메뉴 건너뛰기




Volumn , Issue 1575, 1997, Pages 42-46

RoboCrane construction of bridges

Author keywords

[No Author keywords available]

Indexed keywords


EID: 3743120622     PISSN: 03611981     EISSN: None     Source Type: Journal    
DOI: 10.3141/1575-06     Document Type: Article
Times cited : (4)

References (8)
  • 1
    • 3743137899 scopus 로고
    • A Robotic Crane System Utilizing the Stewart Platform Configuration
    • Santa Fe, N. M., Nov. 10-12
    • Bostelman, R. V., J. S. Albus, N. G. Dagalakis. A Robotic Crane System Utilizing the Stewart Platform Configuration. Proc., ISRAM 1992 Conference, Santa Fe, N. M., Nov. 10-12, 1992.
    • (1992) Proc., ISRAM 1992 Conference
    • Bostelman, R.V.1    Albus, J.S.2    Dagalakis, N.G.3
  • 4
    • 85173180493 scopus 로고    scopus 로고
    • Construation of Large Stractures By Robotic Crane Placement of Modular Bridge Sections. U.S. Patent 5,511,268
    • Albus, J. S., K. Goodwin, Y. Tene. Construation of Large Stractures By Robotic Crane Placement of Modular Bridge Sections. U.S. Patent 5,511,268.
    • Albus, J.S.1    Goodwin, K.2    Tene, Y.3
  • 5
    • 0003498981 scopus 로고
    • 1992, as amended by the Interim Specifications - Bridges
    • American Assoication of State Highway and Transportation Officials (AASHTO). Standard Specifications for Highway Bridges, 15th ed., 1992, as amended by the Interim Specifications - Bridges - 1993.
    • (1993) Standard Specifications for Highway Bridges, 15th Ed.
  • 8
    • 84889212514 scopus 로고    scopus 로고
    • CERF Report: HITEC 96-01, Product 04. Highway Innovative Technology Evalution Center, March
    • Evaluation Findings: The Segemental Concrete Channel Bridge System. CERF Report: HITEC 96-01, Product 04. Highway Innovative Technology Evalution Center, March 1996.
    • (1996) Evaluation Findings: The Segemental Concrete Channel Bridge System


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.