메뉴 건너뛰기




Volumn 18, Issue 3, 2002, Pages 120-128

Framework of success criteria for design/build projects

Author keywords

Construction industry; Design build; Project management

Indexed keywords

CONSTRUCTION INDUSTRY; EDUCATION; ENGINEERS; LARGE SCALE SYSTEMS; PERFORMANCE; STRUCTURAL DESIGN;

EID: 0242434228     PISSN: 0742597X     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0742-597X(2002)18:3(120)     Document Type: Article
Times cited : (299)

References (48)
  • 1
    • 84861143214 scopus 로고
    • Design and build: A survey of construction contractors' views
    • Akintoye, A. (1994). "Design and build: A survey of construction contractors' views." Constr. Manage. Econom., 12(2), 155-163.
    • (1994) Constr. Manage. Econom. , vol.12 , Issue.2 , pp. 155-163
    • Akintoye, A.1
  • 2
    • 0012235718 scopus 로고
    • Design and build: A survey of architects' views
    • Akintoye, A., and Fitzgerald, E. (1995). "Design and build: A survey of architects' views." Eng., Constr. Archil. Manage., 2(1), 27-44.
    • (1995) Eng., Constr. Archil. Manage. , vol.2 , Issue.1 , pp. 27-44
    • Akintoye, A.1    Fitzgerald, E.2
  • 3
    • 0028548066 scopus 로고
    • Team-building process: Key to better project results
    • Albanese, R. (1994). "Team-building process: Key to better project results." J. Manage. Eng., 10(6), 36-44.
    • (1994) J. Manage. Eng. , vol.10 , Issue.6 , pp. 36-44
    • Albanese, R.1
  • 4
    • 14744304795 scopus 로고    scopus 로고
    • Conflict management and construction project effectiveness: A review of the literature and development of a theoretical framework
    • Al-Meshekeh, H. S., and Langford, D. A. (1999). "Conflict management and construction project effectiveness: A review of the literature and development of a theoretical framework." J. Constr. Procure., 5(1), 58-75.
    • (1999) J. Constr. Procure. , vol.5 , Issue.1 , pp. 58-75
    • Al-Meshekeh, H.S.1    Langford, D.A.2
  • 5
    • 0032595622 scopus 로고    scopus 로고
    • Project management: Cost, time, and quality, two best guesses and a phenomenon, it's time to accept other success criteria
    • Atkinson, R. (1999). "Project management: Cost, time, and quality, two best guesses and a phenomenon, it's time to accept other success criteria." Int. J. Proj. Manage., 17(6), 337-342.
    • (1999) Int. J. Proj. Manage. , vol.17 , Issue.6 , pp. 337-342
    • Atkinson, R.1
  • 6
    • 0033729893 scopus 로고    scopus 로고
    • Measuring the effect of project management on construction outputs: A new approach
    • Brown, A., and Adams, J. (2000). "Measuring the effect of project management on construction outputs: a new approach." Int. J. Proj. Manage., 18(5), 327-335.
    • (2000) Int. J. Proj. Manage. , vol.18 , Issue.5 , pp. 327-335
    • Brown, A.1    Adams, J.2
  • 7
    • 0008764836 scopus 로고
    • Evaluating the general conditions of a construction contract
    • Bubshait, A. A., and Almohawis, S. A. (1994). "Evaluating the general conditions of a construction contract." Int. J. Proj. Manage., 12(3), 133-135.
    • (1994) Int. J. Proj. Manage. , vol.12 , Issue.3 , pp. 133-135
    • Bubshait, A.A.1    Almohawis, S.A.2
  • 9
    • 0003320485 scopus 로고    scopus 로고
    • Evaluation of enhanced design and build system-A case study of a hospital project
    • Chan, A. P. C. (2000). "Evaluation of enhanced design and build system-A case study of a hospital project." Constr. Manage. Econom., 18(8), 863-871.
    • (2000) Constr. Manage. Econom. , vol.18 , Issue.8 , pp. 863-871
    • Chan, A.P.C.1
  • 11
    • 0002142201 scopus 로고    scopus 로고
    • Development of consultant performance measures for design projects
    • Chang, A. S., and Ibbs, C. W. (1998). "Development of consultant performance measures for design projects." Proj. Manage. J., 29(2), 39-54.
    • (1998) Proj. Manage. J. , vol.29 , Issue.2 , pp. 39-54
    • Chang, A.S.1    Ibbs, C.W.2
  • 12
