractions in target cost contracts
    • Broome, J. and Perry, J. 2002. How practitioners share fractions in target cost contracts. International Journal of Project Management, 20(1): 59-66.
    • (2002) International Journal of Project Management , vol.20 , Issue.1 , pp. 59-66
    • Broome, J.1    Perry, J.2
  • 16
    • 0001233581 scopus 로고
    • Alternative ways of assessing model fit
    • In: Bollen K.A., Long J.S., editors Beverly Hills, CA: Sage
    • Browne, M.W. and Cudeck, R. 1993. "Alternative ways of assessing model fit". In Testing Structural Equation Models, Edited by: Bollen, K.A. and Long, J.S. 136-62. Beverly Hills, CA: Sage.
    • (1993) Testing Structural Equation Models , pp. 136-162
    • Browne, M.W.1    Cudeck, R.2
  • 20
    • 0031078243 scopus 로고    scopus 로고
    • A comparative study of the causes of time and cost overruns in Hong Kong construction projects
    • Chan, D.W.M. and Kumaraswamy, M.M. 1997. A comparative study of the causes of time and cost overruns in Hong Kong construction projects. International Journal of Project Management, 15(1): 55-63.
    • (1997) International Journal of Project Management , vol.15 , Issue.1 , pp. 55-63
    • Chan, D.W.M.1    Kumaraswamy, M.M.2
  • 21
    • 34547992411 scopus 로고    scopus 로고
    • Reversal of bargaining power in construction projects: Meaning, existence and implications
    • Chang, C.Y. and Ive, G. 2007. Reversal of bargaining power in construction projects: meaning, existence and implications. Construction Management and Economics, 25(8): 845-55.
    • (2007) Construction Management and Economics , vol.25 , Issue.8 , pp. 845-855
    • Chang, C.Y.1    Ive, G.2
  • 23
    • 0035399555 scopus 로고    scopus 로고
    • Subcontracting in commercial and residential construction: An empirical investigation
    • Constantino, N., Pietroforte, R. and Hamill, P. 2001. Subcontracting in commercial and residential construction: an empirical investigation. Construction Management and Economics, 19(4): 439-47.
    • (2001) Construction Management and Economics , vol.19 , Issue.4 , pp. 439-447
    • Constantino, N.1    Pietroforte, R.2    Hamill, P.3
  • 31
    • 78650810970 scopus 로고    scopus 로고
    • Effects of cooperative procurement procedures on construction project performance. A conceptual framework international
    • Eriksson, P.E. and Westerberg, M. 2011. Effects of cooperative procurement procedures on construction project performance. A conceptual framework international. Journal of Project Management, 29(2): 197-208.
    • (2011) Journal of Project Management , vol.29 , Issue.2 , pp. 197-208
    • Eriksson, P.E.1    Westerberg, M.2
  • 32
    • 46049106438 scopus 로고
    • Performance measured is performance gained
    • February
    • Evangelidizs, K. 1992. Performance measured is performance gained. The Treasurer: 45-47. February
    • (1992) The Treasurer , pp. 45-47
    • Evangelidizs, K.1
  • 34
    • 33847632845 scopus 로고    scopus 로고
    • A conceptual framework for studying customer satisfaction in residential construction
    • Forsythe, P. 2007. A conceptual framework for studying customer satisfaction in residential construction. Construction Management and Economics, 25(2): 171-82.
    • (2007) Construction Management and Economics , vol.25 , Issue.2 , pp. 171-182
    • Forsythe, P.1
  • 37
    • 0002896815 scopus 로고    scopus 로고
    • Is a building construction project a hierarchy or a market?
    • Gunnarson, S. and Levitt, R.E. Is a building construction project a hierarchy or a market?. Paper presented at the Seventh World Congress of Project Management. September12-17, Copenhagen, Denmark.
    • Gunnarson, S.1    Levitt, R.E.2
  • 38
    • 0024126221 scopus 로고
    • Knowledge base development for international construction operations
    • Hadipriono, F.C. and Chang, K.S. 1988. Knowledge base development for international construction operations. Civil Engineering Systems, 5(4): 220-6.
