메뉴 건너뛰기




Volumn 162, Issue 2, 2005, Pages 372-386

Optimal design of unreliable production-inventory systems with variable production rate

Author keywords

Inventory; Lot size; Machine breakdown and repair; Production; Safety stocks

Indexed keywords

COSTS; INVENTORY CONTROL; MACHINE DESIGN; MATHEMATICAL MODELS; PROBABILITY; PUBLIC POLICY;

EID: 9644264287     PISSN: 03772217     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ejor.2003.10.015     Document Type: Article
Times cited : (66)

References (17)
  • 1
    • 0031169483 scopus 로고    scopus 로고
    • A simple approximation of the EMQ model with Poisson machine failures
    • N.E. Abboud, A simple approximation of the EMQ model with Poisson machine failures, Production Planning and Control 8 (4) (1997) 385-397.
    • (1997) Production Planning and Control , vol.8 , Issue.4 , pp. 385-397
    • Abboud, N.E.1
  • 3
    • 0024037430 scopus 로고
    • Optimally of zero-inventory policies for unreliable manufacturing systems
    • T. Bielecki, P.R. Kumar, Optimally of zero-inventory policies for unreliable manufacturing systems, Operations Research 36 (4) (1988) 532-541.
    • (1988) Operations Research , vol.36 , Issue.4 , pp. 532-541
    • Bielecki, T.1    Kumar, P.R.2
  • 4
    • 0031119032 scopus 로고    scopus 로고
    • Joint determination of preventive maintenance and safety stocks in an unreliable production environment
    • K.L. Cheung, W.H. Hausman, Joint determination of preventive maintenance and safety stocks in an unreliable production environment, Naval Research Logistics 44 (1997) 257-271.
    • (1997) Naval Research Logistics , vol.44 , pp. 257-271
    • Cheung, K.L.1    Hausman, W.H.2
  • 5
    • 0035546071 scopus 로고    scopus 로고
    • Optimal control of preventive maintenance schedule and safety stocks in an unreliable manufacturing environment
    • T. Dohi, H. Okamura, S. Osaki, Optimal control of preventive maintenance schedule and safety stocks in an unreliable manufacturing environment, International Journal of Production Economics 74 (2001) 147-155.
    • (2001) International Journal of Production Economics , vol.74 , pp. 147-155
    • Dohi, T.1    Okamura, H.2    Osaki, S.3
  • 9
    • 0026927270 scopus 로고
    • Production batching with machine breakdowns and safety stocks
    • H. Groenevelt, L. Pintelon, A. Seidmann, Production batching with machine breakdowns and safety stocks, Operations Research 40 (1992) 959-971.
    • (1992) Operations Research , vol.40 , pp. 959-971
    • Groenevelt, H.1    Pintelon, L.2    Seidmann, A.3
  • 10
    • 0028698197 scopus 로고
    • Economic production lot size model with variable production rate and imperfect quality
    • M. Khouja, A. Mehrez, Economic production lot size model with variable production rate and imperfect quality, Journal of the Operational Research Society 45 (1994) 1405-1417.
    • (1994) Journal of the Operational Research Society , vol.45 , pp. 1405-1417
    • Khouja, M.1    Mehrez, A.2
  • 11
    • 0031141332 scopus 로고    scopus 로고
    • An extended EMQ model for a failure prone machine with general lifetime distribution
    • C.H. Kim, Y. Hong, An extended EMQ model for a failure prone machine with general lifetime distribution, International Journal of Production Economics 49 (1997) 215-223.
    • (1997) International Journal of Production Economics , vol.49 , pp. 215-223
    • Kim, C.H.1    Hong, Y.2
  • 12
    • 0031232875 scopus 로고    scopus 로고
    • An extended optimal lot sizing model with an unreliable machine
    • C.H. Kim, Y. Hong, S.Y. Kim, An extended optimal lot sizing model with an unreliable machine, Production Planning and Control 8 (6) (1997) 577-585.
    • (1997) Production Planning and Control , vol.8 , Issue.6 , pp. 577-585
    • Kim, C.H.1    Hong, Y.2    Kim, S.Y.3
  • 15
    • 0024945301 scopus 로고
    • Analysis of production-inventory system with unreliable production facility
    • M.J.M. Posner, M. Berg, Analysis of production-inventory system with unreliable production facility, Operations Research Letters 8 (1989) 339-345.
    • (1989) Operations Research Letters , vol.8 , pp. 339-345
    • Posner, M.J.M.1    Berg, M.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.