    • 0001055467 scopus 로고    scopus 로고
    • The ranking of construction management journals
    • Chau, K. W. (1997). "The ranking of construction management journals." Constr. Manage. Econom., 15(4), 387-398.
    • (1997) Constr. Manage. Econom. , vol.15 , Issue.4 , pp. 387-398
    • Chau, K.W.1
  • 13
    • 3342903047 scopus 로고    scopus 로고
    • Factors affecting client's project dispute resolution satisfaction in Hong Kong
    • Cheung, S. O., Tam, C. M., Ndekugri, I., and Harris, F. C. (2000). "Factors affecting client's project dispute resolution satisfaction in Hong Kong." Constr. Manage. Econom., 18(3), 281-294.
    • (2000) Constr. Manage. Econom. , vol.18 , Issue.3 , pp. 281-294
    • Cheung, S.O.1    Tam, C.M.2    Ndekugri, I.3    Harris, F.C.4
  • 14
    • 0032688614 scopus 로고    scopus 로고
    • Critical success factors for different project objectives
    • Chua, D. K. H., Kog, Y. C., and Loh, P. K. (1999). "Critical success factors for different project objectives." J. Constr. Eng. Manage., 125(3), 142-150.
    • (1999) J. Constr. Eng. Manage. , vol.125 , Issue.3 , pp. 142-150
    • Chua, D.K.H.1    Kog, Y.C.2    Loh, P.K.3
  • 16
    • 0002978067 scopus 로고
    • Measuring project success
    • Freeman, M., and Beale, P. (1992). "Measuring project success." Proj. Manage. J., 23(1), 8-17.
    • (1992) Proj. Manage. J. , vol.23 , Issue.1 , pp. 8-17
    • Freeman, M.1    Beale, P.2
  • 17
    • 0002576968 scopus 로고    scopus 로고
    • Criteria for contractor selection
    • Hatush, Z., and Skitmore, M. (1997). "Criteria for contractor selection." Constr. Manage. Econom., 15(1), 19-38.
    • (1997) Constr. Manage. Econom. , vol.15 , Issue.1 , pp. 19-38
    • Hatush, Z.1    Skitmore, M.2
  • 18
    • 0026172617 scopus 로고
    • Optimal allocation of project management resources for achieving success
    • Jaselskis, E. J. (1991). "Optimal allocation of project management resources for achieving success." J. Constr. Eng. Manage., 117(2), 321-340.
    • (1991) J. Constr. Eng. Manage. , vol.117 , Issue.2 , pp. 321-340
    • Jaselskis, E.J.1
  • 19
    • 0029734237 scopus 로고    scopus 로고
    • Systematizing construction project evaluations
    • Kumaraswamy, M. M., and Thorpe, A. (1996). "Systematizing construction project evaluations." J. Manage. Eng., 12(1), 34-39.
    • (1996) J. Manage. Eng. , vol.12 , Issue.1 , pp. 34-39
    • Kumaraswamy, M.M.1    Thorpe, A.2
  • 20
    • 14744304283 scopus 로고    scopus 로고
    • The strategic role of design and build in the procurement process
    • Hong Kong
    • Kwong, H. S. (1996). "The strategic role of design and build in the procurement process." Keynote Address, Design and Build Symposium, 30, Hong Kong, 1-4.
    • (1996) Keynote Address, Design and Build Symposium , vol.30 , pp. 1-4
    • Kwong, H.S.1
  • 21
    • 14744282625 scopus 로고    scopus 로고
    • Occupational Safety and Health Branch, Labour Department, The Government of the Hong Kong Special Administrative Region
    • Labour Department. (2000). "Accident statistics bulletin." Issue No. 3, Oct., Occupational Safety and Health Branch, Labour Department, The Government of the Hong Kong Special Administrative Region.
    • (2000) Accident Statistics Bulletin , Issue.3 OCT.
  • 22
    • 0242602441 scopus 로고    scopus 로고
    • Achieving best value in construction procurement: An architect's perspective
    • Lam, W. H. (2000). "Achieving best value in construction procurement: An architect's perspective." Hong Kong Inst. Archit. J., 26(4), 34-38.
    • (2000) Hong Kong Inst. Archit. J. , vol.26 , Issue.4 , pp. 34-38
    • Lam, W.H.1
  • 23
    • 84930124556 scopus 로고
    • Project partnering: Results of study of 280 construction projects
    • Larson, E. (1995). "Project partnering: Results of study of 280 construction projects." J. Manage. Eng., 11(2), 30-35.
    • (1995) J. Manage. Eng. , vol.11 , Issue.2 , pp. 30-35
    • Larson, E.1
  • 24
