Incorporating fuzzy approaches for production planning in complex industrial environments: The roll shop case
-
doi:10.1016/j.engappai.2003.11.008
-
Adenso-Diaz, B.; Gonzalez, I; Tuya, J. 2004. Incorporating fuzzy approaches for production planning in complex industrial environments: The roll shop case, Engineering Applications of Artificial Intelligence 17(1): 73-81. doi:10.1016/j.engappai.2003.11.008
-
(2004)
Engineering Applications of Artificial Intelligence
, vol.17
, Issue.1
, pp. 73-81
-
-
Adenso-Diaz, B.1
Gonzalez, I.2
Tuya, J.3
-
2
-
-
27644586081
-
Taking prefabrication lean
-
Elsinore, Denmark
-
Ballard, G.; Arbulu, R. 2004. Taking prefabrication lean, in Proceedings of the 12th annual conference of the International Group for Lean Construction, Elsinore, Denmark, 629-642.
-
(2004)
Proceedings of the 12th Annual Conference of the International Group for Lean Construction
, pp. 629-642
-
-
Ballard, G.1
Arbulu, R.2
-
3
-
-
13944259031
-
Flowshop scheduling model for bespoke precast concrete production planning
-
DOI 10.1080/0144619042000287732
-
Benjaoran, V.; Dawood, N.; Hobbs, B. 2005. Flowshop scheduling model for bespokeprecast concrete production planning, Journal of Construction Management and Economics 23: 93-105. doi:10.1080/0144619042000287732 (Pubitemid 40273715)
-
(2005)
Construction Management and Economics
, vol.23
, Issue.1
, pp. 93-105
-
-
Benjaoran, V.1
Dawood, N.2
Hobbs, B.3
-
5
-
-
33751074921
-
Example of a hybrid life-cycle assessment of construction processes
-
DOI 10.1061/(ASCE)1076-0342(2006)12:4(207)
-
Bilec, M.; Ries, R.; Matthews, S.; Sharrard, A. L. 2006. Example of a hybrid life-cycle assessment of construction processes, Journal of Infrastructure System 12(4): 207-215. doi:10.1061/(ASCE)1076-0342(2006)12:4(207) (Pubitemid 44768335)
-
(2006)
Journal of Infrastructure Systems
, vol.12
, Issue.4
, pp. 207-215
-
-
Bilec, M.1
Ries, R.2
Matthews, H.S.3
Sharrard, A.L.4
-
6
-
-
0022679539
-
An analytical solution to the design of precast concrete pave ents
-
doi:10.1002/nag.1610100202
-
Bull, J. W. 2009. An analytical solution to the design of precast concrete pave ents, International Journal for Numerical and Analytical Methods in Geomechanics 10(2): 115-123. doi:10.1002/nag.1610100202
-
(2009)
International Journal for Numerical and Analytical Methods in Geomechanics
, vol.10
, Issue.2
, pp. 115-123
-
-
Bull, J.W.1
-
7
-
-
13944279904
-
Constraint programming approach to precast production scheduling
-
DOI 10.1061/(ASCE)0733-9364(2002)128:6(513)
-
Chan, W. T.; Hu, H. 2002. Constraint programming approach to precast production scheduling, Journal of Construction Engineering and Management 128: 513-521. doi:10.1061/(ASCE)0733-9364(2002)128:6(513) (Pubitemid 40265515)
-
(2002)
Journal of Construction Engineering and Management
, vol.128
, Issue.6
, pp. 513-521
-
-
Chan, W.T.1
Hu, H.2
-
8
-
-
0032592055
-
Fuzzy production inventory for fuzzy product quantity with triangular fuzzy number
-
doi:10.1016/S0165-0114(97)00350-3
-
Chang, S. C. 1999. Fuzzy production inventory for fuzzy product quantity with triangular fuzzy number, Fuzzy Sets and Systems 107(1): 37-57. doi:10.1016/S0165-0114(97)00350-3
-
(1999)
Fuzzy Sets and Systems
, vol.107
, Issue.1
, pp. 37-57
-
-
Chang, S.C.1
-
10
-
-
77958073217
-
Knowledge elicitation and dynamic scheduling using a simulation model: An application to the precast manufacturing process
-
Edinburgh, United Kingdom
-
Dawood, N. N. 1993. Knowledge elicitation and dynamic scheduling using a simulation model: An application to the precast manufacturing process, in Proceedings of the Civil-Comp93. Part 4: Knowledge Based Systems for Civil and Structural Engineering, Edinburgh, United Kingdom, 73.