    • (1988) Civil Engineering Systems , vol.5 , Issue.4 , pp. 220-226
    • Hadipriono, F.C.1    Chang, K.S.2
  • 40
    • 84884244066 scopus 로고    scopus 로고
    • The transaction costs of Public-Private Partnerships: Implications on PPP governance design
    • Ho, P. and Tsui, C.W. The transaction costs of Public-Private Partnerships: implications on PPP governance design. Paper presented at the Lead 2009 Specialty Conference: Global Governance in Project Organizations. November5-7, South Lake Tahoe, CA.
    • Ho, P.1    Tsui, C.W.2
  • 41
    • 0032262444 scopus 로고    scopus 로고
    • Fit indices in covariance structure modeling: Sensitivity to under-parameterized model misspecification
    • Hu, L. and Bentler, P.M. 1998. Fit indices in covariance structure modeling: sensitivity to under-parameterized model misspecification. Psychological Methods, 3(4): 424-53.
    • (1998) Psychological Methods , vol.3 , Issue.4 , pp. 424-453
    • Hu, L.1    Bentler, P.M.2
  • 43
    • 0000238145 scopus 로고    scopus 로고
    • Sample size and number of parameter estimates in maximum likelihood confirmatory factor analysis: A Monte Carlo investigation
    • Jackson, D.L. 2003. Sample size and number of parameter estimates in maximum likelihood confirmatory factor analysis: a Monte Carlo investigation. Structural Equation Modeling: A Multidisciplinary Journal, 8(2): 205-23.
    • (2003) Structural Equation Modeling: A Multidisciplinary Journal , vol.8 , Issue.2 , pp. 205-223
    • Jackson, D.L.1
  • 45
    • 51649120361 scopus 로고    scopus 로고
    • A transaction cost-based approach to partnership performance evaluation
    • Jobin, D. 2008. A transaction cost-based approach to partnership performance evaluation. Evaluation, 14: 437-56.
    • (2008) Evaluation , vol.14 , pp. 437-456
    • Jobin, D.1
  • 46
    • 0035452559 scopus 로고    scopus 로고
    • General contractors' relationships with subcontractors: A strategic asset
    • Kale, S. and Arditi, D. 2001. General contractors' relationships with subcontractors: a strategic asset. Construction Management and Economics, 19(5): 541-9.
    • (2001) Construction Management and Economics , vol.19 , Issue.5 , pp. 541-549
    • Kale, S.1    Arditi, D.2
  • 47
    • 0039997969 scopus 로고    scopus 로고
    • Factors influencing construction time and cost overruns on high-rise projects in Indonesia
    • Kaming, P.F., Olomolaiye, P.O., Holt, G.D. and Harris, F.C. 1997. Factors influencing construction time and cost overruns on high-rise projects in Indonesia. Construction Management and Economics, 15(1): 83-94.
    • (1997) Construction Management and Economics , vol.15 , Issue.1 , pp. 83-94
    • Kaming, P.F.1    Olomolaiye, P.O.2    Holt, G.D.3    Harris, F.C.4
  • 49
    • 0030295415 scopus 로고    scopus 로고
    • The low-trust route to economic development: Inter-firm relations in the UK engineering construction industry in the 1980s and 1990s
    • Korczynski, M. 1996. The low-trust route to economic development: inter-firm relations in the UK engineering construction industry in the 1980s and 1990s. Journal of Management Studies, 33(6): 787-808.
    • (1996) Journal of Management Studies , vol.33 , Issue.6 , pp. 787-808
    • Korczynski, M.1
  • 53
    • 0001343934 scopus 로고    scopus 로고
    • The Coasian market-firm dichotomy and subcontracting in the construction industry
    • Lai, L.W.C. 2000. The Coasian market-firm dichotomy and subcontracting in the construction industry. Construction Management and Economics, 18(3): 355-62.
