메뉴 건너뛰기




Volumn 24, Issue 1, 2008, Pages 21-31

Six sigma-based approach to improve performance in construction operations

Author keywords

Construction management; Productivity; Quality control; Simulation

Indexed keywords

COMPUTER SIMULATION; MANAGERS; PRODUCTIVITY; QUALITY CONTROL; SCHEDULING;

EID: 37249083919     PISSN: 0742597X     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0742-597X(2008)24:1(21)     Document Type: Article
Times cited : (60)

References (23)
  • 4
    • 3242716315 scopus 로고    scopus 로고
    • Ballard, G. (2000). " Lean project delivery system.. " White Paper No. 8, Lean Construction Institute, Calif., 〈 http:// leanconstruction.org 〉.
    • (2000) Lean Project Delivery System
    • Ballard, G.1
  • 5
    • 1642563373 scopus 로고
    • Toward construction JIT
    • Ballard, G., and Howell, G. (1995). " Toward construction JIT.. " Proc., ARCOM Conf., 〈 http://www.leanconstruction.org/ 〉.
    • (1995) Proc., ARCOM Conf.
    • Ballard, G.1    Howell, G.2
  • 7
    • 0033748170 scopus 로고    scopus 로고
    • Beyond six sigma
    • Buggie, F. D. (2000). " Beyond six sigma.. " J. Manage. Eng., 16 (4), 28-31.
    • (2000) J. Manage. Eng. , vol.16 , Issue.4 , pp. 28-31
    • Buggie, F.D.1
  • 8
    • 12744258025 scopus 로고    scopus 로고
    • Optimizing Implementation of value management processes for capital projects
    • Cha, H. S., and O'Connor, J. T. (2005). " Optimizing Implementation of value management processes for capital projects.. " J. Constr. Eng. Manage., 131 (2), 239-251.
    • (2005) J. Constr. Eng. Manage. , vol.131 , Issue.2 , pp. 239-251
    • Cha, H.S.1    O'Connor, J.T.2
  • 9
    • 37249075772 scopus 로고    scopus 로고
    • Design For Six Sigma (DFSS).
    • Design For Six Sigma (DFSS). (2002). " Six-sigma case of the Steelcase Co.. " 〈 http://www.dfss.co.kr/2002_dfss/index.asp 〉.
    • (2002) Six-sigma Case of the Steelcase Co
  • 12
    • 23044488934 scopus 로고    scopus 로고
    • Role of inventory buffers in construction labor performance
    • Horman, M. J., and Thomas, H. R. (2005). " Role of inventory buffers in construction labor performance.. " J. Constr. Eng. Manage., 131 (7), 834-843.
    • (2005) J. Constr. Eng. Manage. , vol.131 , Issue.7 , pp. 834-843
    • Horman, M.J.1    Thomas, H.R.2
  • 17
    • 37249086508 scopus 로고    scopus 로고
    • Six sigma and lean manufacturing-A merger for world-class performance, but is it really talking place?
    • Kroslid, D. (2002). " Six sigma and lean manufacturing-A merger for world-class performance, but is it really talking place? " Asian J. Quality, 2 (1), 87-104.
    • (2002) Asian J. Quality , vol.2 , Issue.1 , pp. 87-104
    • Kroslid, D.1
  • 19
    • 0035509405 scopus 로고    scopus 로고
    • Just-in-time management of precast concrete components
    • Pheng, L. S., and Chuan, C. J. (2001). " Just-in-time management of precast concrete components.. " J. Constr. Eng. Manage., 127 (6), 494-501.
    • (2001) J. Constr. Eng. Manage. , vol.127 , Issue.6 , pp. 494-501
    • Pheng, L.S.1    Chuan, C.J.2
  • 21
    • 12344327099 scopus 로고    scopus 로고
    • Improving labor flow reliability for better productivity as lean construction principle
    • Thomas, H. R., Horman, M. J., Minchin, E., and Chen, D. (2003). " Improving labor flow reliability for better productivity as lean construction principle.. " J. Constr. Eng. Manage., 129 (3), 251-261.
    • (2003) J. Constr. Eng. Manage. , vol.129 , Issue.3 , pp. 251-261
    • Thomas, H.R.1    Horman, M.J.2    Minchin, E.3    Chen, D.4
  • 22
    • 13944264322 scopus 로고    scopus 로고
    • Reducing variability to improve performance as a lean construction principle
    • Thomas, H. R., Horman, M. J., Souze, U. E., and Zavrski, I. (2002). " Reducing variability to improve performance as a lean construction principle.. " J. Constr. Eng. Manage., 128 (2), 144-154.
    • (2002) J. Constr. Eng. Manage. , vol.128 , Issue.2 , pp. 144-154
    • Thomas, H.R.1    Horman, M.J.2    Souze, U.E.3    Zavrski, I.4
  • 23
    • 2342419514 scopus 로고    scopus 로고
    • Impact of variability and uncertainty on product and process development
    • ASCE, Reston, Va.
    • Tommelein, I. D. (2000). " Impact of variability and uncertainty on product and process development.. " Proc., 6th Construction Congress, ASCE, Reston, Va., 969-976.
    • (2000) Proc., 6th Construction Congress , pp. 969-976
    • Tommelein, I.D.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.