-
(1993)
Proceedings of the Civil-comp93. Part 4 Knowledge Based Systems for Civil and Structural Engineering
, pp. 73
-
-
Dawood, N.N.1
-
11
-
-
0027147695
-
Capacity planning model for precast concrete building products
-
DOI 10.1016/0360-1323(93)90009-R
-
Dawood, N. N.; Neale, R. H. 1993. Capacity planning model for precast concrete building products, Building and Environment 28: 81-95. doi:10.1016/0360-1323(93)90009-R (Pubitemid 23619688)
-
(1993)
Building and Environment
, vol.28
, Issue.1
, pp. 81-95
-
-
Dawood, N.N.1
Neale, R.H.2
-
12
-
-
0030100995
-
A simulation model for eliciting scheduling knowledge: An application to the precast manufacturing process
-
doi:10.1016/0965-9978(95)00096-8
-
Dawood, N. N. 1996. A simulation model for eliciting scheduling knowledge: An application to the precast manufacturing process, Journal of Advances in Engineering Software 25: 215-22. doi:10.1016/0965-9978(95)00096-8
-
(1996)
Journal of Advances in Engineering Software
, vol.25
, pp. 215-22
-
-
Dawood, N.N.1
-
13
-
-
33750268081
-
A survey on analysis and design of model-based fuzzy control systems
-
DOI 10.1109/TFUZZ.2006.883415
-
Feng, G. 2006. A survey on analysis and design of model-based fuzzy control, IEEE Transactions on Fuzzy Systems 14(5): 676-697. doi:10.1109/TFUZZ. 2006.883415 (Pubitemid 44607782)
-
(2006)
IEEE Transactions on Fuzzy Systems
, vol.14
, Issue.5
, pp. 676-697
-
-
Feng, G.1
-
17
-
-
0036564570
-
Fuzzy operator allocation for balance control of assembly lines in apparel manufacturing
-
DOI 10.1109/TEM.2002.1010885, PII S0018939102051280
-
Hui, P. C. L.; Chan, K. C. C.; Yeung, K. W.; Ng, F. S. F. 2002. Fuzzy operator allocation for balance control of assembly lines in apparel manufacturing, IEEE Transactions on Engineering Management 49(2): 173-180. doi:10.1109/TEM.2002.1010885 (Pubitemid 34801909)
-
(2002)
IEEE Transactions on Engineering Management
, vol.49
, Issue.2
, pp. 173-180
-
-
Hui, P.C.-L.1
Chan, K.C.C.2
Yeung, K.W.3
Ng, F.S.-F.4
-
18
-
-
0032141635
-
Multi-objective genetic local search algorithm and its applications to flowshop scheduling
-
Ishibuchi, H.; Murata, H. 1998 Multi-objective genetic local search algorithm and its applications to flowshop scheduling, IEEE Transactions on SMC 28: 392-W3.
-
(1998)
IEEE Transactions on SMC
, vol.28
-
-
Ishibuchi, H.1
Murata, H.2
-
19
-
-
1642382677
-
The role of inventories in the business cycle
-
doi:10.1109/EMR.2003.24938
-
Khan, A. 2003. The role of inventories in the business cycle, IEEE Engineering Management Review 31(4): 38-16. doi:10.1109/EMR.2003.24938
-
(2003)
IEEE Engineering Management Review
, vol.31
, Issue.4
, pp. 38-16
-
-
Khan, A.1
-
20
-
-
77958043291
-
-
Technical Report, University of California at Berkeley, Berkeley, CA, USA.
-
Ko, C. H.; Ballard, G. 2004. Demand variability and fabrication lead time: Descriptive research phase I. Technical Report, University of California at Berkeley, Berkeley, CA, USA.
