-
3
-
-
37249015803
-
Simulation of construction processes: Traditional practices versus lean principles
-
Berkeley, Calif.
-
Al-Sudairi, A. A., Diekmann, J. E., Songer, A. D., and Brown, H. M. (1999). " Simulation of construction processes: Traditional practices versus lean principles.. " Proc., 7th Annual Conf. of the Int. Group for Lean Construction (IGLC-7), Berkeley, Calif.
-
(1999)
Proc., 7th Annual Conf. of the Int. Group for Lean Construction (IGLC-7)
-
-
Al-Sudairi, A.A.1
Diekmann, J.E.2
Songer, A.D.3
Brown, H.M.4
-
4
-
-
3242716315
-
-
Ballard, G. (2000). " Lean project delivery system.. " White Paper No. 8, Lean Construction Institute, Calif., 〈 http:// leanconstruction.org 〉.
-
(2000)
Lean Project Delivery System
-
-
Ballard, G.1
-
5
-
-
1642563373
-
Toward construction JIT
-
Ballard, G., and Howell, G. (1995). " Toward construction JIT.. " Proc., ARCOM Conf., 〈 http://www.leanconstruction.org/ 〉.
-
(1995)
Proc., ARCOM Conf.
-
-
Ballard, G.1
Howell, G.2
-
6
-
-
0003816185
-
-
Wiley, New York.
-
Breyfogle, F. W., Cupello, J. M., and Meadows, B. (2001). Managing six sigma: A practical guide to understanding, assessing, and implementing the strategy that yields bottom-line success, Wiley, New York.
-
(2001)
Managing Six Sigma: A Practical Guide to Understanding, Assessing, and Implementing the Strategy That Yields Bottom-line Success
-
-
Breyfogle, F.W.1
Cupello, J.M.2
Meadows, B.3
-
7
-
-
0033748170
-
Beyond six sigma
-
Buggie, F. D. (2000). " Beyond six sigma.. " J. Manage. Eng., 16 (4), 28-31.
-
(2000)
J. Manage. Eng.
, vol.16
, Issue.4
, pp. 28-31
-
-
Buggie, F.D.1
-
8
-
-
12744258025
-
Optimizing Implementation of value management processes for capital projects
-
Cha, H. S., and O'Connor, J. T. (2005). " Optimizing Implementation of value management processes for capital projects.. " J. Constr. Eng. Manage., 131 (2), 239-251.
-
(2005)
J. Constr. Eng. Manage.
, vol.131
, Issue.2
, pp. 239-251
-
-
Cha, H.S.1
O'Connor, J.T.2
-
9
-
-
37249075772
-
-
Design For Six Sigma (DFSS).
-
Design For Six Sigma (DFSS). (2002). " Six-sigma case of the Steelcase Co.. " 〈 http://www.dfss.co.kr/2002_dfss/index.asp 〉.
-
(2002)
Six-sigma Case of the Steelcase Co
-
-
-
12
-
-
23044488934
-
Role of inventory buffers in construction labor performance
-
Horman, M. J., and Thomas, H. R. (2005). " Role of inventory buffers in construction labor performance.. " J. Constr. Eng. Manage., 131 (7), 834-843.
-
(2005)
J. Constr. Eng. Manage.
, vol.131
, Issue.7
, pp. 834-843
-
-
Horman, M.J.1
Thomas, H.R.2
-
14
-
-
37249012222
-
Lean production theory: Moving beyond can-do
-
Santiago, Chile.
-
Howell, G., and Ballard, G. (1994). " Lean production theory: Moving beyond can-do.. " Proc., 2nd Annual Conf. of the Int. Group of Lean Construction, Santiago, Chile,.
-
(1994)
Proc., 2nd Annual Conf. of the Int. Group of Lean Construction
-
-
Howell, G.1
Ballard, G.2
-
15
-
-
37248999221
-
Capacity utilization and wait time: A premier for construction
-
Santiago, Chile.
-
Howell, G., Ballard, G., and Hall, J. (2001). " Capacity utilization and wait time: A premier for construction.. " Proc., 9th Annual Conf. of the Int. Group of Lean Construction, Santiago, Chile,.
-
(2001)
Proc., 9th Annual Conf. of the Int. Group of Lean Construction
-
-
Howell, G.1
Ballard, G.2
Hall, J.3
-
17
-
-
37249086508
-
Six sigma and lean manufacturing-A merger for world-class performance, but is it really talking place?
-
Kroslid, D. (2002). " Six sigma and lean manufacturing-A merger for world-class performance, but is it really talking place? " Asian J. Quality, 2 (1), 87-104.
-
(2002)
Asian J. Quality
, vol.2
, Issue.1
, pp. 87-104
-
-
Kroslid, D.1
-
18
-
-
0037359278
-
Six sigma: A goal-theoretic perspective
-
Lindermann, K., Schroeder, R. G., Zaheer, S., and Choo, A. S. (2003). " Six sigma: A goal-theoretic perspective.. " J. Operations Manage., 21, 193-203.
-
(2003)
J. Operations Manage.
, vol.21
, pp. 193-203
-
-
Lindermann, K.1
Schroeder, R.G.2
Zaheer, S.3
Choo, A.S.4
-
19
-
-
0035509405
-
Just-in-time management of precast concrete components
-
Pheng, L. S., and Chuan, C. J. (2001). " Just-in-time management of precast concrete components.. " J. Constr. Eng. Manage., 127 (6), 494-501.
-
(2001)
J. Constr. Eng. Manage.
, vol.127
, Issue.6
, pp. 494-501
-
-
Pheng, L.S.1
Chuan, C.J.2
-
20
-
-
37249000222
-
A study of the relationship between buffers and performance in construction
-
Gramado, Brazil.
-
Sakamoto, M., Horman, M. J., and Thomas, H. R. (2002). " A study of the relationship between buffers and performance in construction.. " Proc., 10th Annual Conf. of the Int. Group of Lean Construction, Gramado, Brazil,.
-
(2002)
Proc., 10th Annual Conf. of the Int. Group of Lean Construction
-
-
Sakamoto, M.1
Horman, M.J.2
Thomas, H.R.3
-
21
-
-
12344327099
-
Improving labor flow reliability for better productivity as lean construction principle
-
Thomas, H. R., Horman, M. J., Minchin, E., and Chen, D. (2003). " Improving labor flow reliability for better productivity as lean construction principle.. " J. Constr. Eng. Manage., 129 (3), 251-261.
-
(2003)
J. Constr. Eng. Manage.
, vol.129
, Issue.3
, pp. 251-261
-
-
Thomas, H.R.1
Horman, M.J.2
Minchin, E.3
Chen, D.4
-
22
-
-
13944264322
-
Reducing variability to improve performance as a lean construction principle
-
Thomas, H. R., Horman, M. J., Souze, U. E., and Zavrski, I. (2002). " Reducing variability to improve performance as a lean construction principle.. " J. Constr. Eng. Manage., 128 (2), 144-154.
-
(2002)
J. Constr. Eng. Manage.
, vol.128
, Issue.2
, pp. 144-154
-
-
Thomas, H.R.1
Horman, M.J.2
Souze, U.E.3
Zavrski, I.4
-
23
-
-
2342419514
-
Impact of variability and uncertainty on product and process development
-
ASCE, Reston, Va.
-
Tommelein, I. D. (2000). " Impact of variability and uncertainty on product and process development.. " Proc., 6th Construction Congress, ASCE, Reston, Va., 969-976.
-
(2000)
Proc., 6th Construction Congress
, pp. 969-976
-
-
Tommelein, I.D.1
|