메뉴 건너뛰기




Volumn 18, Issue 2, 2012, Pages 158-172

Process and quality improvement using Six Sigma in construction industry

Author keywords

Construction industry; Construction quality; DFSS; Process improvement; Six Sigma

Indexed keywords

BUILDING CONSTRUCTION; CONCRETE CRACKING; CONSTRUCTION CYCLE; CONSTRUCTION MANAGER; CONSTRUCTION PROCESS; CONSTRUCTION QUALITY; CORRECTION MEASURES; CRITICAL DEFECTS; CUSTOMER REQUIREMENTS; DESIGN FOR SIX SIGMA; DFSS; FINITE ELEMENT ANALYSIS MODEL; HIGH QUALITY; IMPROVEMENT MEASURE; IN-BUILDINGS; MANAGEMENT PROCEDURES; MIX PROPORTIONS; PRACTICAL SOLUTIONS; PROCESS IMPROVEMENT; PRODUCTION FLOWS; QUALITY IMPROVEMENT; SIX SIGMA; SIX SIGMA METHODS; STEEL-CONCRETE; THREE PHASIS;

EID: 84862877691     PISSN: 13923730     EISSN: 18223605     Source Type: Journal    
DOI: 10.3846/13923730.2012.657411     Document Type: Article
Times cited : (39)

References (50)
  • 1
    • 33748934596 scopus 로고    scopus 로고
    • Assessing the degree of industrialisation in construction - A case of Uganda
    • Alinaitwe, H. M.; Mwakali, J.; Hansson, B. 2006. Assessing the degree of industrialisation in construction - a case of ganda, Journal of Civil Engineering and Management 12(3): 221-229. http://dx.doi.org/10.1080/13923730. 2006.9636396 (Pubitemid 44434546)
    • (2006) Journal of Civil Engineering and Management , vol.12 , Issue.3 , pp. 221-229
    • Alinaitwe, H.M.1    Mwakali, J.2    Hansson, B.3
  • 2
    • 45749088456 scopus 로고    scopus 로고
    • An assessment of clients' performance in having an efficient building process in Uganda
    • Alinaitwe, H. M. 2008. An assessment of clients' performance in having an efficient building process in Uganda, Journal of Civil Engineering and Management 14(2): 73-78 http://dx.doi.org/10.3846/1392-3730.2008.14.1
    • (2008) Journal of Civil Engineering and Management , vol.14 , Issue.2 , pp. 73-78
    • Alinaitwe, H.M.1
  • 3
    • 0031206984 scopus 로고    scopus 로고
    • Total quality management in the construction process
    • PII S0263786396000762
    • Arditi, D.; Gunaydin, H. M. 1997. Total quality management in the construction process, International Journal of Project Management 15(4): 235-243. http://dx.doi.org/10.1016/S0263-7863(96)00076-2 (Pubitemid 127417890)
    • (1997) International Journal of Project Management , vol.15 , Issue.4 , pp. 235-243
    • Arditi, D.1    Gunaydin, H.M.2
  • 4
    • 0033980854 scopus 로고    scopus 로고
    • Trends in productivity improvement in the US construction industry
    • Arditi, D.; Mochtar, K. 2000. Trends in productivity improvement in the US construction industry, Construction Management and Economics 18(1): 15-27. http://dx.doi.org/10.1080/014461900370915 (Pubitemid 30095012)
    • (2000) Construction Management and Economics , vol.18 , Issue.1 , pp. 15-27
    • Arditi, D.1    Mochtar, K.2
  • 5
    • 23844457996 scopus 로고    scopus 로고
    • Six sigma or design for six sigma?
