메뉴 건너뛰기




Volumn 50, Issue 6, 2012, Pages 1457-1475

Hybrid flowshop scheduling with family setup time and inconsistent family formation

Author keywords

family setup time; hybrid flowshop scheduling; metaheuristic

Indexed keywords

FLOW SHOP PROBLEMS; HYBRID FLOW SHOP SCHEDULING; MACHINE SETTINGS; MAKESPAN; METAHEURISTIC; PRODUCTION PROCESS; SEQUENCE DEPENDENT SETUPS; SET-UP TIME; STANDARD METAL;

EID: 84861407526     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207543.2011.560620     Document Type: Article
Times cited : (16)

References (29)
  • 1
    • 36849082395 scopus 로고    scopus 로고
    • A survey of scheduling problems with setup times or costs
    • Allahverdi, A., et al., 2008. A survey of scheduling problems with setup times or costs. European Journal of Operational Research, 187 (3), 985-1032.
    • (2008) European Journal of Operational Research , vol.187 , Issue.3 , pp. 985-1032
    • Allahverdi, A.1
  • 2
    • 78349280778 scopus 로고    scopus 로고
    • Performance evaluation of dynamic scheduling approaches in vehicle-based internal transport systems
    • Anh, T. le, Koster, R. de, and Yu, Y., 2010. Performance evaluation of dynamic scheduling approaches in vehicle-based internal transport systems. International Journal of Production Research, 48 (24), 7219-7242.
    • (2010) International Journal of Production Research , vol.48 , Issue.24 , pp. 7219-7242
    • Le Anh, T.1    De Koster, R.2    Yu, Y.3
  • 3
    • 74549171517 scopus 로고    scopus 로고
    • Development of a hybrid metaheuristic to minimise earliness and tardiness in a hybrid flowshop with sequence-dependent setup times
    • Behnamian, J., Fatemi Ghomi, S.M.T., and Zandieh, M., 2009. Development of a hybrid metaheuristic to minimise earliness and tardiness in a hybrid flowshop with sequence-dependent setup times. International Journal of Production Research, 48 (5), 1415-1438.
    • (2009) International Journal of Production Research , vol.48 , Issue.5 , pp. 1415-1438
    • Behnamian, J.1    Fatemi Ghomi, S.M.T.2    Zandieh, M.3
  • 5
    • 84861394893 scopus 로고    scopus 로고
    • Genetic algorithms and engineering design
    • New York: Wiley. Glass, C.A., Potts, C.N., and Strusevich, V.A., 2001. Scheduling batches with sequential job processing for two-machine flow and open shops
    • Gen, M. and Cheng, R., 1997. Genetic algorithms and engineering design. New York: Wiley. Glass, C.A., Potts, C.N., and Strusevich, V.A., 2001. Scheduling batches with sequential job processing for two-machine flow and open shops. Informs Journal on Computing, 13 (2), 120-137.
    • (1997) Informs Journal on Computing , vol.13 , Issue.2 , pp. 120-137
    • Gen, M.1    Cheng, R.2
  • 7
    • 36448976915 scopus 로고    scopus 로고
    • Single machine group scheduling with family setups to minimise total tardiness
    • Gupta, J.N.D. and Chantaravarapan, S., 2008. Single machine group scheduling with family setups to minimise total tardiness. International Journal of Production Research, 46 (6), 1707-1722.
    • (2008) International Journal of Production Research , vol.46 , Issue.6 , pp. 1707-1722
    • Gupta, J.N.D.1    Chantaravarapan, S.2
  • 8
    • 31444449761 scopus 로고    scopus 로고
    • Minimising flow time in a flow-line manufacturing cell with family setup times
    • Gupta, J.N.D. and Schaller, J.E., 2006. Minimising flow time in a flow-line manufacturing cell with family setup times. The Journal of the Operational Research Society, 57 (2), 163-176.
    • (2006) The Journal of the Operational Research Society , vol.57 , Issue.2 , pp. 163-176
    • Gupta, J.N.D.1    Schaller, J.E.2
  • 10
    • 0031955940 scopus 로고    scopus 로고
    • A two-stage hybrid flowshop with uniform machines and setup times
    • Huang, W. and Li, S., 1998. A two-stage hybrid flowshop with uniform machines and setup times. Mathematical and Computer Modelling, 27 (2), 27-45.
    • (1998) Mathematical and Computer Modelling , vol.27 , Issue.2 , pp. 27-45
    • Huang, W.1    Li, S.2
  • 11
    • 2942674864 scopus 로고    scopus 로고
    • Scheduling flexible flow lines with sequence-dependent setup times
    • Kurz, M.E. and Askin, R.G., 2004. Scheduling flexible flow lines with sequence-dependent setup times. European Journal of Operational Research, 159 (1), 66-82.
    • (2004) European Journal of Operational Research , vol.159 , Issue.1 , pp. 66-82
    • Kurz, M.E.1    Askin, R.G.2
  • 12
    • 9744269106 scopus 로고    scopus 로고
    • A branch-and-bound algorithm for a two-stage hybrid flowshop scheduling problem minimising total tardiness
    • Lee, G.C. and Kim, Y.D., 2004. A branch-and-bound algorithm for a two-stage hybrid flowshop scheduling problem minimising total tardiness. International Journal of Production Research, 42 (22), 4731-4743.
    • (2004) International Journal of Production Research , vol.42 , Issue.22 , pp. 4731-4743
    • Lee, G.C.1    Kim, Y.D.2
  • 13
    • 15244361359 scopus 로고    scopus 로고
    • Two-machine flowshop batching and scheduling
    • Lin, B.M.T. and Cheng, T.C.E., 2005. Two-machine flowshop batching and scheduling. Annals of Operations Research, 133, 149-161.
    • (2005) Annals of Operations Research , vol.133 , pp. 149-161