    • 0028393005 scopus 로고
    • Quality performance on successful project
    • Ledbetter, W. B. (1994). "Quality performance on successful project." J. Constr. Eng. Manage., 120(1), 34-46.
    • (1994) J. Constr. Eng. Manage. , vol.120 , Issue.1 , pp. 34-46
    • Ledbetter, W.B.1
  • 25
    • 0033177685 scopus 로고    scopus 로고
    • Criteria of project success: An exploratory re-examination
    • Lim, C. S., and Mohamed, M. Z. (1999). "Criteria of project success: An exploratory re-examination." Int. J. Proj. Manage., 17(4), 243-248.
    • (1999) Int. J. Proj. Manage. , vol.17 , Issue.4 , pp. 243-248
    • Lim, C.S.1    Mohamed, M.Z.2
  • 26
    • 0000855204 scopus 로고    scopus 로고
    • Evaluation of project outcomes
    • Liu, A. M. M., and Walker, A. (1998). "Evaluation of project outcomes." Constr. Manage. Econom., 16(2), 209-219.
    • (1998) Constr. Manage. Econom. , vol.16 , Issue.2 , pp. 209-219
    • Liu, A.M.M.1    Walker, A.2
  • 27
    • 0025488623 scopus 로고
    • Framework for analysis of performance
    • Maloney, W. F. (1990). "Framework for analysis of performance." J. Constr. Eng. Manage., 116(3), 399-415.
    • (1990) J. Constr. Eng. Manage. , vol.116 , Issue.3 , pp. 399-415
    • Maloney, W.F.1
  • 28
    • 0032208060 scopus 로고    scopus 로고
    • Model for public sector design-build project selection
    • Molenaar, K. R., and Songer, A. D. (1998). "Model for public sector design-build project selection." J. Constr. Eng. Manage., 124(6), 467-479.
    • (1998) J. Constr. Eng. Manage. , vol.124 , Issue.6 , pp. 467-479
    • Molenaar, K.R.1    Songer, A.D.2
  • 29
    • 0033101744 scopus 로고    scopus 로고
    • Public-sector design/build evolution and performance
    • Molenaar, K. R., Songer, A. D., and Barash, M. (1999). "Public-sector design/build evolution and performance." J. Manage. Eng., 15(2), 54-62.
    • (1999) J. Manage. Eng. , vol.15 , Issue.2 , pp. 54-62
    • Molenaar, K.R.1    Songer, A.D.2    Barash, M.3
  • 30
    • 14744295028 scopus 로고    scopus 로고
    • Chandos Publishing, Limited, Oxford, U. K.
    • Mosey, D. (1998). Design and build in action, Chandos Publishing, Limited, Oxford, U. K.
    • (1998) Design and Build in Action
    • Mosey, D.1
  • 31
    • 0028732528 scopus 로고
    • Critical analysis of time and cost of management and traditional contracts
    • Naoum, S. G. (1994). "Critical analysis of time and cost of management and traditional contracts." J. Constr. Eng. Manage., 120(4), 687-705.
    • (1994) J. Constr. Eng. Manage. , vol.120 , Issue.4 , pp. 687-705
    • Naoum, S.G.1
  • 32
    • 0028452760 scopus 로고
    • Building procurement by design and build approach
    • Ndekugri, I., and Turner, A. (1994). "Building procurement by design and build approach." J. Constr. Eng. Manage., 120(2), 243-256.
    • (1994) J. Constr. Eng. Manage. , vol.120 , Issue.2 , pp. 243-256
    • Ndekugri, I.1    Turner, A.2
  • 33
    • 0033882039 scopus 로고    scopus 로고
    • The anatomy of two projects: A comparative analysis approach
    • Newcombe, R. (2000). "The anatomy of two projects: A comparative analysis approach." Int. J. Proj. Manage., 18(3), 189-199.
    • (2000) Int. J. Proj. Manage. , vol.18 , Issue.3 , pp. 189-199
    • Newcombe, R.1
  • 34
    • 0025258171 scopus 로고
    • Margin of profit: Teamwork
    • Norris, W. E. (1990). "Margin of profit: Teamwork." J. Manage. Eng., 6(1), 20-28.
    • (1990) J. Manage. Eng. , vol.6 , Issue.1 , pp. 20-28
    • Norris, W.E.1
  • 35
    • 0027623833 scopus 로고
    • Checklist of critical success factors for building projects
    • Parfitt, M. K., and Sanvido, V. E. (1993). "Checklist of critical success factors for building projects." J. Manage. Eng., 9(3), 243-249.
    • (1993) J. Manage. Eng. , vol.9 , Issue.3 , pp. 243-249
    • Parfitt, M.K.1    Sanvido, V.E.2
  • 36
    • 0040606522 scopus 로고
    • A decision support system for predicting project success