    • DOI 10.1108/09544780410541909
    • Bañuelas, R.; Antony, J. 2004. Six sigma or design for six sigma? The TQM Magazine 16(4): 250-263. http://dx.doi.org/10.1108/09544780410541909 (Pubitemid 41143989)
    • (2004) TQM Magazine , vol.16 , Issue.4 , pp. 250-263
    • Bauelas, R.1    Antony, J.2
  • 6
    • 26644442351 scopus 로고    scopus 로고
    • An application of Six Sigma to reduce waste
    • DOI 10.1002/qre.669
    • Bañuelas, R.; Antony, J.; Brace, M. 2005. An application of Six Sigma to reduce waste, Quality and Reliability Engineering International 21(6): 553-570. http://dx.doi.org/10.1002/qre.669 (Pubitemid 41441214)
    • (2005) Quality and Reliability Engineering International , vol.21 , Issue.6 , pp. 553-570
    • Banuelas, R.1    Antony, J.2    Brace, M.3
  • 7
    • 33748699781 scopus 로고    scopus 로고
    • Selection of six sigma projects in the UK
    • DOI 10.1108/09544780610685485
    • Bañuelas, R.; Tennant, C.; Tuersley, I.; Tang, S. 2006. Selection of six sigma projects in the UK, The TQM Magazine 18(5): 514-527. http://dx.doi.org/10.1108/09544780610685485 (Pubitemid 44395666)
    • (2006) TQM Magazine , vol.18 , Issue.5 , pp. 514-527
    • Banuelas, R.1    Tennant, C.2    Tuersley, I.3    Tang, S.4
  • 8
    • 32144456186 scopus 로고    scopus 로고
    • Benefit evaluation for off-site production in construction
    • DOI 10.1080/01446190500184444, PII U584X511680
    • Blismas, N.; Pasquire, C.; Gibb, A. 2006. Benefit evaluation for off-site production in construction, Construction Management and Economics 24(2): 121-130. http://dx.doi.org/10.1080/01446190500184444 (Pubitemid 43203266)
    • (2006) Construction Management and Economics , vol.24 , Issue.2 , pp. 121-130
    • Blismas, N.1    Pasquire, C.2    Gibb, A.3
  • 9
    • 67349260418 scopus 로고    scopus 로고
    • Six Sigma programs: An implementation model
    • Chakravorty, S. S. 2009. Six Sigma programs: An implementation model, International Journal of Production Economics 119(1): 1-16. http://dx.doi.org/ 10.1016/j.ijpe.2009.01.003
    • (2009) International Journal of Production Economics , vol.119 , Issue.1 , pp. 1-16
    • Chakravorty, S.S.1
  • 11
    • 0023978123 scopus 로고
    • Web openings in composite beams with ribbed slabs
    • Donahey, R. C.; Darwin, D. 1988. Web openings in composite beams with ribbed slabs, Journal of Structural Engineering ASCE 114(3): 518-534. http://dx.doi.org/10.1061/(ASCE)0733-9445(1988)114:3(518) (Pubitemid 18575338)
    • (1988) Journal of structural engineering New York, N.Y. , vol.114 , Issue.3 , pp. 518-534
    • Donahey Rex, C.1    Darwin David2
  • 12
    • 45749142895 scopus 로고    scopus 로고
    • Construction clients and innovations: An understanding of their roles and impact
    • 2007
    • Egbu, C.; Ilozor, B. 2007. Construction clients and innovations: an understanding of their roles and impact, in Proc. of CIB World Building Congress, 2007. 3259-3267.
    • (2007) Proc. of CIB World Building Congress , pp. 3259-3267
    • Egbu, C.1    Ilozor, B.2
  • 13
    • 70349589625 scopus 로고    scopus 로고
    • Factors affecting the performance of construction projects in the Gaza Strip
    • Enshassi, A.; Mohamed, S.; Abushaban, S. 2009. Factors affecting the performance of construction projects in the Gaza Strip, Journal of Civil Engineering and Management 15(3): 269-280. http://dx.doi.org/10.3846/1392-3730. 2009.15.269-280
    • (2009) Journal of Civil Engineering and Management , vol.15 , Issue.3 , pp. 269-280
    • Enshassi, A.1    Mohamed, S.2    Abushaban, S.3
  • 14
    • 67949083726 scopus 로고    scopus 로고
    • Modern building materials and their investigation methods
    • Gailius, A.; Kinuthia, J. M. 2009. Modern building materials and their investigation methods, Journal of Civil Engineering and Management 15(2): 129-130. http://dx.doi.org/10.3846/1392-3730.2009.15.129-130
    • (2009) Journal of Civil Engineering and Management , vol.15 , Issue.2 , pp. 129-130
    • Gailius, A.1    Kinuthia, J.M.2
  • 15
    • 35649018730 scopus 로고    scopus 로고
    • Understanding Six Sigma®: Implications for industry and education
    • Goffnett, S. P. 2004. Understanding Six Sigma®: implications for industry and education, Journal of Industrial Technology 20(4): 1-10.
