메뉴 건너뛰기




Volumn 58, Issue 3, 1999, Pages 221-234

Optimal two-stage lot sizing and inventory batching policies

Author keywords

Inventory batching policies; Operation unit batching; Two stage lot sizing; Unit unit batching

Indexed keywords

INVENTORY CONTROL; MATHEMATICAL MODELS; PRODUCTION ENGINEERING;

EID: 0032737810     PISSN: 09255273     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0925-5273(98)00057-7     Document Type: Article
Times cited : (10)

References (15)
  • 1
    • 0020752313 scopus 로고
    • Non-integer optimal lot size ratios in two-stage production/inventory systems
    • Szendrovits A.Z. Non-integer optimal lot size ratios in two-stage production/inventory systems. International Journal of Production Research. 21(3):1983;323-336.
    • (1983) International Journal of Production Research , vol.21 , Issue.3 , pp. 323-336
    • Szendrovits, A.Z.1
  • 2
    • 0024905371 scopus 로고
    • Optimal cycle times in a two-stage serial system with set-up and inventory costs
    • Karimi I.A. Optimal cycle times in a two-stage serial system with set-up and inventory costs. IIE Transactions. 21(4):1989;324-332.
    • (1989) IIE Transactions , vol.21 , Issue.4 , pp. 324-332
    • Karimi, I.A.1
  • 3
    • 0040262886 scopus 로고
    • Job-shop lot release sizes
    • Schussel G. Job-shop lot release sizes. Management Science. 14:1968;B449-472.
    • (1968) Management Science , vol.14 , pp. 449-472
    • Schussel, G.1
  • 4
    • 0014804610 scopus 로고
    • The economic lot sizes in multistage production systems
    • Taha H.A., Skeith R.W. The economic lot sizes in multistage production systems. AIIE Transactions. 2(2):1970;157-162.
    • (1970) AIIE Transactions , vol.2 , Issue.2 , pp. 157-162
    • Taha, H.A.1    Skeith, R.W.2
  • 5
    • 0015357411 scopus 로고
    • Scheduling in a multistage production system with set-up and inventory costs
    • Jensen P.A., Khan H.A. Scheduling in a multistage production system with set-up and inventory costs. AIIE Transactions. 4(2):1972;126-133.
    • (1972) AIIE Transactions , vol.4 , Issue.2 , pp. 126-133
    • Jensen, P.A.1    Khan, H.A.2
  • 6
    • 0001887653 scopus 로고
    • Economic lot size determination in multi-stage assembly systems
    • Crowston W.B., Wagner M.H., Williams J.F. Economic lot size determination in multi-stage assembly systems. Management Science. 19(5):1973;517-527.
    • (1973) Management Science , vol.19 , Issue.5 , pp. 517-527
    • Crowston, W.B.1    Wagner, M.H.2    Williams, J.F.3
  • 7
    • 0001199473 scopus 로고
    • Optimal and system myopic policies for multiechelon production/inventory assembly systems
    • Schwarz L.B., Schrage L. Optimal and system myopic policies for multiechelon production/inventory assembly systems. Management Science. 21(11):1975;1285-1294.
    • (1975) Management Science , vol.21 , Issue.11 , pp. 1285-1294
    • Schwarz, L.B.1    Schrage, L.2
  • 8
    • 0016572027 scopus 로고
    • Manufacturing cycle time determination for a multi-stage economic production quantity model
    • Szendrovits A.Z. Manufacturing cycle time determination for a multi-stage economic production quantity model. Management Science. 22(3):1975;298-308.
    • (1975) Management Science , vol.22 , Issue.3 , pp. 298-308
    • Szendrovits, A.Z.1
  • 9
    • 0019612365 scopus 로고
    • Comments on the optimality in "optimal and system myopic policies for multi-echelon production/inventory assembly systems"
    • Szendrovits A.Z. Comments on the optimality in "optimal and system myopic policies for multi-echelon production/inventory assembly systems" Management Science. 27(9):1981;1081-1087.
    • (1981) Management Science , vol.27 , Issue.9 , pp. 1081-1087
    • Szendrovits, A.Z.1
  • 10
    • 0039078972 scopus 로고
    • Optimizing multi-stage production with constant lot size and varying numbers of batches
    • Szendrovits A.Z., Drezner Z. Optimizing multi-stage production with constant lot size and varying numbers of batches. OMEGA. 8(6):1980;623-629.
    • (1980) OMEGA , vol.8 , Issue.6 , pp. 623-629
    • Szendrovits, A.Z.1    Drezner, Z.2
  • 11
    • 0000584038 scopus 로고
    • A note on the optimality of integer lot size ratios in "economic lot size determination in multi-stage assembly systems"
    • Williams J.F. A note on the optimality of integer lot size ratios in "economic lot size determination in multi-stage assembly systems" Management Science. 28(11):1982;1341-1349.
    • (1982) Management Science , vol.28 , Issue.11 , pp. 1341-1349
    • Williams, J.F.1
  • 12
    • 0026932105 scopus 로고
    • Optimal cycle times in multistage serial systems with set-up and inventory costs
    • Karimi I.A. Optimal cycle times in multistage serial systems with set-up and inventory costs. Management Science. 38(10):1992;1467-1481.
    • (1992) Management Science , vol.38 , Issue.10 , pp. 1467-1481
    • Karimi, I.A.1
  • 14
    • 0023343841 scopus 로고
    • Determining lot sizes and resource requirements: A review
    • Bahl H., Ritzman L.P., Gupta J. Determining lot sizes and resource requirements. A review Operations Research. 35(3):1987;329-345.
    • (1987) Operations Research , vol.35 , Issue.3 , pp. 329-345
    • Bahl, H.1    Ritzman, L.P.2    Gupta, J.3
  • 15
    • 0029343762 scopus 로고
    • Integrative versus separate cycle scheduling heuristics for capacitated discrete lot sizing and sequencing problems
    • Kim D., Mabert V.A. Integrative versus separate cycle scheduling heuristics for capacitated discrete lot sizing and sequencing problems. International Journal of Production Research. 33(7):1995;2007-2021.
    • (1995) International Journal of Production Research , vol.33 , Issue.7 , pp. 2007-2021
    • Kim, D.1    Mabert, V.A.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.