메뉴 건너뛰기




Volumn 16, Issue 3, 2010, Pages 418-427

An integrated framework for reducing precast fabrication inventory

Author keywords

Demand variability; Inventory; Precast fabrication; Scheduling

Indexed keywords

BUSINESS SUCCESS; DEMAND VARIABILITY; DESIGN INFORMATION; DUE DATES; FINISHED GOODS; INTEGRATED FRAMEWORKS; INVENTORY; MULTI OBJECTIVE; PRE-CAST; PRODUCTION CURVE; PRODUCTION RESOURCES; PRODUCTION SEQUENCES; THREE COMPONENT; TIME BUFFERS;

EID: 77958062633     PISSN: 13923730     EISSN: 18223605     Source Type: Journal    
DOI: 10.3846/jcem.2010.48     Document Type: Article
Times cited : (32)

References (40)
  • 1
    • 17544390830 scopus 로고    scopus 로고
    • Incorporating fuzzy approaches for production planning in complex industrial environments: The roll shop case
    • doi:10.1016/j.engappai.2003.11.008
    • Adenso-Diaz, B.; Gonzalez, I; Tuya, J. 2004. Incorporating fuzzy approaches for production planning in complex industrial environments: The roll shop case, Engineering Applications of Artificial Intelligence 17(1): 73-81. doi:10.1016/j.engappai.2003.11.008
    • (2004) Engineering Applications of Artificial Intelligence , vol.17 , Issue.1 , pp. 73-81
    • Adenso-Diaz, B.1    Gonzalez, I.2    Tuya, J.3
  • 3
    • 13944259031 scopus 로고    scopus 로고
    • Flowshop scheduling model for bespoke precast concrete production planning
    • DOI 10.1080/0144619042000287732
    • Benjaoran, V.; Dawood, N.; Hobbs, B. 2005. Flowshop scheduling model for bespokeprecast concrete production planning, Journal of Construction Management and Economics 23: 93-105. doi:10.1080/0144619042000287732 (Pubitemid 40273715)
    • (2005) Construction Management and Economics , vol.23 , Issue.1 , pp. 93-105
    • Benjaoran, V.1    Dawood, N.2    Hobbs, B.3
  • 5
    • 33751074921 scopus 로고    scopus 로고
    • Example of a hybrid life-cycle assessment of construction processes
    • DOI 10.1061/(ASCE)1076-0342(2006)12:4(207)
    • Bilec, M.; Ries, R.; Matthews, S.; Sharrard, A. L. 2006. Example of a hybrid life-cycle assessment of construction processes, Journal of Infrastructure System 12(4): 207-215. doi:10.1061/(ASCE)1076-0342(2006)12:4(207) (Pubitemid 44768335)
    • (2006) Journal of Infrastructure Systems , vol.12 , Issue.4 , pp. 207-215
    • Bilec, M.1    Ries, R.2    Matthews, H.S.3    Sharrard, A.L.4
  • 6
    • 0022679539 scopus 로고    scopus 로고
    • An analytical solution to the design of precast concrete pave ents
    • doi:10.1002/nag.1610100202
    • Bull, J. W. 2009. An analytical solution to the design of precast concrete pave ents, International Journal for Numerical and Analytical Methods in Geomechanics 10(2): 115-123. doi:10.1002/nag.1610100202
    • (2009) International Journal for Numerical and Analytical Methods in Geomechanics , vol.10 , Issue.2 , pp. 115-123
    • Bull, J.W.1
  • 7
    • 13944279904 scopus 로고    scopus 로고
    • Constraint programming approach to precast production scheduling
    • DOI 10.1061/(ASCE)0733-9364(2002)128:6(513)
    • Chan, W. T.; Hu, H. 2002. Constraint programming approach to precast production scheduling, Journal of Construction Engineering and Management 128: 513-521. doi:10.1061/(ASCE)0733-9364(2002)128:6(513) (Pubitemid 40265515)
    • (2002) Journal of Construction Engineering and Management , vol.128 , Issue.6 , pp. 513-521
    • Chan, W.T.1    Hu, H.2
  • 8
    • 0032592055 scopus 로고    scopus 로고
    • Fuzzy production inventory for fuzzy product quantity with triangular fuzzy number
    • doi:10.1016/S0165-0114(97)00350-3
