메뉴 건너뛰기




Volumn 16, Issue 2, 2010, Pages 249-256

Examination of worker-location measurement methods as a research tool for automated labor control

Author keywords

Automation; Control methods; Data collection; Research tools

Indexed keywords

AUTOMATION CONTROLS; DATA COLLECTION; FUNCTION OF TIME; LABOR CONTROL; MEASUREMENT METHODS; PERFORMANCE MEASUREMENTS; RESEARCH TOOLS; SPECIAL ALGORITHMS; TIME-LAPSE TECHNIQUES;

EID: 77953775187     PISSN: 13923730     EISSN: 18223605     Source Type: Journal    
DOI: 10.3846/jcem.2010.29     Document Type: Article
Times cited : (3)

References (22)
  • 1
    • 3142750829 scopus 로고    scopus 로고
    • Representing work spaces generically in construction method models
    • DOI 10.1061/(ASCE)0733-9364(2002)128:4(296)
    • Akinci, B.; Fischer, M., Kuntz, J. and Levit, R. 2002. Representing work spaces generically in construction method models, Journal of Construction Engineering and Management-ASCE 128(4): 296-305. doi:10.1061/(ASCE)0733- 9364(2002)128:4(296) (Pubitemid 40265534)
    • (2002) Journal of Construction Engineering and Management , vol.128 , Issue.4 , pp. 296-305
    • Akinci, B.1    Fischer, M.2    Kunz, J.3    Levitt, R.4
  • 5
    • 0030645102 scopus 로고    scopus 로고
    • Bar-code control of construction field personnel and construction materials
    • Philadelphia, Pennsylvania (USA)
    • Echeverry, D. and Beltran, A. 1997. Bar-code control of construction field personnel and construction materials, in 4th Congress on Computing in Civil Engineering, Philadelphia, Pennsylvania (USA).
    • (1997) 4th Congress on Computing in Civil Engineering
    • Echeverry, D.1    Beltran, A.2
  • 8
    • 0035509946 scopus 로고    scopus 로고
    • Simplified spreadsheet solutions: I: Subcontractor information system
    • DOI 10.1061/(ASCE)0733-9364(2001)127:6(461), Reportnr 22159
    • Hegazy, T. and Ersahin, T. 2001. Simplified spreadsheet solutions: I: Subcontractor information system, Journal of Construction Engineering and Management - ASCE 127(6): 461-468. doi:10.1061/(ASCE)0733-9364(2001)127:6(461) (Pubitemid 33137750)
    • (2001) Journal of Construction Engineering and Management , vol.127 , Issue.6 , pp. 461-468
    • Hegazy, T.1    Ersahin, T.2
  • 10
    • 13944281379 scopus 로고    scopus 로고
    • Implementing radio frequency identification in the construction process
    • DOI 10.1061/(ASCE)0733-9364(2003)129:6(680)
    • Jaselskis, E. J. and El-Misalami, T. 2003. Implementing radio frequency identification in the construction process, Journal of Construction Engineering and Management -ASCE 129(6): 680-688. doi:10.1061/(ASCE)0733-9364(2003)129: 6(680) (Pubitemid 40265428)
    • (2003) Journal of Construction Engineering and Management , vol.129 , Issue.6 , pp. 680-688
    • Jaselskis, E.J.1    El-Misalami, T.2
  • 12
    • 13944281377 scopus 로고    scopus 로고
    • Can labor inputs be measured and controlled automatically?
    • DOI 10.1061/(ASCE)0733-9364(2003)129:4(437)
    • Navon, R. and Goldschmidt, E. 2003a. Can labor inputs be measured and controlled automatically? Journal of Construction Engineering and Management - ASCE 129(4): 437-445. doi: 10.1061/(ASCE)0733-9364(2003)129:4(437) (Pubitemid 40265458)
    • (2003) Journal of Construction Engineering and Management , vol.129 , Issue.4 , pp. 437-445
    • Navon, R.1    Goldschmidt, E.2
  • 13
    • 0037332784 scopus 로고    scopus 로고
    • Monitoring labor inputs: Automated-data-collection model and enabling technologies
    • DOI 10.1016/S0926-5805(02)00043-2, PII S0926580502000432