    • Lin, B.M.T.1    Cheng, T.C.E.2
  • 14
    • 0141509086 scopus 로고    scopus 로고
    • A case study in a two-stage hybrid flow shop with setup time and dedicated machines
    • Lin, H.-T. and Liao, C.-J., 2003. A case study in a two-stage hybrid flow shop with setup time and dedicated machines. International Journal of Production Economics, 86 (2), 133-143.
    • (2003) International Journal of Production Economics , vol.86 , Issue.2 , pp. 133-143
    • Lin, H.-T.1    Liao, C.-J.2
  • 15
    • 70449686051 scopus 로고    scopus 로고
    • Using simulated annealing to schedule a flowshop manufacturing cell with sequence-dependent family setup times
    • Lin, S.-W., et al., 2009. Using simulated annealing to schedule a flowshop manufacturing cell with sequence-dependent family setup times. International Journal of Production Research, 47 (12), 3205-3217.
    • (2009) International Journal of Production Research , vol.47 , Issue.12 , pp. 3205-3217
    • Lin, S.-W.1
  • 16
    • 78650623486 scopus 로고    scopus 로고
    • Hybrid flowshop scheduling with batch-discrete processors and machine maintenance in time windows
    • Luo, H., et al., 2011. Hybrid flowshop scheduling with batch-discrete processors and machine maintenance in time windows. International Journal of Production Research, 49 (6), 1575-1603.
    • (2011) International Journal of Production Research , vol.49 , Issue.6 , pp. 1575-1603
    • Luo, H.1
  • 21
    • 27144540137 scopus 로고    scopus 로고
    • A genetic algorithm for hybrid flowshops with sequence dependent setup times and machine eligibility
    • Ruiz, R. and Maroto, C., 2006. A genetic algorithm for hybrid flowshops with sequence dependent setup times and machine eligibility. European Journal of Operational Research, 169 (3), 781-800.
    • (2006) European Journal of Operational Research , vol.169 , Issue.3 , pp. 781-800
    • Ruiz, R.1    Maroto, C.2
  • 23
    • 13844280440 scopus 로고    scopus 로고
    • Two-machine flowshop scheduling with job class setups to minimise total flowtime
    • Wang, X. and Cheng, T.C.E., 2005. Two-machine flowshop scheduling with job class setups to minimise total flowtime. Computers and Operations Research, 32 (11), 2751-2770.
    • (2005) Computers and Operations Research , vol.32 , Issue.11 , pp. 2751-2770
    • Wang, X.1    Cheng, T.C.E.2
  • 24
    • 36849069984 scopus 로고    scopus 로고
    • Multi-family scheduling in a two-machine reentrant flow shop with setups
    • Yang, D.-L., Kuo, W.-H., and Chern, M.-S., 2008. Multi-family scheduling in a two-machine reentrant flow shop with setups. European Journal of Operational Research, 187 (3), 1160-1170.
    • (2008) European Journal of Operational Research , vol.187 , Issue.3 , pp. 1160-1170
    • Yang, D.-L.1    Kuo, W.-H.2    Chern, M.-S.3
  • 25
    • 33847059708 scopus 로고    scopus 로고
    • Development of group setup strategies for makespan minimisation in PCB assembly
    • Yilmaz, I.O., et al., 2007. Development of group setup strategies for makespan minimisation in PCB assembly. International Journal of Production Research, 45 (4), 871-897.
    • (2007) International Journal of Production Research , vol.45 , Issue.4 , pp. 871-897
    • Yilmaz, I.O.1
  • 26
    • 77951142861 scopus 로고    scopus 로고
    • Permutation and non-permutation schedules for the flowline manufacturing cell with sequence dependent family setups
    • Ying, K.-C., et al., 2010. Permutation and non-permutation schedules for the flowline manufacturing cell with sequence dependent family setups. International Journal of Production Research, 48 (8), 2169-2184.
    • (2010) International Journal of Production Research , vol.48 , Issue.8 , pp. 2169-2184
    • Ying, K.-C.1
  • 27
    • 58249087741 scopus 로고    scopus 로고
    • Optimal zone boundaries for two-class-based compact three-dimensional automated storage and retrieval systems
    • Yu, Y.G. and de Koster, R.B.M., 2009a. Optimal zone boundaries for two-class-based compact three-dimensional automated storage and retrieval systems. IIE Transactions, 41 (3), 194-208.
    • (2009) IIE Transactions , vol.41 , Issue.3 , pp. 194-208
    • Yu, Y.G.1    De Koster, R.B.M.2
  • 28
    • 57049131570 scopus 로고    scopus 로고
    • Designing an optimal turnover-based storage rack for a 3D compact automated
    • Yu, Y.G. and de Koster, R.B.M., 2009b. Designing an optimal turnover-based storage rack for a 3D compact automated. International Journal of Production Research, 47 (6), 1551-1571.
    • (2009) International Journal of Production Research , vol.47 , Issue.6 , pp. 1551-1571
    • Yu, Y.G.1    De Koster, R.B.M.2
  • 29
    • 33748321077 scopus 로고    scopus 로고
    • An immune algorithm approach to hybrid flow shops scheduling with sequence-dependent setup times
    • Zandieh, M., Fatemi Ghomi, S.M.T., and Moattar Husseini, S.M., 2006. An immune algorithm approach to hybrid flow shops scheduling with sequence-dependent setup times. Applied Mathematics and Computation, 180 (1), 111-127.
    • (2006) Applied Mathematics and Computation , vol.180 , Issue.1 , pp. 111-127
    • Zandieh, M.1    Fatemi Ghomi, S.M.T.2    Husseini, M.S.M.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.