메뉴 건너뛰기




Volumn 48, Issue 8, 2010, Pages 2169-2184

Permutation and non-permutation schedules for the flowline manufacturing cell with sequence dependent family setups

Author keywords

Due dates; Flowshop manufacturing cell; Makespan; Non permutation schedules; Scheduling; Sequence dependent family setups; Simulated annealing algorithm

Indexed keywords

DUE DATES; FLOW-SHOPS; MAKESPAN; MANUFACTURING CELLS; PERMUTATION SCHEDULES; SEQUENCE-DEPENDENT; SIMULATED ANNEALING ALGORITHMS;

EID: 77951142861     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207540802534707     Document Type: Article
Times cited : (44)

References (26)
  • 2
    • 36849082395 scopus 로고    scopus 로고
    • A survey of scheduling problems with setup times or costs
    • Allahverdi, A, et al., 2008. A survey of scheduling problems with setup times or costs. European Journal of Operational Research, 187 (3), 985-1032.
    • (2008) European Journal of Operational Research , vol.187 , Issue.3 , pp. 985-1032
    • Allahverdi, A.1
  • 4
    • 20344369817 scopus 로고    scopus 로고
    • An algorithm for scheduling batches of parts in a multi-cell flexible manufacturing system
    • Das, S.R. and Canel, C., 2005. An algorithm for scheduling batches of parts in a multi-cell flexible manufacturing system. International Journal of Production Economics, 97 (3), 247-262.
    • (2005) International Journal of Production Economics , vol.97 , Issue.3 , pp. 247-262
    • Das, S.R.1    Canel, C.2
  • 5
    • 14644435008 scopus 로고    scopus 로고
    • Evolutionary algorithms for scheduling a flowshop manufacturing cell with sequence dependent family setups
    • França, P.M., et al., 2005. Evolutionary algorithms for scheduling a flowshop manufacturing cell with sequence dependent family setups. Computers and Industrial Engineering, 48 (3), 491-506.
    • (2005) Computers and Industrial Engineering , vol.48 , Issue.3 , pp. 491-506
    • França, P.M.1
  • 6
    • 0030130032 scopus 로고    scopus 로고
    • An evaluation of group scheduling heuristics in a flow-line manufacturing cell
    • Frazier, G.V., 1996. An evaluation of group scheduling heuristics in a flow-line manufacturing cell. International Journal of Production Research, 34 (4), 959-976.
    • (1996) International Journal of Production Research , vol.34 , Issue.4 , pp. 959-976
    • Frazier, G.V.1
  • 7
    • 0022677934 scopus 로고
    • The two-machine sequence dependent flowshop scheduling problem
    • Gupta, J.N.D and Darrow, W.P., 1986. The two-machine sequence dependent flowshop scheduling problem. European Journal of Operational Research, 24 (3), 439-446.
    • (1986) European Journal of Operational Research , vol.24 , Issue.3 , pp. 439-446
    • Gupta, J.N.D.1    Darrow, W.P.2
  • 8
    • 31444449761 scopus 로고    scopus 로고
    • Minimizing flow time in a flow-line manufacturing cell with family setup times
    • Gupta, J.N.D. and Schaller, J.E., 2006. Minimizing flow time in a flow-line manufacturing cell with family setup times. Journal of the Operational Research Society, 57 (2), 163-176.
    • (2006) Journal of the Operational Research Society , vol.57 , Issue.2 , pp. 163-176
    • Gupta, J.N.D.1    Schaller, J.E.2
  • 9
    • 37349074079 scopus 로고    scopus 로고
    • Meta-heuristics for scheduling a flowline manufacturing cell with sequence dependent family setup times
    • Hendizadeh, S.H., et al., 2008. Meta-heuristics for scheduling a flowline manufacturing cell with sequence dependent family setup times. International Journal of Production Economics, 111 (2), 593-605.
    • (2008) International Journal of Production Economics , vol.111 , Issue.2 , pp. 593-605
    • Hendizadeh, S.H.1
  • 10
    • 57049116045 scopus 로고    scopus 로고
    • Applying hybrid simulated annealing and tabu search approach to non-permutation flowshop scheduling problems
    • Lin, S.W. and Ying, K.C., 2009. Applying hybrid simulated annealing and tabu search approach to non-permutation flowshop scheduling problems. International Journal of Production Research, 47 (5), 1411-1424.
    • (2009) International Journal of Production Research , vol.47 , Issue.5 , pp. 1411-1424
    • Lin, S.W.1    Ying, K.C.2
  • 11
    • 70449686051 scopus 로고    scopus 로고
    • Using simulated annealing to schedule a flowshop manufacturing cell with sequence dependent family setup times
    • DOI: 10.1080/00207540701813210. [In press]
    • Lin, S.W., et al., 2009. Using simulated annealing to schedule a flowshop manufacturing cell with sequence dependent family setup times. International Journal of Production Research, DOI: 10.1080/00207540701813210. [In press]
    • (2009) International Journal of Production Research
    • Lin, S.W.1
  • 12
    • 33748522007 scopus 로고    scopus 로고
    • A performance evaluation of permutation vs. nonpermutation schedules in a flowshop
    • Liao, C.J., Liao, L.M., and Tseng, C.T., 2006. A performance evaluation of permutation vs. nonpermutation schedules in a flowshop. International Journal of Production Research, 44 (20), 4297-4309.
    • (2006) International Journal of Production Research , vol.44 , Issue.20 , pp. 4297-4309
    • Liao, C.J.1    Liao, L.M.2    Tseng, C.T.3
