메뉴 건너뛰기




Volumn 7, Issue 4, 1998, Pages 285-298

Automation of existing tower cranes: Economic and technological feasibility

Author keywords

Automation; Construction; Economic analysis; Productivity; Tower cranes

Indexed keywords

AUTOMATION; COST EFFECTIVENESS; MANEUVERABILITY; MOTION CONTROL; RETROFITTING;

EID: 0032070691     PISSN: 09265805     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0926-5805(98)00049-1     Document Type: Article
Times cited : (39)

References (34)
  • 1
    • 0040291476 scopus 로고    scopus 로고
    • Classified advertising
    • Feb.
    • Classified advertising, Cranes Today, Feb. 1997, pp. 38-48.
    • (1997) Cranes Today , pp. 38-48
  • 2
    • 0040291477 scopus 로고    scopus 로고
    • The three 'R's' of the crane business
    • June
    • The three 'R's' of the crane business, Cranes Today, June, 1996, pp. 31-37.
    • (1996) Cranes Today , pp. 31-37
  • 3
    • 0040885759 scopus 로고    scopus 로고
    • Towers take control
    • Feb.
    • Towers take control, Cranes Today, Feb. 1997, pp. 25-31.
    • (1997) Cranes Today , pp. 25-31
  • 4
    • 0028430452 scopus 로고
    • A distributed control architecture for intelligent crane automation
    • Armstrong N.A., Moore P.R. A distributed control architecture for intelligent crane automation. Automation in Construction. 3(1):1994;45-53.
    • (1994) Automation in Construction , vol.3 , Issue.1 , pp. 45-53
    • Armstrong, N.A.1    Moore, P.R.2
  • 10
    • 0039107477 scopus 로고
    • 40 years of Liebherr tower cranes
    • Germany
    • Liebherr, 40 years of Liebherr tower cranes, Catalogue 356/09.89, Germany, 1989.
    • (1989) Catalogue 356/09.89
    • Liebherr1
  • 11
    • 0020850113 scopus 로고
    • Tower cranes: A future full of optimism
    • London, Nov.
    • Tower cranes: a future full of optimism, Civil Engineering, London, Nov. 1983, pp. 20-24.
    • (1983) Civil Engineering , pp. 20-24
  • 13
    • 0001101914 scopus 로고
    • Innovative construction methods
    • Rosenfeld Y. Innovative construction methods. Construction Manage. Econ. 12(6):1994;521-541.
    • (1994) Construction Manage. Econ. , vol.12 , Issue.6 , pp. 521-541
    • Rosenfeld, Y.1
  • 14
    • 0026837612 scopus 로고
    • Using quality circles to raise site productivity and quality of work life
    • Rosenfeld Y., Warszawski A., Laufer A. Using quality circles to raise site productivity and quality of work life. J. Construction Eng. Manage., ASCE. 108(1):1992;17-33.
    • (1992) J. Construction Eng. Manage., ASCE , vol.108 , Issue.1 , pp. 17-33
    • Rosenfeld, Y.1    Warszawski, A.2    Laufer, A.3
  • 15
    • 0005736484 scopus 로고    scopus 로고
    • Culture of using mobile cranes for building construction
    • Shapira A., Glascock J.D. Culture of using mobile cranes for building construction. J. Construction Eng. Manage., ASCE. 122(4):1996;298-307.
    • (1996) J. Construction Eng. Manage., ASCE , vol.122 , Issue.4 , pp. 298-307
    • Shapira, A.1    Glascock, J.D.2
  • 16
    • 38449105609 scopus 로고
    • Strategies for Fostering Enabling Technologies
    • San Diego, CA
    • J.D. Lutz, Strategies for Fostering Enabling Technologies, Proc. 1995 Construction Congress, San Diego, CA, 1995, pp. 573-580.
    • (1995) Proc. 1995 Construction Congress , pp. 573-580
    • Lutz, J.D.1
  • 20
    • 0029323168 scopus 로고
    • Automation of existing cranes: From concept to prototype
    • Rosenfeld Y. Automation of existing cranes: from concept to prototype. Automation in Construction. 4(2):1995;125-138.
    • (1995) Automation in Construction , vol.4 , Issue.2 , pp. 125-138
    • Rosenfeld, Y.1
  • 22
    • 33845623148 scopus 로고    scopus 로고
    • Space-age control
    • June
    • Space-age control, Cranes Today, June, 1996, pp. 27-31.
    • (1996) Cranes Today , pp. 27-31
  • 23
    • 0039107478 scopus 로고    scopus 로고
    • Wireless wonders
    • June
    • Wireless wonders, Cranes Today, June, 1997, pp. 31-37.
    • (1997) Cranes Today , pp. 31-37
  • 24
    • 0027556933 scopus 로고
    • CRANIUM: Device for improving crane productivity and safety
    • Everett J.G., Slocum A.H. CRANIUM: device for improving crane productivity and safety. J. Construction Eng. Manage., ASCE. 119(1):1993;23-39.
    • (1993) J. Construction Eng. Manage., ASCE , vol.119 , Issue.1 , pp. 23-39
    • Everett, J.G.1    Slocum, A.H.2
  • 25
    • 0040885755 scopus 로고
    • The Litronic Crane Control System
    • Germany
    • Liebherr, The Litronic Crane Control System, Catalogue LBC-383-B-3/92, Germany, 1992.
    • (1992) Catalogue LBC-383-B-3/92
    • Liebherr1
  • 26
    • 0040291474 scopus 로고
    • Potain, 'Matic' function
    • France
    • Potain, 'Matic' function, Catalogue 1992.14.LEWI, France, 1992.
    • (1992) Catalogue 1992.14.LEWI
  • 28
    • 0040885757 scopus 로고
    • Productivity: The unending question
    • March
    • Productivity: the unending question, Cranes Today, March 1986, pp. 60-62.
    • (1986) Cranes Today , pp. 60-62
  • 33
    • 0030172881 scopus 로고    scopus 로고
    • Renting, leasing, or owning construction equipment
    • Dyment R. Renting, leasing, or owning construction equipment. Concrete Construction. 41(6):1996;499-503.
    • (1996) Concrete Construction , vol.41 , Issue.6 , pp. 499-503
    • Dyment, R.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.