    • Chang, S. C. 1999. Fuzzy production inventory for fuzzy product quantity with triangular fuzzy number, Fuzzy Sets and Systems 107(1): 37-57. doi:10.1016/S0165-0114(97)00350-3
    • (1999) Fuzzy Sets and Systems , vol.107 , Issue.1 , pp. 37-57
    • Chang, S.C.1
  • 10
    • 77958073217 scopus 로고
    • Knowledge elicitation and dynamic scheduling using a simulation model: An application to the precast manufacturing process
    • Edinburgh, United Kingdom
    • Dawood, N. N. 1993. Knowledge elicitation and dynamic scheduling using a simulation model: An application to the precast manufacturing process, in Proceedings of the Civil-Comp93. Part 4: Knowledge Based Systems for Civil and Structural Engineering, Edinburgh, United Kingdom, 73.
    • (1993) Proceedings of the Civil-comp93. Part 4 Knowledge Based Systems for Civil and Structural Engineering , pp. 73
    • Dawood, N.N.1
  • 11
    • 0027147695 scopus 로고
    • Capacity planning model for precast concrete building products
    • DOI 10.1016/0360-1323(93)90009-R
    • Dawood, N. N.; Neale, R. H. 1993. Capacity planning model for precast concrete building products, Building and Environment 28: 81-95. doi:10.1016/0360-1323(93)90009-R (Pubitemid 23619688)
    • (1993) Building and Environment , vol.28 , Issue.1 , pp. 81-95
    • Dawood, N.N.1    Neale, R.H.2
  • 12
    • 0030100995 scopus 로고    scopus 로고
    • A simulation model for eliciting scheduling knowledge: An application to the precast manufacturing process
    • doi:10.1016/0965-9978(95)00096-8
    • Dawood, N. N. 1996. A simulation model for eliciting scheduling knowledge: An application to the precast manufacturing process, Journal of Advances in Engineering Software 25: 215-22. doi:10.1016/0965-9978(95)00096-8
    • (1996) Journal of Advances in Engineering Software , vol.25 , pp. 215-22
    • Dawood, N.N.1
  • 13
    • 33750268081 scopus 로고    scopus 로고
    • A survey on analysis and design of model-based fuzzy control systems
    • DOI 10.1109/TFUZZ.2006.883415
    • Feng, G. 2006. A survey on analysis and design of model-based fuzzy control, IEEE Transactions on Fuzzy Systems 14(5): 676-697. doi:10.1109/TFUZZ. 2006.883415 (Pubitemid 44607782)
    • (2006) IEEE Transactions on Fuzzy Systems , vol.14 , Issue.5 , pp. 676-697
    • Feng, G.1
  • 17
    • 0036564570 scopus 로고    scopus 로고
    • Fuzzy operator allocation for balance control of assembly lines in apparel manufacturing
    • DOI 10.1109/TEM.2002.1010885, PII S0018939102051280
    • Hui, P. C. L.; Chan, K. C. C.; Yeung, K. W.; Ng, F. S. F. 2002. Fuzzy operator allocation for balance control of assembly lines in apparel manufacturing, IEEE Transactions on Engineering Management 49(2): 173-180. doi:10.1109/TEM.2002.1010885 (Pubitemid 34801909)
    • (2002) IEEE Transactions on Engineering Management , vol.49 , Issue.2 , pp. 173-180
    • Hui, P.C.-L.1    Chan, K.C.C.2    Yeung, K.W.3    Ng, F.S.-F.4
  • 18
    • 0032141635 scopus 로고    scopus 로고
    • Multi-objective genetic local search algorithm and its applications to flowshop scheduling
    • Ishibuchi, H.; Murata, H. 1998 Multi-objective genetic local search algorithm and its applications to flowshop scheduling, IEEE Transactions on SMC 28: 392-W3.
    • (1998) IEEE Transactions on SMC , vol.28
    • Ishibuchi, H.1    Murata, H.2
  • 19
    • 1642382677 scopus 로고    scopus 로고
    • The role of inventories in the business cycle
    • doi:10.1109/EMR.2003.24938
    • Khan, A. 2003. The role of inventories in the business cycle, IEEE Engineering Management Review 31(4): 38-16. doi:10.1109/EMR.2003.24938
