메뉴 건너뛰기




Volumn 63, Issue 1, 2012, Pages 285-293

An economic manufacturing quantity model for a two-stage assembly system with imperfect processes and variable production rate

Author keywords

Completely backlogged; Inventory; Two stage assembly system; Variable assembly rate

Indexed keywords

ASSEMBLY RATE; ASSEMBLY SYSTEMS; COMPLETELY BACKLOGGED; COST MINIMIZATION MODELS; DECISION VARIABLES; ECONOMIC MANUFACTURING QUANTITY MODELS; END-PRODUCTS; INVENTORY; NUMERICAL EXAMPLE; OPTIMAL SOLUTIONS; PRODUCTION RUN TIME; UNSATISFIED DEMAND; VARIABLE PRODUCTION RATE;

EID: 84859081080     PISSN: 03608352     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.cie.2012.02.011     Document Type: Article
Times cited : (32)

References (28)
  • 1
    • 0030195390 scopus 로고    scopus 로고
    • A production lot size inventory model for deteriorating items and arbitrary production and demand rates
    • Z.T. Balkhi, and L. Benldlerouf A production lot size inventory model for deteriorating items and arbitrary production and demand rates European Journal of Operational Research 92 1996 302 309
    • (1996) European Journal of Operational Research , vol.92 , pp. 302-309
    • Balkhi, Z.T.1    Benldlerouf, L.2
  • 4
    • 34447260758 scopus 로고    scopus 로고
    • On optimal manufacturing batch size with rework process at single-stage production system
    • L.E. Cárdenas-Barrón On optimal manufacturing batch size with rework process at single-stage production system Computers & Industrial Engineering 53 2007 196 198
    • (2007) Computers & Industrial Engineering , vol.53 , pp. 196-198
    • Cárdenas-Barrón, L.E.1
  • 5
    • 55649099841 scopus 로고    scopus 로고
    • Optimal manufacturing batch size with rework in a single-stage production system - A simple derivation
    • L.E. Cárdenas-Barrón Optimal manufacturing batch size with rework in a single-stage production system - A simple derivation Computers & Industrial Engineering 55 2008 758 765
    • (2008) Computers & Industrial Engineering , vol.55 , pp. 758-765
    • Cárdenas-Barrón, L.E.1
  • 6
    • 58849151362 scopus 로고    scopus 로고
    • On optimal batch sizing in a multi-stage production system with rework consideration
    • L.E. Cárdenas-Barrón On optimal batch sizing in a multi-stage production system with rework consideration European Journal of Operational Research 196 2009 1238 1244
    • (2009) European Journal of Operational Research , vol.196 , pp. 1238-1244
    • Cárdenas-Barrón, L.E.1
  • 7
    • 69649103599 scopus 로고    scopus 로고
    • Economic production quantity with rework process at a single-stage manufacturing system with planned backorders
    • L.E. Cárdenas-Barrón Economic production quantity with rework process at a single-stage manufacturing system with planned backorders Computers & Industrial Engineering 57 2009 1105 1113
    • (2009) Computers & Industrial Engineering , vol.57 , pp. 1105-1113
    • Cárdenas-Barrón, L.E.1
  • 8
    • 3242721026 scopus 로고
    • EBQ for a multistage production system considering rework
    • S. Chakraborty, and N.V. Rao EBQ for a multistage production system considering rework Opsearch 25 1988 75 88
    • (1988) Opsearch , vol.25 , pp. 75-88
    • Chakraborty, S.1    Rao, N.V.2
  • 9
    • 0001887653 scopus 로고
    • Economic lot size determination in multi-stage assembly systems
    • W.B. Crowston, M. Wagner, and J.F. Williams Economic lot size determination in multi-stage assembly systems Management Science 19 1973 517 527
    • (1973) Management Science , vol.19 , pp. 517-527
    • Crowston, W.B.1    Wagner, M.2    Williams, J.F.3
  • 10
    • 33846902774 scopus 로고    scopus 로고
    • Effect of inspection errors and preventive maintenance on a two-stage production inventory system
    • M.A. Darwish, and M. Ben-Daya Effect of inspection errors and preventive maintenance on a two-stage production inventory system International Journal of Production Economics 107 2007 301 313
    • (2007) International Journal of Production Economics , vol.107 , pp. 301-313
    • Darwish, M.A.1    Ben-Daya, M.2
  • 11
    • 2942670639 scopus 로고    scopus 로고
    • Integrating resource and production decisions in a simple multi-stage assembly system
    • N. Dellaert, and T. De Kok Integrating resource and production decisions in a simple multi-stage assembly system International Journal of Production Economics 90 2004 281 294
    • (2004) International Journal of Production Economics , vol.90 , pp. 281-294
    • Dellaert, N.1    De Kok, T.2
  • 12
    • 0034343395 scopus 로고    scopus 로고
    • Push and pull strategies in multi-stage assembly systems
    • N.P. Dellaert, A.G. De Kok, and W. Wang Push and pull strategies in multi-stage assembly systems Statistica Neerlandica 54 2000 175 189
    • (2000) Statistica Neerlandica , vol.54 , pp. 175-189
    • Dellaert, N.P.1    De Kok, A.G.2    Wang, W.3
  • 13
    • 0032667510 scopus 로고    scopus 로고
    • Production lot sizing with variable production rate and explicit idle capacity cost
    • S. Eiamkanchanalai, and A. Banerjee Production lot sizing with variable production rate and explicit idle capacity cost International Journal of Production Economics 59 1999 251 259
    • (1999) International Journal of Production Economics , vol.59 , pp. 251-259
    • Eiamkanchanalai, S.1    Banerjee, A.2
  • 15
    • 9644264287 scopus 로고    scopus 로고
    • Optimal design of unreliable production-inventory systems with variable production rate