    • (2004) Journal of Industrial Technology , vol.20 , Issue.4 , pp. 1-10
    • Goffnett, S.P.1
  • 16
    • 34250698335 scopus 로고    scopus 로고
    • Future opportunities for offsite in the UK
    • DOI 10.1080/01446190601071821, PII 779528153
    • Goodier, C.; Gibb, A. 2007. Future opportunities for offsite in the UK, Construction Management and Economics 25(6): 585-595. http://dx.doi.org/10.1080/ 01446190601071821 (Pubitemid 46958453)
    • (2007) Construction Management and Economics , vol.25 , Issue.6 , pp. 585-595
    • Goodier, C.1    Gibb, A.2
  • 17
    • 37249083919 scopus 로고    scopus 로고
    • Six sigma-based approach to improve performance in construction operations
    • DOI 10.1061/(ASCE)0742-597X(2008)24:1(21)
    • Han, S. H.; Chae, M. J.; Im, D. S.; Ryu, H. D. 2008. Six Sigma-Based approach to improve performance in construction operations, Journal of Management in Engineering S 24(1): 21-31. http://dx.doi.org/10.1061/(ASCE)0742- 597X(2008)24:1(21) (Pubitemid 350274457)
    • (2008) Journal of Management in Engineering , vol.24 , Issue.1 , pp. 21-31
    • Han, S.H.1    Chae, M.J.2    Im, K.S.3    Ryu, H.D.4
  • 19
    • 77950219982 scopus 로고    scopus 로고
    • Customer behavior and decision making in the refurbishment industry - A data mining approach
    • Huang, C.-F.; Hsueh, S.-L. 2010. Customer behavior and decision making in the refurbishment industry - a data mining approach, Journal of Civil Engineering and Management 16(1): 75-84. http://dx.doi.org/10.3846/jcem.2010.07
    • (2010) Journal of Civil Engineering and Management , vol.16 , Issue.1 , pp. 75-84
    • Huang, C.-F.1    Hsueh, S.-L.2
  • 20
    • 77950259515 scopus 로고    scopus 로고
    • Influence of quality performance on clients' patronage of indigenous and expatriate construction contractors in Nigeria
    • Idoro, G. I. 2010. Influence of quality performance on clients' patronage of indigenous and expatriate construction contractors in Nigeria, Journal of Civil Engineering and Management 16(1): 65-73. http://dx.doi.org/10.3846/jcem. 2010.06
    • (2010) Journal of Civil Engineering and Management , vol.16 , Issue.1 , pp. 65-73
    • Idoro, G.I.1
  • 21
    • 84862877833 scopus 로고    scopus 로고
    • Quality improvement in the construction industry: Three systematic approaches
    • Ilías, O.; Soren, B. 2000. Quality improvement in the construction industry: three systematic approaches. ITEM-HSG QM&T Report No. 10. 13 p.