    • (2003) IEEE Engineering Management Review , vol.31 , Issue.4 , pp. 38-16
    • Khan, A.1
  • 21
    • 27644542153 scopus 로고    scopus 로고
    • Fabrication lead time and demand variability: An empirical study
    • American Society of Civil Engineers, San Diego, CA
    • Ko, C. H.; Ballard, G. 2005. Fabrication lead time and demand variability: An empirical study, in Proceedings of the Construction Research Congress, American Society of Civil Engineers, San Diego, CA: 17-21.
    • (2005) Proceedings of the Construction Research Congress , pp. 17-21
    • Ko, C.H.1    Ballard, G.2
  • 22
    • 33947408281 scopus 로고    scopus 로고
    • Dynamic prediction of project success using artificial intelligence
    • DOI 10.1061/(ASCE)0733-9364(2007)133:4(316)
    • Ko, C. H.; Cheng, M. Y. 2007. Dynamic prediction of project success using artificial intelligence, Journal of Construction Engineering and Management 133(4): 316-324. doi:10.1061/(ASCE)0733-9364(2007)133:4(316) (Pubitemid 46447967)
    • (2007) Journal of Construction Engineering and Management , vol.133 , Issue.4 , pp. 316-324
    • Ko, C.-H.1    Cheng, M.-Y.2
  • 23
    • 0035391119 scopus 로고    scopus 로고
    • Optimal repetitive scheduling model with shareable resource constraint
    • DOI 10.1061/(ASCE)0733-9364(2001)127:4(270), Reportnr 22221
    • Leu, S. S.; Hwang, S. T. 2001. Optimal repetitive scheduling model with shareable resource constraint, Journal of Construction Engineering and Management 127: 270-280. doi:10.1061/(ASCE)0733-9364(2001)127:4(270) (Pubitemid 32715357)
    • (2001) Journal of Construction Engineering and Management , vol.127 , Issue.4 , pp. 270-280
    • Leu, S.-S.1    Hwang, S.-T.2
  • 24
    • 0036605006 scopus 로고    scopus 로고
    • GA-based resource-constrained flow-shop scheduling model for mixed precast production
    • DOI 10.1016/S0926-5805(01)00083-8, PII S0926580501000838
    • Leu, S. S.; Hwang, S. T. 2002. GA-based resource-constrained flow-shop scheduling model for mixed precast production, Automation in Construction 11: 439-452. doi:10.1016/S0926-5805(01)00083-8 (Pubitemid 34435112)
    • (2002) Automation in Construction , vol.11 , Issue.4 , pp. 439-452
    • Leu, S.-S.1    Hwang, S.-T.2
  • 25
    • 0016451032 scopus 로고
    • An experiment in linguistic synthesis with a fuzzy logic controller
    • doi:10.1016/S0020-7373(75)80002-2
    • Mamdani, E. H.; Assilian, S. 1975. An experiment in linguistic synthesis with a fuzzy logic controller, International Journal of Man-Machine Studies 7(1): 1-13. doi:10.1016/S0020-7373(75)80002-2
    • (1975) International Journal of Man-machine Studies , vol.7 , Issue.1 , pp. 1-13
    • Mamdani, E.H.1    Assilian, S.2
  • 26
    • 62549089323 scopus 로고    scopus 로고
    • A multi-objective strategy in genetic algorithms for gene selection of gene expression data
    • doi:10.1007/s10015-008-0533-5
    • Mohamad, M. S.; Omatu, S.; Deris, S.; Misman, M. F.; Yoshioka, M. 2009. A multi-objective strategy in genetic algorithms for gene selection of gene expression data, Artificial Life and Robotics 13(2): 410-413. doi:10.1007/s10015-008-0533-5
    • (2009) Artificial Life and Robotics , vol.13 , Issue.2 , pp. 410-413
    • Mohamad, M.S.1    Omatu, S.2    Deris, S.3    Misman, M.F.4    Yoshioka, M.5
  • 29
    • 0035509405 scopus 로고    scopus 로고
    • Just-in-time management of precast concrete components
    • DOI 10.1061/(ASCE)0733-9364(2001)127:6(494), Reportnr 22217
    • Low, S. P.; Choong, J. C. 2001. Just-in-time management of precast concrete components, Journal of Construction Engineering and Management 127(6): 494-501. doi:10.1061/(ASCE)0733-9364(2001)127:6(494) (Pubitemid 33137754)
