-
1
-
-
26444492122
-
Scheduling two-stage hybrid flow shop with availability constraints
-
Allaoui, H. and Artiba, A., 2006. Scheduling two-stage hybrid flow shop with availability constraints. Computers & Operations Research, 33 (5), 1399-1429.
-
(2006)
Computers & Operations Research
, vol.33
, Issue.5
, pp. 1399-1429
-
-
Allaoui, H.1
Artiba, A.2
-
2
-
-
0035277503
-
Minimizing makespan in a blocking flowshop using genetic algorithms
-
Caraffa, V., et al., 2001. Minimizing makespan in a blocking flowshop using genetic algorithms. International Journal of Production Economics, 70 (2), 101-115.
-
(2001)
International Journal of Production Economics
, vol.70
, Issue.2
, pp. 101-115
-
-
Caraffa, V.1
-
3
-
-
33846003543
-
TSP-based scheduling in a batch-wise hybrid flow-shop
-
Caricato, P., Grieco, A., and Serino, D., 2007. TSP-based scheduling in a batch-wise hybrid flow-shop. Robotics and Computer-Integrated Manufacturing, 23 (2), 234-241.
-
(2007)
Robotics and Computer-Integrated Manufacturing
, vol.23
, Issue.2
, pp. 234-241
-
-
Caricato, P.1
Grieco, A.2
Serino, D.3
-
4
-
-
0037999881
-
Scheduling batch production using a stepwise approach
-
Chan, K.F. and Hui, C.W., 2003. Scheduling batch production using a stepwise approach. Industrial & Engineering Chemistry Research, 42 (14), 3505-3508.
-
(2003)
Industrial & Engineering Chemistry Research
, vol.42
, Issue.14
, pp. 3505-3508
-
-
Chan, K.F.1
Hui, C.W.2
-
5
-
-
0029207545
-
An application of genetic algorithms for flow shop problems
-
Chen, C.-L., Vempati, V.S., and Aljaber, N., 1995. An application of genetic algorithms for flow shop problems. European Journal of Operational Research, 80 (2), 389-396.
-
(1995)
European Journal of Operational Research
, vol.80
, Issue.2
, pp. 389-396
-
-
Chen, C.-L.1
Vempati, V.S.2
Aljaber, N.3
-
6
-
-
0000647451
-
A review of flowshop scheduling research with setup times
-
Cheng, T.C.E., Gupta, J.N.D., and Wang, G.Q., 2000. A review of flowshop scheduling research with setup times. Production and Operations Management, 9 (3), 262-282.
-
(2000)
Production and Operations Management
, vol.9
, Issue.3
, pp. 262-282
-
-
Cheng, T.C.E.1
Gupta, J.N.D.2
Wang, G.Q.3
-
7
-
-
0037410718
-
A multi-population genetic algorithm to solve multi-objective scheduling problems for parallel machines
-
Cochran, J.K., Horng, S.-M., and Fowler, J.W., 2003. A multi-population genetic algorithm to solve multi-objective scheduling problems for parallel machines. Computers & Operations Research, 30 (7), 1087-1102.
-
(2003)
Computers & Operations Research
, vol.30
, Issue.7
, pp. 1087-1102
-
-
Cochran, J.K.1
Horng, S.-M.2
Fowler, J.W.3
-
8
-
-
0037115791
-
Production/maintenance cooperative scheduling using multi-agents and fuzzy logic
-
Coudert, T., Grabot, B., and Archimede, B., 2002. Production/maintenance cooperative scheduling using multi-agents and fuzzy logic. International Journal of Production Research, 40 (18), 4611-4632.
-
(2002)
International Journal of Production Research
, vol.40
, Issue.18
, pp. 4611-4632
-
-
Coudert, T.1
Grabot, B.2
Archimede, B.3
-
11
-
-
0001164172
-
Alleles, loci, and the traveling salesman problem
-
24-26 July Pittsburgh, PA
-
Goldgerg, D. and Lingle, R., 1985. Alleles, loci, and the traveling salesman problem. In: Proceedings of the first international conference on genetic algorithms and their applications, 24-26 July Pittsburgh, PA, 154-159.
-
(1985)
Proceedings of the First International Conference on Genetic Algorithms and Their Applications
, pp. 154-159
-
-
Goldgerg, D.1
Lingle, R.2
-
12
-
-
0030149222
-
A computational study of heuristics for two-stage flexible flowshops
-
Guinet, A., et al., 1996. A computational study of heuristics for two-stage flexible flowshops. International Journal of Production Research, 34 (5), 1399-1415.
-
(1996)
International Journal of Production Research
, vol.34
, Issue.5
, pp. 1399-1415
-
-
Guinet, A.1
-
13
-
-
0023995996
-
Two-stage, hybrid flowshop scheduling problem
-
Gupta, J.N.D., 1988. Two-stage, hybrid flowshop scheduling problem. Journal of the Operational Research Society, 39 (4), 359-364.