    • B.C. Giri, W.Y. Yun, and T. Dohi Optimal design of unreliable production-inventory systems with variable production rate European Journal of Operations Research 162 2005 372 386
    • (2005) European Journal of Operations Research , vol.162 , pp. 372-386
    • Giri, B.C.1    Yun, W.Y.2    Dohi, T.3
  • 16
    • 3242701287 scopus 로고    scopus 로고
    • Optimal manufacturing batch size with rework process at single-stage production system
    • A.A.M. Jamal, B.R. Sarker, and S. Mondal Optimal manufacturing batch size with rework process at single-stage production system Computers & Industrial Engineering 47 2004 77 89
    • (2004) Computers & Industrial Engineering , vol.47 , pp. 77-89
    • Jamal, A.A.M.1    Sarker, B.R.2    Mondal, S.3
  • 17
    • 0026932105 scopus 로고
    • Optimal cycle times in multistage serial systems with set-up and inventory costs
    • I.A. Karimi Optimal cycle times in multistage serial systems with set-up and inventory costs Management Science 38 1992 1467 1481
    • (1992) Management Science , vol.38 , pp. 1467-1481
    • Karimi, I.A.1
  • 18
    • 0028698197 scopus 로고
    • Economic production lot size model with variable production rate and imperfect quality
    • M. Khouja, and A. Mehrez Economic production lot size model with variable production rate and imperfect quality The Journal of the Operational Research Society 45 1994 1405 1417
    • (1994) The Journal of the Operational Research Society , vol.45 , pp. 1405-1417
    • Khouja, M.1    Mehrez, A.2
  • 19
    • 0032737810 scopus 로고    scopus 로고
    • Optimal two-stage lot sizing and inventory batching policies
    • D.S. Kim Optimal two-stage lot sizing and inventory batching policies International Journal of Production Economics 58 1999 221 234
    • (1999) International Journal of Production Economics , vol.58 , pp. 221-234
    • Kim, D.S.1
  • 20
    • 0018479533 scopus 로고
    • Optimization of single-item multistage stochastic production inventory systems
    • U. Kumar, and P. Vrat Optimization of single-item multistage stochastic production inventory systems Journal of Operational Research Society 30 1979 547 553
    • (1979) Journal of Operational Research Society , vol.30 , pp. 547-553
    • Kumar, U.1    Vrat, P.2
  • 21
    • 0030653729 scopus 로고    scopus 로고
    • Using a variable production rate as a response mechanism in the economic production lot size model
    • C. Larsen Using a variable production rate as a response mechanism in the economic production lot size model Journal of the Operational Research Society 48 1997 97 99
    • (1997) Journal of the Operational Research Society , vol.48 , pp. 97-99
    • Larsen, C.1
  • 22
    • 80255141924 scopus 로고    scopus 로고
    • Optimal production run time for two-stage production system with imperfect processes and allowable shortages
    • W.L. Pearn, R.H. Su, M.W. Weng, and C.H. Hsu Optimal production run time for two-stage production system with imperfect processes and allowable shortages Central European Journal of Operational Research 19 2011 533 545
    • (2011) Central European Journal of Operational Research , vol.19 , pp. 533-545
    • Pearn, W.L.1    Su, R.H.2    Weng, M.W.3    Hsu, C.H.4
  • 23
    • 34548565651 scopus 로고    scopus 로고
    • Optimal batch sizing in a multi-stage production system with rework consideration
    • B.R. Sarker, A.M.M. Jamal, and S. Mondal Optimal batch sizing in a multi-stage production system with rework consideration European Journal of Operational Research 184 2008 915 929
    • (2008) European Journal of Operational Research , vol.184 , pp. 915-929
    • Sarker, B.R.1    Jamal, A.M.M.2    Mondal, S.3
  • 24
    • 0022131173 scopus 로고
    • Optimal policy for a two-stage assembly system under random demand
    • C. Schmidt, and S. Nahmias Optimal policy for a two-stage assembly system under random demand Operations Research 33 1985 1130 1145
    • (1985) Operations Research , vol.33 , pp. 1130-1145
    • Schmidt, C.1    Nahmias, S.2
  • 25
    • 0001199473 scopus 로고
    • Optimal and system myopic policies for multi-echelon production/inventory assembly systems
    • L.B. Schwarz, and L. Schrage Optimal and system myopic policies for multi-echelon production/inventory assembly systems Management Science 21 1975 1285 1294
    • (1975) Management Science , vol.21 , pp. 1285-1294
    • Schwarz, L.B.1    Schrage, L.2
  • 26
    • 0035241068 scopus 로고    scopus 로고
    • A production inventory model which considers the dependence of production rate on demand and inventory level
    • C.T. Su, and C.W. Lin A production inventory model which considers the dependence of production rate on demand and inventory level Production Planning and Control 12 2001 69 75
    • (2001) Production Planning and Control , vol.12 , pp. 69-75
    • Su, C.T.1    Lin, C.W.2
  • 27
    • 0016572027 scopus 로고
    • Manufacturing cycle time determination for a multi-stage economic production quantity model
    • A.Z. Szendrovits Manufacturing cycle time determination for a multi-stage economic production quantity model Management Science 22 1975 298 308
    • (1975) Management Science , vol.22 , pp. 298-308
    • Szendrovits, A.Z.1
  • 28
    • 0014804610 scopus 로고
    • The economic lot sizes in multistage production systems
    • H.A. Taha, and R.W. Skeith The economic lot sizes in multistage production systems IIE Transactions 2 1970 157 162
    • (1970) IIE Transactions , vol.2 , pp. 157-162
    • Taha, H.A.1    Skeith, R.W.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.