-
1
-
-
0033114757
-
A survey of scheduling research involving setup considerations
-
Allahverdi, A., Gupta, J.N.D. and Aldowaisan, T., 1999. A survey of scheduling research involving setup considerations. OMEGA, 27, 219-239.
-
(1999)
OMEGA
, vol.27
, pp. 219-239
-
-
Allahverdi, A.1
Gupta, J.N.D.2
Aldowaisan, T.3
-
2
-
-
36849082395
-
A survey of scheduling problems with setup times or costs
-
Allahverdi, A., Ng, C.T., Cheng, T.C.E. and Kovalyov, M.Y., 2008. A survey of scheduling problems with setup times or costs. European Journal of Operational Research, 187, 985-1032.
-
(2008)
European Journal of Operational Research
, vol.187
, pp. 985-1032
-
-
Allahverdi, A.1
Ng, C.T.2
Cheng, T.C.E.3
Kovalyov, M.Y.4
-
3
-
-
0015048799
-
Production flow analysis
-
Burbidge, J.L., 1971. Production flow analysis. Production Engineer, 50, 139-152.
-
(1971)
Production Engineer
, vol.50
, pp. 139-152
-
-
Burbidge, J.L.1
-
4
-
-
0000647451
-
A review of flowshop scheduling research with setup times
-
Cheng, T.C.E., Gupta, J.N.D. and Wang, G., 2000. A review of flowshop scheduling research with setup times. Production and Operations Management, 9, 283-302.
-
(2000)
Production and Operations Management
, vol.9
, pp. 283-302
-
-
Cheng, T.C.E.1
Gupta, J.N.D.2
Wang, G.3
-
5
-
-
20344369817
-
An algorithm for scheduling batches of parts in a multi-cell flexible manufacturing system
-
Das, S.R. and Canel, C., 2005. An algorithm for scheduling batches of parts in a multi-cell flexible manufacturing system. International Journal of Production Economics, 97, 247-262.
-
(2005)
International Journal of Production Economics
, vol.97
, pp. 247-262
-
-
Das, S.R.1
Canel, C.2
-
6
-
-
14644435008
-
Evolutionary algorithms for scheduling a flowshop manufacturing cell with sequence dependent family setups
-
França, P.M., Gupta, J.N.D., Mendes, A.S., Moscato, P. and Veltink, K., 2005. Evolutionary algorithms for scheduling a flowshop manufacturing cell with sequence dependent family setups. Computers and Industrial Engineering, 48, 491-506.
-
(2005)
Computers and Industrial Engineering
, vol.48
, pp. 491-506
-
-
França, P.M.1
Gupta, J.N.D.2
Mendes, A.S.3
Moscato, P.4
Veltink, K.5
-
7
-
-
0030130032
-
An evaluation of group scheduling heuristics in a flow-line manufacturing cell
-
Frazier, G.V., 1996. An evaluation of group scheduling heuristics in a flow-line manufacturing cell. International Journal of Production Research, 34, 959-976.
-
(1996)
International Journal of Production Research
, vol.34
, pp. 959-976
-
-
Frazier, G.V.1
-
8
-
-
0009311096
-
A review of flowshop scheduling research
-
L.P. Ritzman, L.J. Krajewski, W.L. Berry, S.M. Goodman, S.T. Hardy and L.D. Vitt, eds. The Hague: Martin Nijhoff
-
Gupta, J.N.D., 1979. A review of flowshop scheduling research. In: L.P. Ritzman, L.J. Krajewski, W.L. Berry, S.M. Goodman, S.T. Hardy and L.D. Vitt, eds. Disaggregation problems in manufacturing and service organizations. The Hague: Martin Nijhoff, 363-388.
-
(1979)
Disaggregation Problems in Manufacturing and Service Organizations
, pp. 363-388
-
-
Gupta, J.N.D.1
-
11
-
-
37349074079
-
Mata-heuristics for scheduling a flowline manufacturing cell with sequence dependent family setup times
-
Hendizadeh, S.H., Faramarzi, H., Mansouri, S.A., Gupta, J.N.D. and ElMekkawy, T.Y., 2008. Mata-heuristics for scheduling a flowline manufacturing cell with sequence dependent family setup times. International Journal of Production Economics, 111, 593-605.