-
(1988)
Journal of the Operational Research Society
, vol.39
, Issue.4
, pp. 359-364
-
-
Gupta, J.N.D.1
-
14
-
-
0026190509
-
Schedules for a two-stage hybrid flowshop with parallel machines at the second stage
-
Gupta, J.N.D. and Tunc, E.A., 1991. Schedules for a two-stage hybrid flowshop with parallel machines at the second stage. International Journal of Production Research, 29 (7), 1489-1502.
-
(1991)
International Journal of Production Research
, vol.29
, Issue.7
, pp. 1489-1502
-
-
Gupta, J.N.D.1
Tunc, E.A.2
-
15
-
-
27144552649
-
Flowshop scheduling research after five decades
-
Gupta, J.N.D. and Stafford, J.E.F., 2006. Flowshop scheduling research after five decades. European Journal of Operational Research, 169 (3), 699-711.
-
(2006)
European Journal of Operational Research
, vol.169
, Issue.3
, pp. 699-711
-
-
Gupta, J.N.D.1
Stafford, J.E.F.2
-
16
-
-
0030134958
-
A survey of machine scheduling problems with blocking and no-wait in process
-
Hall, N.G. and Sriskandarajah, C., 1996. A survey of machine scheduling problems with blocking and no-wait in process. Operations Research, 44 (3), 510-525.
-
(1996)
Operations Research
, vol.44
, Issue.3
, pp. 510-525
-
-
Hall, N.G.1
Sriskandarajah, C.2
-
19
-
-
33947606713
-
RFID-based wireless manufacturing for walkingworker assembly islands with fixed-position layouts
-
Huang, G.Q., Zhang, Y.F., and Jiang, P.Y., 2007. RFID-based wireless manufacturing for walkingworker assembly islands with fixed-position layouts. Robotics and Computer-Integrated Manufacturing, 23 (4), 469-477.
-
(2007)
Robotics and Computer-Integrated Manufacturing
, vol.23
, Issue.4
, pp. 469-477
-
-
Huang, G.Q.1
Zhang, Y.F.2
Jiang, P.Y.3
-
20
-
-
84864156107
-
RFID-enabled real-time wireless manufacturing for adaptive assembly planning and control
-
Huang, G.Q., et al., 2008. RFID-enabled real-time wireless manufacturing for adaptive assembly planning and control. Journal of Intelligent Manufacturing, 19 (6), 701-713.
-
(2008)
Journal of Intelligent Manufacturing
, vol.19
, Issue.6
, pp. 701-713
-
-
Huang, G.Q.1
-
21
-
-
0346009089
-
Improved genetic algorithm for the permutation flowshop scheduling problem
-
Iyer, S.K. and Saxena, B., 2004. Improved genetic algorithm for the permutation flowshop scheduling problem. Computers & Operations Research, 31 (4), 593-606.
-
(2004)
Computers & Operations Research
, vol.31
, Issue.4
, pp. 593-606
-
-
Iyer, S.K.1
Saxena, B.2
-
22
-
-
84893405732
-
Data clustering: A review
-
Jain, A.K., Murty, M.N., and Flynn, P.J., 1999. Data clustering: a review. ACM Computing Surveys, 31 (3), 264-323.
-
(1999)
ACM Computing Surveys
, vol.31
, Issue.3
, pp. 264-323
-
-
Jain, A.K.1
Murty, M.N.2
Flynn, P.J.3
-
23
-
-
0036507657
-
Application of genetic algorithms for scheduling batch-discrete production system
-
Kim, B. and Kim, S., 2002. Application of genetic algorithms for scheduling batch-discrete production system. Production Planning & Control, 13 (2), 155-165.
-
(2002)
Production Planning & Control
, vol.13
, Issue.2
, pp. 155-165
-
-
Kim, B.1
Kim, S.2
-
24
-
-
0026898494
-
Efficient algorithms for scheduling semiconductor burn-in operations
-
Lee, C.Y., Uzsoy, R., and Martin-Vega, L.A., 1992. Efficient algorithms for scheduling semiconductor burn-in operations. Operations Research, 40 (4), 764-775.
-
(1992)
Operations Research
, vol.40
, Issue.4
, pp. 764-775
-
-
Lee, C.Y.1
Uzsoy, R.2
Martin-Vega, L.A.3
-
25
-
-
0000482108
-
Scheduling jobs on parallel machines with sequence-dependent setup times
-
Lee, Y.H. and Pinedo, M., 1997. Scheduling jobs on parallel machines with sequence-dependent setup times. European Journal of Operational Research, 100 (3), 464-474.
-
(1997)
European Journal of Operational Research
, vol.100
, Issue.3
, pp. 464-474
-
-
Lee, Y.H.1
Pinedo, M.2
-
26
-
-
0141509086
-
A case study in a two-stage hybrid flow shop with setup time and dedicated machines
-
Lin, H.-T. and Liao, C.-J., 2003. A case study in a two-stage hybrid flow shop with setup time and dedicated machines. International Journal of Production Economics, 86 (2), 133-143.