    • (2000) ITEM-HSG QM&T Report No. 10 , pp. 13
    • Ilías, O.1    Soren, B.2
  • 22
    • 53349089708 scopus 로고    scopus 로고
    • Sustainable construction aspects of using prefabrication in dense urban environment: A Hong Kong case study
    • Jaillon, L.; Poon, C. S. 2008. Sustainable construction aspects of using prefabrication in dense urban environment: a Hong Kong case study, Construction Management and Economics 26(9): 953-966. http://dx.doi.org/10.1080/ 01446190802259043
    • (2008) Construction Management and Economics , vol.26 , Issue.9 , pp. 953-966
    • Jaillon, L.1    Poon, C.S.2
  • 23
    • 55549143657 scopus 로고    scopus 로고
    • Quantifying the waste reduction potential of using prefabrication in building construction in Hong Kong
    • Jaillon, L.; Poon, C. S.; Chiang, Y. H. 2009. Quantifying the waste reduction potential of using prefabrication in building construction in Hong Kong, Waste Management 29(1): 309-320. http://dx.doi.org/doi:10.1016/j.wasman. 2008.02.015
    • (2009) Waste Management , vol.29 , Issue.1 , pp. 309-320
    • Jaillon, L.1    Poon, C.S.2    Chiang, Y.H.3
  • 24
    • 58949093608 scopus 로고    scopus 로고
    • The evolution of prefabricated residential building systems in Hong Kong: A review of the public and the private sector
    • Jaillon, L.; Poon, C. S. 2009. The evolution of prefabricated residential building systems in Hong Kong: A review of the public and the private sector, Automation in Construction 18(3): 239-248. http://dx.doi.org/10.1016/j.autcon. 2008.09.002
    • (2009) Automation in Construction , vol.18 , Issue.3 , pp. 239-248
    • Jaillon, L.1    Poon, C.S.2
  • 26
    • 33745223071 scopus 로고    scopus 로고
    • Experimental behavior of reinforced concrete column models strengthened by CFRP aterials
    • Kaminski, M.; Trapko, T. 2006. Experimental behavior of reinforced concrete column models strengthened by CFRP aterials, Journal of Civil Engineering and Management 12(2): 109-115.
    • (2006) Journal of Civil Engineering and Management , vol.12 , Issue.2 , pp. 109-115
    • Kaminski, M.1    Trapko, T.2
  • 28
    • 77958062633 scopus 로고    scopus 로고
    • An integrated framework for reducing precast fabrication inventory
    • Ko, C.-H. 2010. An integrated framework for reducing precast fabrication inventory, Journal of Civil Engineering and Management 16(3): 418-127. http://dx.doi.org/10.3846/jcem.2010.48
    • (2010) Journal of Civil Engineering and Management , vol.16 , Issue.3 , pp. 418-127
    • Ko, C.-H.1
  • 29
    • 1542502881 scopus 로고    scopus 로고
    • Design for six sigma through robust optimization
    • Koch, P. N.; Yang, R.-J.; Gu, L. 2004. Design for six sigma through robust optimization, Structural and Multidisciplinary Optimization 26(3-4): 235-248. http://dx.doi.org/10.1007/s00158-003-0337-0
    • (2004) Structural and Multidisciplinary Optimization , vol.26 , Issue.3-4 , pp. 235-248
    • Koch, P.N.1    Yang, R.-J.2    Gu, L.3
  • 30
    • 84862840984 scopus 로고    scopus 로고
    • Utility design for reliability optimization with Six Sigma tools
    • 21-24 May, Vienna, Austria. Session 5, Paper No 0684
    • Laudati, R. P. 2007.Utility design for reliability optimization with Six Sigma tools, in The 19th International Conference on Electricity Distribution (CIRED'2007), 21-24 May, Vienna, Austria. Session 5, Paper No 0684: 1-5. http://dx.doi.org/10.1061/(ASCE)0733-9445(2005)131:10(1593)
    • (2007) The 19th International Conference on Electricity Distribution (CIRED'2007) , pp. 1-5
    • Laudati, R.P.1
  • 31
    • 26644465313 scopus 로고    scopus 로고