-
(2004)
Demand Variability and Fabrication Lead Time Descriptive Research Phase i
-
-
Ko, C.H.1
Ballard, G.2
-
21
-
-
27644542153
-
Fabrication lead time and demand variability: An empirical study
-
American Society of Civil Engineers, San Diego, CA
-
Ko, C. H.; Ballard, G. 2005. Fabrication lead time and demand variability: An empirical study, in Proceedings of the Construction Research Congress, American Society of Civil Engineers, San Diego, CA: 17-21.
-
(2005)
Proceedings of the Construction Research Congress
, pp. 17-21
-
-
Ko, C.H.1
Ballard, G.2
-
22
-
-
33947408281
-
Dynamic prediction of project success using artificial intelligence
-
DOI 10.1061/(ASCE)0733-9364(2007)133:4(316)
-
Ko, C. H.; Cheng, M. Y. 2007. Dynamic prediction of project success using artificial intelligence, Journal of Construction Engineering and Management 133(4): 316-324. doi:10.1061/(ASCE)0733-9364(2007)133:4(316) (Pubitemid 46447967)
-
(2007)
Journal of Construction Engineering and Management
, vol.133
, Issue.4
, pp. 316-324
-
-
Ko, C.-H.1
Cheng, M.-Y.2
-
23
-
-
0035391119
-
Optimal repetitive scheduling model with shareable resource constraint
-
DOI 10.1061/(ASCE)0733-9364(2001)127:4(270), Reportnr 22221
-
Leu, S. S.; Hwang, S. T. 2001. Optimal repetitive scheduling model with shareable resource constraint, Journal of Construction Engineering and Management 127: 270-280. doi:10.1061/(ASCE)0733-9364(2001)127:4(270) (Pubitemid 32715357)
-
(2001)
Journal of Construction Engineering and Management
, vol.127
, Issue.4
, pp. 270-280
-
-
Leu, S.-S.1
Hwang, S.-T.2
-
24
-
-
0036605006
-
GA-based resource-constrained flow-shop scheduling model for mixed precast production
-
DOI 10.1016/S0926-5805(01)00083-8, PII S0926580501000838
-
Leu, S. S.; Hwang, S. T. 2002. GA-based resource-constrained flow-shop scheduling model for mixed precast production, Automation in Construction 11: 439-452. doi:10.1016/S0926-5805(01)00083-8 (Pubitemid 34435112)
-
(2002)
Automation in Construction
, vol.11
, Issue.4
, pp. 439-452
-
-
Leu, S.-S.1
Hwang, S.-T.2
-
25
-
-
0016451032
-
An experiment in linguistic synthesis with a fuzzy logic controller
-
doi:10.1016/S0020-7373(75)80002-2
-
Mamdani, E. H.; Assilian, S. 1975. An experiment in linguistic synthesis with a fuzzy logic controller, International Journal of Man-Machine Studies 7(1): 1-13. doi:10.1016/S0020-7373(75)80002-2
-
(1975)
International Journal of Man-machine Studies
, vol.7
, Issue.1
, pp. 1-13
-
-
Mamdani, E.H.1
Assilian, S.2
-
26
-
-
62549089323
-
A multi-objective strategy in genetic algorithms for gene selection of gene expression data
-
doi:10.1007/s10015-008-0533-5
-
Mohamad, M. S.; Omatu, S.; Deris, S.; Misman, M. F.; Yoshioka, M. 2009. A multi-objective strategy in genetic algorithms for gene selection of gene expression data, Artificial Life and Robotics 13(2): 410-413. doi:10.1007/s10015-008-0533-5
-
(2009)
Artificial Life and Robotics
, vol.13
, Issue.2
, pp. 410-413
-
-
Mohamad, M.S.1
Omatu, S.2
Deris, S.3
Misman, M.F.4
Yoshioka, M.5
-
29
-
-
0035509405
-
Just-in-time management of precast concrete components
-
DOI 10.1061/(ASCE)0733-9364(2001)127:6(494), Reportnr 22217
-