    • Navon, R. and Goldschmidt, E. 2003b. Monitoring labor inputs: automated-data-collection model and enabling technologies, Automation in Construction 12(2): 185-199. doi:10.1016/S0926-5805(02)00043-2 (Pubitemid 35349801)
    • (2003) Automation in Construction , vol.12 , Issue.2 , pp. 185-199
    • Navon, R.1    Goldschmidt, E.2
  • 14
    • 0346639292 scopus 로고    scopus 로고
    • A concept proving prototype of automated earthmoving control
    • doi:10.1016/j.autcon.2003.08.002
    • Navon, R.; Goldschmidt, E. and Shpatnisky, Y. 2004. A concept proving prototype of automated earthmoving control, Automation in Construction 13(2): 225-239. doi:10.1016/j.autcon.2003.08.002
    • (2004) Automation in Construction , vol.13 , Issue.2 , pp. 225-239
    • Navon, R.1    Goldschmidt, E.2    Shpatnisky, Y.3
  • 15
    • 33845708588 scopus 로고    scopus 로고
    • Is detailed progress monitoring possible without designated manual data collection?
    • doi:10.1080/01446190600999097
    • Navon, R. and Haskaya, I. 2007. Is detailed progress monitoring possible without designated manual data collection? Construction Management and Economics 24(12): 1225-1229. doi:10.1080/01446190600999097
    • (2007) Construction Management and Economics , vol.24 , Issue.12 , pp. 1225-1229
    • Navon, R.1    Haskaya, I.2
  • 17
    • 33846030439 scopus 로고    scopus 로고
    • An application of PDA and barcode technology for the improvement of information management in construction projects, in
    • September 21- 25, Jeju, Korea, 2004
    • Oh, S.W.; Chang, H. J.; Kim, Y. S.; Lee, J. B. and Kim, H. S. 2004. An application of PDA and barcode technology for the improvement of information management in construction projects, in Proc of 21st International Symposium on Automation and Robotics in Construction, September 21- 25, 2004, Jeju, Korea, 518-524.
    • (2004) Proc of 21st International Symposium on Automation and Robotics in Construction , pp. 518-524
    • Oh, S.W.1    Chang, H.J.2    Kim, Y.S.3    Lee, J.B.4    Kim, H.S.5
  • 18
    • 1342268190 scopus 로고    scopus 로고
    • A traceability system between plant and work site for asphalt pavements
    • DOI 10.1111/j.1467-8667.2004.00337.x
    • Peyret, F. and Tasky, R. 2004. A traceability system between plant and work site for asphalt pavements, Computer-Aided Civil and Infrastructure Engineering 19(1): 54-63. doi:10.1111/j.1467-8667.2004.00337.x (Pubitemid 38241929)
    • (2004) Computer-Aided Civil and Infrastructure Engineering , vol.19 , Issue.1 , pp. 54-63
    • Peyret, F.1    Tasky, R.2
  • 19
    • 0029470095 scopus 로고
    • Patterns of construction-space use in multistory buildings
    • doi:10.1061/(ASCE)0733-9364(1995)121:4(464)
    • Riley, D. R. and Sanvido, V. E. 1995. Patterns of construction-space use in multistory buildings, Journal of Construction Engineering and Management - ASCE 121(4): 464-473. doi:10.1061/(ASCE)0733-9364(1995)121:4(464)
    • (1995) Journal of Construction Engineering and Management-ASCE , vol.121 , Issue.4 , pp. 464-473
    • Riley, D.R.1    Sanvido, V.E.2
  • 22
    • 0035479050 scopus 로고    scopus 로고
    • Benchmarking on-site productivity in France and the UK: A CALIBRE approach
    • DOI 10.1080/01446190110062465
    • Winch, G. and Carr, B. 2001. Benchmarking on-site productivity in France and the UK: a CALIBRE approach, Construction Management and Economics 19: 577-590. doi: 10.1080/01446190110062465 (Pubitemid 32863518)
    • (2001) Construction Management and Economics , vol.19 , Issue.6 , pp. 577-590
    • Winch, G.1    Carr, B.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.