    • Strength analysis of steel-concrete composite beams in combined bending and shear
    • DOI 10.1061/(ASCE)0733-9445(2005)131:10(1593)
    • Liang, Q. Q.; Uy, B.; Bradford, M. A.; Ronagh, H. R.; Ronagh, H. R. 2005. Strength analysis of steel - concrete composite beams in combined bending and shear, Journal of Structural Engineering ASCE 131(10): 1593-1600. (Pubitemid 41441401)
    • (2005) Journal of Structural Engineering , vol.131 , Issue.10 , pp. 1593-1600
    • Liang, Q.Q.1    Uy, B.2    Bradford, M.A.3    Ronagh, H.R.4
  • 32
    • 0034049562 scopus 로고    scopus 로고
    • Employee perceptions of the solid waste management system operating in a large Australian contracting organization: Implications for company policy implementation
    • Lingard, H.; Gradam, P.; Smithers, G. 2000. Employee perceptions of the solid waste management system operating in a large Australian contracting organization: implications for company policy implementation, Construction Management and Economics 18(4): 383-393. http://dx.doi.org/10.1080/ 01446190050024806 (Pubitemid 30409801)
    • (2000) Construction Management and Economics , vol.18 , Issue.4 , pp. 383-393
    • Lingard, H.1    Graham, P.2    Smithers, G.3
  • 33
    • 0000797825 scopus 로고    scopus 로고
    • Quantifying the causes and costs of rework in construction
    • Love, E. D. P; Li, H. 2000. Quantifying the causes and costs of rework in construction, Construction Management and Economics 18(4): 479-490. http://dx.doi.org/10.1080/01446190050024897
    • (2000) Construction Management and Economics , vol.18 , Issue.4 , pp. 479-490
    • Love, E.D.P.1    Li, H.2
  • 34
    • 77953775187 scopus 로고    scopus 로고
    • Examination of worker-location measurement methods as a research tool for automated labor control
    • Navon, R; Goldschmidt, E. 2010. Examination of worker-location measurement methods as a research tool for automated labor control, Journal of Civil Engineering and Management 16(2): 249-256. http://dx.doi.org/10.3846/jcem. 2010.29
    • (2010) Journal of Civil Engineering and Management , vol.16 , Issue.2 , pp. 249-256
    • Navon, R.1    Goldschmidt, E.2
  • 35
    • 38549130345 scopus 로고    scopus 로고
    • What should you really measure if you want to compare prefabrication with traditional construction?
    • R. Kenley (Ed.). Sydney: International Group on Lean Construction, 2005
    • Pasquire, C.; Gibb, A.; Blismas, N. 2005. What should you really measure if you want to compare prefabrication with traditional construction?, in R. Kenley (Ed.). Proc. of The 13th International Group for Lean Construction Conference. Sydney: International Group on Lean Construction, 2005: 481-491.
    • (2005) Proc. of the 13th International Group for Lean Construction Conference , pp. 481-491
    • Pasquire, C.1    Gibb, A.2    Blismas, N.3
  • 36
    • 13944279570 scopus 로고    scopus 로고
    • Implementing and applying Six Sig a in construction
    • Pheng, L. S.; Hui, M. S. 2004. Implementing and applying Six Sig a in construction, Journal of Construction Engineering and Management ASCE 130(4): 482-189. http://dx.doi.org/10.1061/(ASCE)0733-9364(2004)130:4(482)
    • (2004) Journal of Construction Engineering and Management ASCE , vol.130 , Issue.4 , pp. 482-189
    • Pheng, L.S.1    Hui, M.S.2
  • 37
    • 77950272967 scopus 로고    scopus 로고
    • Precast concrete systems in developing vs. industrialized countries
    • Polat, G. 2010. Precast concrete systems in developing vs. industrialized countries, Journal of Civil Engineering and Management 16(1): 85-94.