-
(2003)
International Journal of Production Economics
, vol.86
, Issue.2
, pp. 133-143
-
-
Lin, H.-T.1
Liao, C.-J.2
-
27
-
-
0032599588
-
Hybrid flow shop scheduling: A survey
-
Linn, R. and Zhang, W., 1999. Hybrid flow shop scheduling: a survey. Computers & Industrial Engineering, 37 (1-2), 57-61.
-
(1999)
Computers & Industrial Engineering
, vol.37
, Issue.1-2
, pp. 57-61
-
-
Linn, R.1
Zhang, W.2
-
29
-
-
0033343706
-
Predictable scheduling of a single machine with breakdowns and sensitive jobs
-
O'Donovan, R., Uzsoy, R., and McKay, K.N., 1999. Predictable scheduling of a single machine with breakdowns and sensitive jobs. International Journal of Production Research, 37 (18), 4217-4233. (Pubitemid 30519011)
-
(1999)
International Journal of Production Research
, vol.37
, Issue.18
, pp. 4217-4233
-
-
O'Donovan, R.1
Uzsoy, R.2
McKay, K.N.3
-
30
-
-
21144440772
-
A genetic algorithm for hybrid flow-shop scheduling with multiprocessor tasks
-
Oguz, C. and Ercan, M.F., 2005. A genetic algorithm for hybrid flow-shop scheduling with multiprocessor tasks. Journal of Scheduling, 8 (4), 323-351.
-
(2005)
Journal of Scheduling
, vol.8
, Issue.4
, pp. 323-351
-
-
Oguz, C.1
Ercan, M.F.2
-
31
-
-
0033895628
-
Scheduling with batching: A review
-
Potts, C.N. and Kovalyov, M.Y., 2000. Scheduling with batching: a review. European Journal of Operational Research, 120 (2), 228-249.
-
(2000)
European Journal of Operational Research
, vol.120
, Issue.2
, pp. 228-249
-
-
Potts, C.N.1
Kovalyov, M.Y.2
-
32
-
-
0032169302
-
A hybrid three-stage flowshop problem: Efficient heuristics to minimize makespan
-
Riane, F., Artiba, A., and Elmaghraby, S.E., 1998. A hybrid three-stage flowshop problem: efficient heuristics to minimize makespan. European Journal of Operational Research, 109 (2), 321-329.
-
(1998)
European Journal of Operational Research
, vol.109
, Issue.2
, pp. 321-329
-
-
Riane, F.1
Artiba, A.2
Elmaghraby, S.E.3
-
33
-
-
0343963100
-
Scheduling with limited machine availability
-
Schmidt, G., 2000. Scheduling with limited machine availability. European Journal of Operational Research, 121 (1), 1-15.
-
(2000)
European Journal of Operational Research
, vol.121
, Issue.1
, pp. 1-15
-
-
Schmidt, G.1
-
34
-
-
37849185267
-
Optimal and near-optimal algorithms to rolling batch scheduling for seamless steel tube production
-
Tang, L.X. and Huang, L., 2007. Optimal and near-optimal algorithms to rolling batch scheduling for seamless steel tube production. International Journal of Production Economics, 105 (2), 357-371.
-
(2007)
International Journal of Production Economics
, vol.105
, Issue.2
, pp. 357-371
-
-
Tang, L.X.1
Huang, L.2
-
35
-
-
0035007932
-
A hybrid flowshop scheduling model for apparel manufacture
-
Wong, W.K., Chan, C.K., and Ip, W.H., 2001. A hybrid flowshop scheduling model for apparel manufacture. International Journal of Clothing Science and Technology, 13 (2), 115-131.
-
(2001)
International Journal of Clothing Science and Technology
, vol.13
, Issue.2
, pp. 115-131
-
-
Wong, W.K.1
Chan, C.K.2
Ip, W.H.3
-
36
-
-
16644369863
-
A genetic algorithm-based approach to scheduling of batch production with maximum profit
-
Wu, L.Y., et al., 2005. A genetic algorithm-based approach to scheduling of batch production with maximum profit. Chinese Journal of Chemical Engineering, 13 (1), 68-73.
-
(2005)
Chinese Journal of Chemical Engineering
, vol.13
, Issue.1
, pp. 68-73
-
-
Wu, L.Y.1
-
37
-
-
33846601882
-
Scheduling a hybrid flowshop with batch production at the last stage
-
Xuan, H. and Tang, L., 2007. Scheduling a hybrid flowshop with batch production at the last stage. Computers & Operations Research, 34 (9), 2718-2733.
-
(2007)
Computers & Operations Research
, vol.34
, Issue.9
, pp. 2718-2733
-
-
Xuan, H.1
Tang, L.2
-
38
-
-
0344981423
-
GA-driven part e-manufacturing scheduling via an online e-service platform
-
Zhang, Y.F., Jiang, P.Y., and Zhou, G.H., 2003. GA-driven part e-manufacturing scheduling via an online e-service platform. International Journal of Integrated Manufacturing Systems, 14 (7), 575-585.
-
(2003)
International Journal of Integrated Manufacturing Systems
, vol.14
, Issue.7
, pp. 575-585
-
-
Zhang, Y.F.1
Jiang, P.Y.2
Zhou, G.H.3
|