-
1
-
-
3142750829
-
Representing work spaces generically in construction method models
-
DOI 10.1061/(ASCE)0733-9364(2002)128:4(296)
-
Akinci, B.; Fischer, M., Kuntz, J. and Levit, R. 2002. Representing work spaces generically in construction method models, Journal of Construction Engineering and Management-ASCE 128(4): 296-305. doi:10.1061/(ASCE)0733- 9364(2002)128:4(296) (Pubitemid 40265534)
-
(2002)
Journal of Construction Engineering and Management
, vol.128
, Issue.4
, pp. 296-305
-
-
Akinci, B.1
Fischer, M.2
Kunz, J.3
Levitt, R.4
-
5
-
-
0030645102
-
Bar-code control of construction field personnel and construction materials
-
Philadelphia, Pennsylvania (USA)
-
Echeverry, D. and Beltran, A. 1997. Bar-code control of construction field personnel and construction materials, in 4th Congress on Computing in Civil Engineering, Philadelphia, Pennsylvania (USA).
-
(1997)
4th Congress on Computing in Civil Engineering
-
-
Echeverry, D.1
Beltran, A.2
-
6
-
-
0031645125
-
Implementation of automated site data collection with a medium-sized contractor
-
October 18-21, Boston, USA, 1998
-
Fayek, A.; AbouRizk, S. and Boyd, B. 1998. Implementation of automated site data collection with a medium-sized contractor, in Proc of 1998 International Computing Congress on Computing in Civil Engineering, October 18-21, 1998, Boston, USA, 454-457.
-
(1998)
Proc of 1998 International Computing Congress on Computing in Civil Engineering
, pp. 454-457
-
-
Fayek, A.1
AbouRizk, S.2
Boyd, B.3
-
8
-
-
0035509946
-
Simplified spreadsheet solutions: I: Subcontractor information system
-
DOI 10.1061/(ASCE)0733-9364(2001)127:6(461), Reportnr 22159
-
Hegazy, T. and Ersahin, T. 2001. Simplified spreadsheet solutions: I: Subcontractor information system, Journal of Construction Engineering and Management - ASCE 127(6): 461-468. doi:10.1061/(ASCE)0733-9364(2001)127:6(461) (Pubitemid 33137750)
-
(2001)
Journal of Construction Engineering and Management
, vol.127
, Issue.6
, pp. 461-468
-
-
Hegazy, T.1
Ersahin, T.2
-
10
-
-
13944281379
-
Implementing radio frequency identification in the construction process
-
DOI 10.1061/(ASCE)0733-9364(2003)129:6(680)
-
Jaselskis, E. J. and El-Misalami, T. 2003. Implementing radio frequency identification in the construction process, Journal of Construction Engineering and Management -ASCE 129(6): 680-688. doi:10.1061/(ASCE)0733-9364(2003)129: 6(680) (Pubitemid 40265428)
-
(2003)
Journal of Construction Engineering and Management
, vol.129
, Issue.6
, pp. 680-688
-
-
Jaselskis, E.J.1
El-Misalami, T.2
-
12
-
-
13944281377
-
Can labor inputs be measured and controlled automatically?
-
DOI 10.1061/(ASCE)0733-9364(2003)129:4(437)
-
Navon, R. and Goldschmidt, E. 2003a. Can labor inputs be measured and controlled automatically? Journal of Construction Engineering and Management - ASCE 129(4): 437-445. doi: 10.1061/(ASCE)0733-9364(2003)129:4(437) (Pubitemid 40265458)
-
(2003)
Journal of Construction Engineering and Management
, vol.129
, Issue.4
, pp. 437-445
-
-
Navon, R.1
Goldschmidt, E.2
-
13
-
-
0037332784
-
Monitoring labor inputs: Automated-data-collection model and enabling technologies
-
DOI 10.1016/S0926-5805(02)00043-2, PII S0926580502000432
-
Navon, R. and Goldschmidt, E. 2003b. Monitoring labor inputs: automated-data-collection model and enabling technologies, Automation in Construction 12(2): 185-199. doi:10.1016/S0926-5805(02)00043-2 (Pubitemid 35349801)
-
(2003)
Automation in Construction
, vol.12
, Issue.2
, pp. 185-199
-
-
Navon, R.1
Goldschmidt, E.2
-
14
-
-
0346639292
-
A concept proving prototype of automated earthmoving control
-
doi:10.1016/j.autcon.2003.08.002
-
Navon, R.; Goldschmidt, E. and Shpatnisky, Y. 2004. A concept proving prototype of automated earthmoving control, Automation in Construction 13(2): 225-239. doi:10.1016/j.autcon.2003.08.002
-
(2004)
Automation in Construction
, vol.13
, Issue.2
, pp. 225-239
-
-
Navon, R.1
Goldschmidt, E.2
Shpatnisky, Y.3
-
15
-
-
33845708588
-
Is detailed progress monitoring possible without designated manual data collection?