-
(2008)
International Journal of Production Economics
, vol.111
, pp. 593-605
-
-
Hendizadeh, S.H.1
Faramarzi, H.2
Mansouri, S.A.3
Gupta, J.N.D.4
Elmekkawy, T.Y.5
-
12
-
-
0017526656
-
Group scheduling technique for multiproduct, multistage manufacturing systems
-
Hitomi, K. and Ham, I., 1977. Group scheduling technique for multiproduct, multistage manufacturing systems. Journal of Engineering for Industry, 99, 759-765.
-
(1977)
Journal of Engineering for Industry
, vol.99
, pp. 759-765
-
-
Hitomi, K.1
Ham, I.2
-
13
-
-
26444479778
-
Optimization by simulated annealing
-
Kirkpatrik, S., Gelatt, C.D. and Vecch, M.P., 1983. Optimization by simulated annealing. Science, 220, 671-680.
-
(1983)
Science
, vol.220
, pp. 671-680
-
-
Kirkpatrik, S.1
Gelatt, C.D.2
Vecch, M.P.3
-
14
-
-
33644858890
-
Sequence-dependent group scheduling problems in flexible flow shops
-
Logendran, R., De Szoeke, P. and Barnard, F., 2006. Sequence-dependent group scheduling problems in flexible flow shops. International Journal of Production Economics, 102, 66-86.
-
(2006)
International Journal of Production Economics
, vol.102
, pp. 66-86
-
-
Logendran, R.1
De Szoeke, P.2
Barnard, F.3
-
15
-
-
0026220052
-
A comparison of exhaustive and non-exhaustive group scheduling heuristics in a manufacturing cell
-
Mahmoodi, F. and Dooley, K.J., 1991. A comparison of exhaustive and non-exhaustive group scheduling heuristics in a manufacturing cell. International Journal of Production Research, 29, 1923-1939.
-
(1991)
International Journal of Production Research
, vol.29
, pp. 1923-1939
-
-
Mahmoodi, F.1
Dooley, K.J.2
-
16
-
-
5744249209
-
Equations of state calculations by fast computing machines
-
Metropolis, N., Rosenbluth, A., Rosenbluth, M., Teller, A. and Teller, E., 1953. Equations of state calculations by fast computing machines. Journal of Chemical Physics, 21, 1087-1090.
-
(1953)
Journal of Chemical Physics
, vol.21
, pp. 1087-1090
-
-
Metropolis, N.1
Rosenbluth, A.2
Rosenbluth, M.3
Teller, A.4
Teller, E.5
-
18
-
-
0242333827
-
Heuristics for scheduling sequence-dependent set-up jobs in flow line cells
-
Reddy, V. and Narendran, T.T., 2003. Heuristics for scheduling sequence-dependent set-up jobs in flow line cells. International Journal of Production Research, 41, 193-206.
-
(2003)
International Journal of Production Research
, vol.41
, pp. 193-206
-
-
Reddy, V.1
Narendran, T.T.2
-
19
-
-
0027606670
-
A comprehensive analysis of group scheduling heuristics in a job shop cell
-
Ruben, R.A., Mosier, C.T. and Mahmoodi, F., 1993. A comprehensive analysis of group scheduling heuristics in a job shop cell. International Journal of Production Research, 31, 1343-1369.
-
(1993)
International Journal of Production Research
, vol.31
, pp. 1343-1369
-
-
Ruben, R.A.1
Mosier, C.T.2
Mahmoodi, F.3
-
20
-
-
0033720051
-
Scheduling a flowline manufacturing cell with sequence dependent family setup times
-
Schaller, J.E., Gupta, J.N.D. and Vakharia, A.J., 2000. Scheduling a flowline manufacturing cell with sequence dependent family setup times. European Journal of Operational Research, 125, 324-339.
-
(2000)
European Journal of Operational Research
, vol.125
, pp. 324-339
-
-
Schaller, J.E.1
Gupta, J.N.D.2
Vakharia, A.J.3
-
21
-
-
33750593629
-
Solving part-type and operation allocation problems in an FMS: An approach using constraints-based fast simulated annealing algorithm
-
Tiwari, M.K., Kumar, S., Kumar, S., Prakash, R. and Shankar, R., 2006. Solving part-type and operation allocation problems in an FMS: an approach using constraints-based fast simulated annealing algorithm. IEEE Transaction on System, Man and Cybernetics - Part A: Systems and Human, 36, 1170-1184.
-
(2006)
IEEE Transaction on System, Man and Cybernetics - Part A: Systems and Human
, vol.36
, pp. 1170-1184
-
-
Tiwari, M.K.1
Kumar, S.2
Kumar, S.3
Prakash, R.4
Shankar, R.5
|