    • (2000) Construction Management and Economics , vol.18 , Issue.3 , pp. 355-362
    • Lai, L.W.C.1
  • 54
    • 84930124556 scopus 로고
    • Project partnering: Results of study of 280 construction projects
    • Larson, E. 1995. Project partnering: results of study of 280 construction projects. Journal of Management in Engineering, 11(2): 30-5.
    • (1995) Journal of Management in Engineering , vol.11 , Issue.2 , pp. 30-35
    • Larson, E.1
  • 56
  • 58
    • 0024637525 scopus 로고
    • You can manage construction risks
    • Macomber, J.D. 1989. You can manage construction risks. Harvard Business Review, 67(2): 155-65.
    • (1989) Harvard Business Review , vol.67 , Issue.2 , pp. 155-165
    • Macomber, J.D.1
  • 59
    • 70350042129 scopus 로고    scopus 로고
    • The impact of an unbalanced bid on the change order process
    • Manzo, F.A. 1997. The impact of an unbalanced bid on the change order process. Construction for News, 7(1): 1-8.
    • (1997) Construction for News , vol.7 , Issue.1 , pp. 1-8
    • Manzo, F.A.1
  • 60
    • 3142717451 scopus 로고
    • Goodness-of-fit indexes in confirmatory factor analysis: The effect of sample size
    • Marsh, H.W., Balla, J.R. and McDonald, R.P. 1988. Goodness-of-fit indexes in confirmatory factor analysis: the effect of sample size. Psychological Bulletin, 103(3): 391-410.
    • (1988) Psychological Bulletin , vol.103 , Issue.3 , pp. 391-410
    • Marsh, H.W.1    Balla, J.R.2    McDonald, R.P.3
  • 61
    • 8644251543 scopus 로고    scopus 로고
    • Harmonization between main contractors and subcontractors: A prerequisite for lean construction?
    • Miller, C.J.M., Packham, G.A. and Thomas, B.C. 2002. Harmonization between main contractors and subcontractors: a prerequisite for lean construction?. Journal of Construction Research, 3(1): 67-82.
    • (2002) Journal of Construction Research , vol.3 , Issue.1 , pp. 67-82
    • Miller, C.J.M.1    Packham, G.A.2    Thomas, B.C.3
  • 65
    • 21444459526 scopus 로고    scopus 로고
    • The impact of principal-agent relationship and contract type on communication between project owner and manager
    • Müller, R. and Turner, J.R. 2005. The impact of principal-agent relationship and contract type on communication between project owner and manager. International Journal of Project Management, 23(5): 398-403.
    • (2005) International Journal of Project Management , vol.23 , Issue.5 , pp. 398-403
    • Müller, R.1    Turner, J.R.2
  • 68
    • 0012786625 scopus 로고
    • Can project management can be defined?
    • Oilsen, P.R. 1971. Can project management can be defined?. Project Management Quarterly, 2(1): 12-14.
    • (1971) Project Management Quarterly , vol.2 , Issue.1 , pp. 12-14
    • Oilsen, P.R.1
  • 71
    • 0001849920 scopus 로고    scopus 로고
    • Communication and governance in the building process
    • Piertoforte, R. 1997. Communication and governance in the building process. Construction Management and Economics, 15(1): 71-82.
    • (1997) Construction Management and Economics , vol.15 , Issue.1 , pp. 71-82
    • Piertoforte, R.1
  • 78
    • 33847308577 scopus 로고    scopus 로고
    • Mutual objective setting for partnering projects in the public sector
    • Swan, W. and Khalfan, M. 2007. Mutual objective setting for partnering projects in the public sector. Engineering, Construction and Architectural Management, 14(2): 119-30.
    • (2007) Engineering, Construction and Architectural Management , vol.14 , Issue.2 , pp. 119-130
    • Swan, W.1    Khalfan, M.2
  • 79
    • 15344351111 scopus 로고    scopus 로고
    • Online buying behavior: A transaction cost economics perspective
    • Teo, T.S.H. and Yu, Y. 2005. Online buying behavior: a transaction cost economics perspective. Omega, 33(5): 451-65.