    • (2001) Journal of Construction Engineering and Management , vol.127 , Issue.6 , pp. 494-501
    • Pheng, L.S.1    Chuan, C.J.2
  • 31
    • 73349113523 scopus 로고    scopus 로고
    • Contractor prequalification model using fuzzy sets
    • doi:10.3846/1392-3730.2009.15.377-385
    • Plebankiewicz, E. 2009. Contractor prequalification model using fuzzy sets, Journal of Civil Engineering and Management 15(4): 377-385. doi:10.3846/1392-3730.2009.15.377-385
    • (2009) Journal of Civil Engineering and Management , vol.15 , Issue.4 , pp. 377-385
    • Plebankiewicz, E.1
  • 32
    • 77950272967 scopus 로고    scopus 로고
    • Precast concrete systems in developing vs. industrialized countries
    • doi:10.3846/jcem.2010.08
    • Polat, G. 2010. Precast concrete systems in developing vs. industrialized countries, Journal of Civil Engineering and Management 16(1): 85-94. doi:10.3846/jcem.2010.08
    • (2010) Journal of Civil Engineering and Management , vol.16 , Issue.1 , pp. 85-94
    • Polat, G.1
  • 33
    • 0026819601 scopus 로고
    • A decoupling inventory model and an application
    • doi:10.1109/17.119664
    • Pulat, B. M.; Pulat, P. S. 1992. A decoupling inventory model and an application, IEEE Transactions on Engineering Management 39(1): 73-76. doi:10.1109/17.119664
    • (1992) IEEE Transactions on Engineering Management , vol.39 , Issue.1 , pp. 73-76
    • Pulat, B.M.1    Pulat, P.S.2
  • 34
    • 24944465750 scopus 로고    scopus 로고
    • Effects of delivery systems on change order size and frequency in mechanical construction
    • DOI 10.1061/(ASCE)0733-9364(2005)131:9(953)
    • Riley, D. R.; Diller, B. E.; Kerr, D. 2005. Effects of delivery systems on change order size and frequency in mechanical construction, Journal of Construction Engineering and Management 131(9): 953-962. doi:10.1061/(ASCE)0733- 9364(2005)131:9(953) (Pubitemid 41312261)
    • (2005) Journal of Construction Engineering and Management , vol.131 , Issue.9 , pp. 953-962
    • Riley, D.R.1    Diller, B.E.2    Kerr, D.3
  • 36
    • 77950249932 scopus 로고    scopus 로고
    • Global optimization of grillages using simulated annealing and high performance computing
    • doi:10.3846/jcem.2010.09
    • Šešok, D.; Mockus, J.; Belevičius, R.; Kačianiauskas, A. 2010. Global optimization of grillages using simulated annealing and high performance computing, Journal of Civil Engineering and Management 16(1): 95-101. doi:10.3846/jcem.2010.09
    • (2010) Journal of Civil Engineering and Management , vol.16 , Issue.1 , pp. 95-101
    • Šešok, D.1    Mockus, J.2    Belevičius, R.3    Kačianiauskas, A.4
  • 37
    • 77958075124 scopus 로고    scopus 로고
    • To pull or not to pull. what is the question? Part ii: Making lean work in your plant
    • Factory Physics. Inc.
    • Spearman, M. L. 2002. To pull or not to pull. what is the question? Part ii: making lean work in your plant, White Paper Series, Factory Physics. Inc.: 1-7.
    • (2002) White Paper Series , pp. 1-7
    • Spearman, M.L.1
  • 39
    • 0032254705 scopus 로고    scopus 로고
    • Use of simulation for construction elements manufacturing
    • Washington DC, USA
    • Vern, K.; Gunal, A. 1998. Use of simulation for construction elements manufacturing, in Proceedings of the Winter Simulation Conference. Washington DC, USA: 1273-1277.
    • (1998) Proceedings of the Winter Simulation Conference , pp. 1273-1277
    • Vern, K.1    Gunal, A.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.