    • Riggs, J. L., Goodman, M., Finley, R., and Miller, T. (1992). "A decision support system for predicting project success." Proj. Manage. J., 22(3), 37-43.
    • (1992) Proj. Manage. J. , vol.22 , Issue.3 , pp. 37-43
    • Riggs, J.L.1    Goodman, M.2    Finley, R.3    Miller, T.4
  • 37
    • 0033715551 scopus 로고    scopus 로고
    • Design/build methods for electrical contracting industry
    • Rowings, J. E., Jr., Federle, M. O., and Rusk, J. (2000). "Design/build methods for electrical contracting industry." J. Constr. Eng. Manage., 126(1), 15-21.
    • (2000) J. Constr. Eng. Manage. , vol.126 , Issue.1 , pp. 15-21
    • Rowings Jr., J.E.1    Federle, M.O.2    Rusk, J.3
  • 38
    • 0025415669 scopus 로고
    • Setting and meeting requirements for quality
    • Saarinen, A. W., Jr., and Hobel, M. A. (1990). "Setting and meeting requirements for quality." J. Manage. Eng., 6(2), 177-185.
    • (1990) J. Manage. Eng. , vol.6 , Issue.2 , pp. 177-185
    • Saarinen Jr., A.W.1    Hobel, M.A.2
  • 40
    • 0002540586 scopus 로고    scopus 로고
    • Mapping the dimensions of project success
    • Shenhar, A. J., Levy, O., and Dvir, D. (1997). "Mapping the dimensions of project success." Proj. Manage. J., 28(2), 5-13.
    • (1997) Proj. Manage. J. , vol.28 , Issue.2 , pp. 5-13
    • Shenhar, A.J.1    Levy, O.2    Dvir, D.3
  • 42
    • 0008157874 scopus 로고    scopus 로고
    • Selection factors and success criteria for design-build in the US and UK
    • Songer, A. D., and Molenaar, K. R. (1996). "Selection factors and success criteria for design-build in the US and UK." J. Constr. Procure., 2(2), 69-82.
    • (1996) J. Constr. Procure. , vol.2 , Issue.2 , pp. 69-82
    • Songer, A.D.1    Molenaar, K.R.2
  • 43
    • 0000971955 scopus 로고    scopus 로고
    • Project characteristics for successful public-sector design-build
    • Songer, A. D., and Molenaar, K. R. (1997). "Project characteristics for successful public-sector design-build." J. Constr. Eng. Manage., 123(1), 34-40.
    • (1997) J. Constr. Eng. Manage. , vol.123 , Issue.1 , pp. 34-40
    • Songer, A.D.1    Molenaar, K.R.2
  • 44
    • 0030107606 scopus 로고    scopus 로고
    • Blueprint for measuring project quality
    • Stevens, J. D. (1996). "Blueprint for measuring project quality." J. Manage. Eng., 12(2), 34-39.
    • (1996) J. Manage. Eng. , vol.12 , Issue.2 , pp. 34-39
    • Stevens, J.D.1
  • 45
    • 14744291810 scopus 로고
    • Ethyl Benzene project: The client's perspective
    • Tayler, C. J. (1992). "Ethyl Benzene project: the client's perspective." Int. J. Proj. Manage., 10(3), 175-178.
    • (1992) Int. J. Proj. Manage. , vol.10 , Issue.3 , pp. 175-178
    • Tayler, C.J.1
  • 46
    • 14744284246 scopus 로고    scopus 로고
    • Benchmarking engineering and construction-Winning teams
    • Construction Industry Institute, Australia
    • Testi, J., Sidwell, A. C., and Lenard, D. J. (1996). "Benchmarking engineering and construction-Winning teams." Research Rep. 5, 2nd Ed., Construction Industry Institute, Australia.
    • (1996) Research Rep. 5, 2nd Ed.
    • Testi, J.1    Sidwell, A.C.2    Lenard, D.J.3
  • 47
    • 0035132348 scopus 로고    scopus 로고
    • Customer satisfaction in home building
    • Torbica, Z. M., and Stroh, R. C. (2001). "Customer satisfaction in home building." J. Constr. Eng. Manage., 127(1), 82-86.
    • (2001) J. Constr. Eng. Manage. , vol.127 , Issue.1 , pp. 82-86
    • Torbica, Z.M.1    Stroh, R.C.2
  • 48
    • 0002461625 scopus 로고    scopus 로고
    • The contribution of the construction management team to good construction time performance - An Australian experience
    • Walker, D. H. T. (1996). "The contribution of the construction management team to good construction time performance - An Australian experience." J. Constr. Procure., 2(2), 4-18.
    • (1996) J. Constr. Procure. , vol.2 , Issue.2 , pp. 4-18
    • Walker, D.H.T.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.