  • 14
    • 0032682261 scopus 로고    scopus 로고
    • A one-step tabu search algorithm for manufacturing cell design
    • Lazano, S., et al., 1999. A one-step tabu search algorithm for manufacturing cell design. Journal of the Operational Research Society, 50 (5), 509-516.
    • (1999) Journal of the Operational Research Society , vol.50 , Issue.5 , pp. 509-516
    • Lazano, S.1
  • 16
    • 0037210109 scopus 로고    scopus 로고
    • Performance enhancement by using non-permutation schedules in flowline-based manufacturing systems
    • Pugazhendhi, S., et al., 2002. Performance enhancement by using non-permutation schedules in flowline-based manufacturing systems. Computers and Industrial Engineering, 44 (1), 133-157.
    • (2002) Computers and Industrial Engineering , vol.44 , Issue.1 , pp. 133-157
    • Pugazhendhi, S.1
  • 17
    • 0842267361 scopus 로고    scopus 로고
    • Generating non-permutation schedules in flowline-based manufacturing systems with sequence-dependent setup times of jobs: A heuristic approach
    • Pugazhendhi, S., et al., 2004a. Generating non-permutation schedules in flowline-based manufacturing systems with sequence-dependent setup times of jobs: a heuristic approach. International Journal of Advanced Manufacturing Technology, 23 (1-2), 64-78.
    • (2004) International Journal of Advanced Manufacturing Technology , vol.23 , Issue.1-2 , pp. 64-78
    • Pugazhendhi, S.1
  • 18
    • 3142635093 scopus 로고    scopus 로고
    • Relative performance evaluation of permutation and nonpermutation schedules in flowline-based manufacturing systems
    • Pugazhendhi, S., et al., 2004b. Relative performance evaluation of permutation and nonpermutation schedules in flowline-based manufacturing systems. International Journal of Advanced Manufacturing Technology, 23 (11-12), 820-830.
    • (2004) International Journal of Advanced Manufacturing Technology , vol.23 , Issue.11-12 , pp. 820-830
    • Pugazhendhi, S.1
  • 19
    • 14044252063 scopus 로고    scopus 로고
    • Flow shop vs. permutation shop with time delay
    • Rebaine, D., 2005. Flow shop vs. permutation shop with time delay. Computers and Industrial Engineering, 48 (2), 357-362.
    • (2005) Computers and Industrial Engineering , vol.48 , Issue.2 , pp. 357-362
    • Rebaine, D.1
  • 20
    • 0242333827 scopus 로고    scopus 로고
    • Heuristics for scheduling sequence-dependent set-up jobs in flow line cells
    • Reddy, V. and Narendran, T.T., 2003. Heuristics for scheduling sequence-dependent set-up jobs in flow line cells. International Journal of Production Research, 41 (1), 193-206.
    • (2003) International Journal of Production Research , vol.41 , Issue.1 , pp. 193-206
    • Reddy, V.1    Narendran, T.T.2
  • 21
    • 0027606670 scopus 로고
    • A comprehensive analysis of group scheduling heuristics in a job shop cell
    • Ruben, R.A., Mosier, C.T., and Mahmoodi, F., 1993. A comprehensive analysis of group scheduling heuristics in a job shop cell. International Journal of Production Research, 31 (4), 1343-1369.
    • (1993) International Journal of Production Research , vol.31 , Issue.4 , pp. 1343-1369
    • Ruben, R.A.1    Mosier, C.T.2    Mahmoodi, F.3
  • 22
    • 0033720051 scopus 로고    scopus 로고
    • Scheduling a flowline manufacturing cell with sequence dependent family setup times
    • Schaller, J.E., Gupta, J.N.D., and Vakharia, A.J., 2000. Scheduling a flowline manufacturing cell with sequence dependent family setup times. European Journal of Operational Research, 125 (2), 324-339.
    • (2000) European Journal of Operational Research , vol.125 , Issue.2 , pp. 324-339
    • Schaller, J.E.1    Gupta, J.N.D.2    Vakharia, A.J.3
  • 24
    • 33750593629 scopus 로고    scopus 로고
    • Solving part-type and operation allocation problems in an FMS: An approach using constraints-based fast simulated annealing algorithm
    • Tiwari, M.K., et al., 2006. Solving part-type and operation allocation problems in an FMS: an approach using constraints-based fast simulated annealing algorithm. IEEE Transaction on System, Man and Cybernetics - Part A: Systems and Human, 36 (6), 1170-1184.
    • (2006) IEEE Transaction on System, Man and Cybernetics - Part A: Systems and Human , vol.36 , Issue.6 , pp. 1170-1184
    • Tiwari, M.K.1
  • 25
    • 0036905349 scopus 로고    scopus 로고
    • Group scheduling in a two-stage flowshop
    • Yang, W.H., 2002. Group scheduling in a two-stage flowshop. Journal of the Operational Research Society, 53 (12), 1367-1373.
    • (2002) Journal of the Operational Research Society , vol.53 , Issue.12 , pp. 1367-1373
    • Yang, W.H.1
  • 26
    • 34249903338 scopus 로고    scopus 로고
    • Multi-heuristic desirability ant colony system heuristic for nonpermutation flowshop scheduling problems
    • Ying, K.C. and Lin, S.W., 2007. Multi-heuristic desirability ant colony system heuristic for nonpermutation flowshop scheduling problems. International Journal of Advanced Manufacturing Technology, 33 (7-8), 793-802.
    • (2007) International Journal of Advanced Manufacturing Technology , vol.33 , Issue.7-8 , pp. 793-802
    • Ying, K.C.1    Lin, S.W.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.