    • (2010) Journal of Civil Engineering and Management , vol.16 , Issue.1 , pp. 85-94
    • Polat, G.1
  • 41
    • 33646090134 scopus 로고    scopus 로고
    • Evolution of quality: First fifty issues of production and operations management
    • Schroeder, R. G.; Linderman, K.; Zhang, D. 2005. Evolution of quality: first fifty issues of production and operations management, Production and Operations Management 14(4): 468-481 http://dx.doi.org/10.1111/j.1937-5956.2005. tb00234.x (Pubitemid 43625026)
    • (2005) Production and Operations Management , vol.14 , Issue.4 , pp. 468-481
    • Schroeder, R.G.1    Linderman, K.2    Zhang, D.3
  • 43
    • 0036778996 scopus 로고    scopus 로고
    • Implementation of environmental management in the Hong Kong construction industry
    • DOI 10.1016/S0263-7863(01)00054-0, PII S0263786301000540
    • Shen, L. Y.; Tam, W. Y. V. 2002. Implementation of environmental management in the Hong Kong construction industry, International Journal of Project Management 20(7): 535-543. http://dx.doi.org/10.1016/S0263-7863(01) 00054-0 (Pubitemid 34696545)
    • (2002) International Journal of Project Management , vol.20 , Issue.7 , pp. 535-543
    • Shen, L.Y.1    Tam, V.W.Y.2
  • 44
    • 33646437258 scopus 로고    scopus 로고
    • Six-sigma as a strategy for process improvement on construction projects: A case study
    • DOI 10.1080/01446190500521082, PII LX314705461277
    • Stewart, R. A.; Spencer, C. A. 2006. Six Sigma as a strategy for process improvement on construction projects: a case study, Construction Management and Economics 24(4): 339-348. http://dx.doi.org/10.1080/01446190500521082 (Pubitemid 43675235)
    • (2006) Construction Management and Economics , vol.24 , Issue.4 , pp. 339-348
    • Stewart, R.A.1    Spencer, C.A.2
  • 45
    • 36048929829 scopus 로고    scopus 로고
    • Quality improvement in construction by using a Vandermonde interpolation technique
    • Tam, V. W. Y.; Le, K. N. 2007. Quality improvement in construction by using a Vandermonde interpolation technique, International Journal of Project Management 25(8): 815823. http://dx.doi.org/10.1016/j.ijproman.2007.03.009
    • (2007) International Journal of Project Management , vol.25 , Issue.8 , pp. 815823
    • Tam, V.W.Y.1    Le, K.N.2
  • 46
    • 34249942080 scopus 로고    scopus 로고
    • Towards adoption of prefabrication in construction
    • DOI 10.1016/j.buildenv.2006.10.003, PII S0360132306002873
    • Tarn, V. W. Y.; Tarn, C. M.; Zeng, S. X.; Ng, W. C. Y. 2007a. Towards adoption of prefabrication in construction, Building and Environment 42(10): 3642-3654. http://dx.doi.org/10.1016/j.buildenv.2006.10.003 (Pubitemid 46876973)
    • (2007) Building and Environment , vol.42 , Issue.10 , pp. 3642-3654
    • Tam, V.W.Y.1    Tam, C.M.2    Zeng, S.X.3    Ng, W.C.Y.4
  • 47
    • 84862846364 scopus 로고    scopus 로고
    • An examination on the practice of adopting prefabrication for construction projects
    • Tam, V. W. Y.; Tam, C. M.; Ng, W. C. Y. 2007b. An examination on the practice of adopting prefabrication for construction projects, International Journal of Construction Management 7(2): 53-64.
    • (2007) International Journal of Construction Management , vol.7 , Issue.2 , pp. 53-64
    • Tam, V.W.Y.1    Tam, C.M.2    Ng, W.C.Y.3
  • 48
    • 45749131796 scopus 로고    scopus 로고
    • Using Gaussian and Hyperbolic distributions for quality improvement in construction: Case study approach
    • Tam, W. Y. V; Le, K. N.; Le, H. N. 2008. Using Gaussian and Hyperbolic distributions for quality improvement in construction: case study approach, Journal of Construction Engineering and Management ASCE 134(7): 555- 561. http://dx.doi.org/10.1061/(ASCE)0733-9364(2008) 134:7(555)
    • (2008) Journal of Construction Engineering and Management ASCE , vol.134 , Issue.7 , pp. 555-561
    • Tam, W.Y.V.1    Le, K.N.2    Le, H.N.3
  • 50
    • 48749129151 scopus 로고    scopus 로고
    • The evolving theory of quality management: The role of Six Sigma
    • Zu, X.; Fredendall, L. D.; Douglas, T. J. 2008. The evolving theory of quality management: the role of Six Sigma, Journal of Operations Management 26(5): 630-650. http://dx.doi.org/10.1016/j.jom.2008.02.001
    • (2008) Journal of Operations Management , vol.26 , Issue.5 , pp. 630-650
    • Zu, X.1    Fredendall, L.D.2    Douglas, T.J.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.