Low, S. P.; Choong, J. C. 2001. Just-in-time management of precast concrete components, Journal of Construction Engineering and Management 127(6): 494-501. doi:10.1061/(ASCE)0733-9364(2001)127:6(494) (Pubitemid 33137754)
-
(2001)
Journal of Construction Engineering and Management
, vol.127
, Issue.6
, pp. 494-501
-
-
Pheng, L.S.1
Chuan, C.J.2
-
31
-
-
73349113523
-
Contractor prequalification model using fuzzy sets
-
doi:10.3846/1392-3730.2009.15.377-385
-
Plebankiewicz, E. 2009. Contractor prequalification model using fuzzy sets, Journal of Civil Engineering and Management 15(4): 377-385. doi:10.3846/1392-3730.2009.15.377-385
-
(2009)
Journal of Civil Engineering and Management
, vol.15
, Issue.4
, pp. 377-385
-
-
Plebankiewicz, E.1
-
32
-
-
77950272967
-
Precast concrete systems in developing vs. industrialized countries
-
doi:10.3846/jcem.2010.08
-
Polat, G. 2010. Precast concrete systems in developing vs. industrialized countries, Journal of Civil Engineering and Management 16(1): 85-94. doi:10.3846/jcem.2010.08
-
(2010)
Journal of Civil Engineering and Management
, vol.16
, Issue.1
, pp. 85-94
-
-
Polat, G.1
-
33
-
-
0026819601
-
A decoupling inventory model and an application
-
doi:10.1109/17.119664
-
Pulat, B. M.; Pulat, P. S. 1992. A decoupling inventory model and an application, IEEE Transactions on Engineering Management 39(1): 73-76. doi:10.1109/17.119664
-
(1992)
IEEE Transactions on Engineering Management
, vol.39
, Issue.1
, pp. 73-76
-
-
Pulat, B.M.1
Pulat, P.S.2
-
34
-
-
24944465750
-
Effects of delivery systems on change order size and frequency in mechanical construction
-
DOI 10.1061/(ASCE)0733-9364(2005)131:9(953)
-
Riley, D. R.; Diller, B. E.; Kerr, D. 2005. Effects of delivery systems on change order size and frequency in mechanical construction, Journal of Construction Engineering and Management 131(9): 953-962. doi:10.1061/(ASCE)0733- 9364(2005)131:9(953) (Pubitemid 41312261)
-
(2005)
Journal of Construction Engineering and Management
, vol.131
, Issue.9
, pp. 953-962
-
-
Riley, D.R.1
Diller, B.E.2
Kerr, D.3
-
36
-
-
77950249932
-
Global optimization of grillages using simulated annealing and high performance computing
-
doi:10.3846/jcem.2010.09
-
Šešok, D.; Mockus, J.; Belevičius, R.; Kačianiauskas, A. 2010. Global optimization of grillages using simulated annealing and high performance computing, Journal of Civil Engineering and Management 16(1): 95-101. doi:10.3846/jcem.2010.09
-
(2010)
Journal of Civil Engineering and Management
, vol.16
, Issue.1
, pp. 95-101
-
-
Šešok, D.1
Mockus, J.2
Belevičius, R.3
Kačianiauskas, A.4
-
37
-
-
77958075124
-
To pull or not to pull. what is the question? Part ii: Making lean work in your plant
-
Factory Physics. Inc.
-
Spearman, M. L. 2002. To pull or not to pull. what is the question? Part ii: making lean work in your plant, White Paper Series, Factory Physics. Inc.: 1-7.
-
(2002)
White Paper Series
, pp. 1-7
-
-
Spearman, M.L.1
-
39
-
-
0032254705
-
Use of simulation for construction elements manufacturing
-
Washington DC, USA
-
Vern, K.; Gunal, A. 1998. Use of simulation for construction elements manufacturing, in Proceedings of the Winter Simulation Conference. Washington DC, USA: 1273-1277.
-
(1998)
Proceedings of the Winter Simulation Conference
, pp. 1273-1277
-
-
Vern, K.1
Gunal, A.2
|