Volumn 187, Issue 3, 2008, Pages 1160-1170

Multi-family scheduling in a two-machine reentrant flow shop with setups

Author keywords

Branch and bound; NP hard; Reentrant production flows; Scheduling; Setup time

Indexed keywords

ALGORITHMS; BRANCH AND BOUND METHOD; COMPUTATIONAL METHODS; MACHINERY; PROBLEM SOLVING; PRODUCTION CONTROL;

EID: 36849069984     PISSN: 03772217     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ejor.2006.06.065     Document Type: Article
Times cited : (39)

References (22)
  • 1
    • 36849082395 scopus 로고    scopus 로고
    • A. Allahverdi, C.T. Ng, T.C.E. Cheng, M.Y. Kovalyov, A survey of scheduling problems with setup times or costs. European Journal of Operational Research, in press, doi:10.1016/j.ejor.2006.06.060.
  • 2
    • 0025256245 scopus 로고
    • Scheduling groups of jobs in the two-machine flow shop
    • Baker K.R. Scheduling groups of jobs in the two-machine flow shop. Mathematical and Computer Modelling 13 (1990) 29-36
    • (1990) Mathematical and Computer Modelling , vol.13 , pp. 29-36
    • Baker, K.R.1
  • 4
    • 36849000963 scopus 로고    scopus 로고
    • M.S. Chern, D.L. Yang, A two-machine scheduling problem with reprocessing operations, in: The 5th International Congress on Computational and Applied Mathematics, Belgium, 1992.
  • 5
    • 0042595608 scopus 로고    scopus 로고
    • A heuristic algorithm for two-machine re-entrant shop scheduling
    • Drobouchevitch I.G., and Giordani V.A. A heuristic algorithm for two-machine re-entrant shop scheduling. Annals of Operations Research 86 (1999) 417-439
    • (1999) Annals of Operations Research , vol.86 , pp. 417-439
    • Drobouchevitch, I.G.1    Giordani, V.A.2
  • 9
    • 0003075019 scopus 로고
    • Optimal two- and three-stage production schedules with setup times included
    • Johnson S.M. Optimal two- and three-stage production schedules with setup times included. Naval Research Logistics Quarterly 1 (1954) 61-68
    • (1954) Naval Research Logistics Quarterly , vol.1 , pp. 61-68
    • Johnson, S.M.1
  • 12
    • 0001551888 scopus 로고
    • Sequencing n jobs on two machines with arbitrary time lags
    • Mitten L.G. Sequencing n jobs on two machines with arbitrary time lags. Management Science 5 (1958) 293-298
    • (1958) Management Science , vol.5 , pp. 293-298
    • Mitten, L.G.1
  • 13
    • 0003762641 scopus 로고
    • Moss S.J., and Ledwith A. (Eds), Chapman and Hall, New York
    • In: Moss S.J., and Ledwith A. (Eds). The Chemistry of the Semiconductor Industry (1987), Chapman and Hall, New York
    • (1987) The Chemistry of the Semiconductor Industry
  • 16
    • 0001117904 scopus 로고
    • Optimal schedule in a GT-type flow-shop under series-parallel precedence constraints
    • Sekiguchi Y. Optimal schedule in a GT-type flow-shop under series-parallel precedence constraints. Journal of Operations Research Society of Japan 26 (1983) 226-251
    • (1983) Journal of Operations Research Society of Japan , vol.26 , pp. 226-251
    • Sekiguchi, Y.1
  • 17
    • 0020816005 scopus 로고
    • Sequency on two and three machines with setup, processing and removal times separated
    • Sule D.R., and Huang K.Y. Sequency on two and three machines with setup, processing and removal times separated. International Journal of Production Research 21 (1983) 723-732
    • (1983) International Journal of Production Research , vol.21 , pp. 723-732
    • Sule, D.R.1    Huang, K.Y.2
  • 18
    • 0038919801 scopus 로고
    • (Translated from Romanian by I. Tomescu and S. Rudeanu), Collet's Publishers Ltd., London, Wellingborough
    • Tomescu I. Introduction to Combinatiorics. (Translated from Romanian by I. Tomescu and S. Rudeanu) (1975), Collet's Publishers Ltd., London, Wellingborough
    • (1975) Introduction to Combinatiorics
    • Tomescu, I.1
  • 19
    • 0026896286 scopus 로고
    • Two- and three-machine flow shop scheduling problems with equal sized transfer families
    • Vickson R.G., and Alfredsson B.E. Two- and three-machine flow shop scheduling problems with equal sized transfer families. International Journal of Production Research 30 (1992) 1551-1574
    • (1992) International Journal of Production Research , vol.30 , pp. 1551-1574
    • Vickson, R.G.1    Alfredsson, B.E.2
  • 21
    • 36849041231 scopus 로고    scopus 로고
    • A scheduling problem with reprocessing operations - a case study
    • Yang D.L., and Chern M.S. A scheduling problem with reprocessing operations - a case study. Journal of Management 14 (1997) 135-154
    • (1997) Journal of Management , vol.14 , pp. 135-154
    • Yang, D.L.1    Chern, M.S.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.