    • (2005) Omega , vol.33 , Issue.5 , pp. 451-465
    • Teo, T.S.H.1    Yu, Y.2
  • 80
    • 0003258063 scopus 로고
    • The partial least squares approach to causal modeling: Personal computer adoption and use as an illustration
    • Thompson, R.L., Barclay, D.W. and Higgins, C. 1995. The partial least squares approach to causal modeling: personal computer adoption and use as an illustration. Technology Studies: Special Issue on Research Methodology, 2(2): 285-324.
    • (1995) Technology Studies: Special Issue on Research Methodology , vol.2 , Issue.2 , pp. 285-324
    • Thompson, R.L.1    Barclay, D.W.2    Higgins, C.3
  • 81
    • 84863288138 scopus 로고    scopus 로고
    • Top Owners List Top owners list. Engineering News-Record, available at (accessed 1 March 2011)
    • Top Owners List (2010) Top owners list. Engineering News-Record, available at http://enr.construction.com/toplists/sourcebooks2010/Owners/topOwners/001-100.asp (accessed 1 March 2011).
    • (2010)
  • 83
    • 0001035369 scopus 로고    scopus 로고
    • Mechanisms of governance in the project-based organization: Roles of the broker and steward
    • Turner, J.R. and Keegan, A.E. 2001. Mechanisms of governance in the project-based organization: roles of the broker and steward. European Management Journal, 19(3): 254-67.
    • (2001) European Management Journal , vol.19 , Issue.3 , pp. 254-267
    • Turner, J.R.1    Keegan, A.E.2
  • 86
    • 0005478341 scopus 로고
    • The influence of client and project team relationships upon construction time performance
    • Walker, D.H.T. 1995. The influence of client and project team relationships upon construction time performance. Journal of Construction Procurement, 1(1): 4-20.
    • (1995) Journal of Construction Procurement , vol.1 , Issue.1 , pp. 4-20
    • Walker, D.H.T.1
  • 87
    • 84993047714 scopus 로고    scopus 로고
    • Australian multi-unit residential project construction time performance factors
    • Walker, D.H.T. and Vines, M.W. 2000. Australian multi-unit residential project construction time performance factors. Engineering, Construction and Architectural Management, 7(3): 278-84.
    • (2000) Engineering, Construction and Architectural Management , vol.7 , Issue.3 , pp. 278-284
    • Walker, D.H.T.1    Vines, M.W.2
  • 88
    • 84860445156 scopus 로고    scopus 로고
    • Paper presented at RICS Annual Construction, Building and Real Estate Research Conference (COBRA), Cape Town, South Africa, 10-11 September
    • Walker, F. and Pryke, S. (2009) Role definition and dimensions of incomplete construction contract documents. Paper presented at RICS Annual Construction, Building and Real Estate Research Conference (COBRA), Cape Town, South Africa, 10-11 September, pp. 1258-75.
    • (2009) Role definition and dimensions of incomplete construction contract documents , pp. 75-1258
    • Walker, F.1    Pryke, S.2
  • 92
    • 84948890856 scopus 로고
    • The construction firm and the construction project: A transaction cost approach
    • Winch, G. 1989. The construction firm and the construction project: a transaction cost approach. Construction Management and Economics, 7(4): 331-45.
    • (1989) Construction Management and Economics , vol.7 , Issue.4 , pp. 331-345
    • Winch, G.1
  • 93
    • 0035576569 scopus 로고    scopus 로고
    • Governing the project process: A conceptual framework
    • Winch, G.M. 2001. Governing the project process: a conceptual framework. Construction Management and Economics, 19(8): 799-808.
    • (2001) Construction Management and Economics , vol.19 , Issue.8 , pp. 799-808
    • Winch, G.M.1
  • 95
    • 40949088975 scopus 로고    scopus 로고
    • Effects of e-service quality on loyalty intention: An empirical study in online auction
    • Yen, C.H. and Lu, H.P. 2008. Effects of e-service quality on loyalty intention: An empirical study in online auction. Managing Service Quality, 18(2): 127-46.
    • (2008) Managing Service Quality , vol.18 , Issue.2 , pp. 127-146
    • Yen, C.H.1    Lu, H.P.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.