-
doi:10.1080/01446190600999097
-
Navon, R. and Haskaya, I. 2007. Is detailed progress monitoring possible without designated manual data collection? Construction Management and Economics 24(12): 1225-1229. doi:10.1080/01446190600999097
-
(2007)
Construction Management and Economics
, vol.24
, Issue.12
, pp. 1225-1229
-
-
Navon, R.1
Haskaya, I.2
-
17
-
-
33846030439
-
An application of PDA and barcode technology for the improvement of information management in construction projects, in
-
September 21- 25, Jeju, Korea, 2004
-
Oh, S.W.; Chang, H. J.; Kim, Y. S.; Lee, J. B. and Kim, H. S. 2004. An application of PDA and barcode technology for the improvement of information management in construction projects, in Proc of 21st International Symposium on Automation and Robotics in Construction, September 21- 25, 2004, Jeju, Korea, 518-524.
-
(2004)
Proc of 21st International Symposium on Automation and Robotics in Construction
, pp. 518-524
-
-
Oh, S.W.1
Chang, H.J.2
Kim, Y.S.3
Lee, J.B.4
Kim, H.S.5
-
18
-
-
1342268190
-
A traceability system between plant and work site for asphalt pavements
-
DOI 10.1111/j.1467-8667.2004.00337.x
-
Peyret, F. and Tasky, R. 2004. A traceability system between plant and work site for asphalt pavements, Computer-Aided Civil and Infrastructure Engineering 19(1): 54-63. doi:10.1111/j.1467-8667.2004.00337.x (Pubitemid 38241929)
-
(2004)
Computer-Aided Civil and Infrastructure Engineering
, vol.19
, Issue.1
, pp. 54-63
-
-
Peyret, F.1
Tasky, R.2
-
19
-
-
0029470095
-
Patterns of construction-space use in multistory buildings
-
doi:10.1061/(ASCE)0733-9364(1995)121:4(464)
-
Riley, D. R. and Sanvido, V. E. 1995. Patterns of construction-space use in multistory buildings, Journal of Construction Engineering and Management - ASCE 121(4): 464-473. doi:10.1061/(ASCE)0733-9364(1995)121:4(464)
-
(1995)
Journal of Construction Engineering and Management-ASCE
, vol.121
, Issue.4
, pp. 464-473
-
-
Riley, D.R.1
Sanvido, V.E.2
-
20
-
-
14544282617
-
GPS in the real world of site development
-
(CD-Rom), Las Vegas, USA, University of East Carolina
-
Taylor, D. and Tometich, T. 2003. GPS in the real world of site development, in 3rd Biennial World Conference on Automated Data Collection in Construction (CD-Rom), Las Vegas, USA, University of East Carolina.
-
(2003)
3rd Biennial World Conference on Automated Data Collection in Construction
-
-
Taylor, D.1
Tometich, T.2
-
22
-
-
0035479050
-
Benchmarking on-site productivity in France and the UK: A CALIBRE approach
-
DOI 10.1080/01446190110062465
-
Winch, G. and Carr, B. 2001. Benchmarking on-site productivity in France and the UK: a CALIBRE approach, Construction Management and Economics 19: 577-590. doi: 10.1080/01446190110062465 (Pubitemid 32863518)
-
(2001)
Construction Management and Economics
, vol.19
, Issue.6
, pp. 577-590
-
-
Winch, G.1
Carr, B.2
|