-
3
-
-
0002494252
-
Production planning over time and the nature of the expectation and planning horizon
-
Jan.
-
F. Modigliani and F. E. Hohn, "Production planning over time and the nature of the expectation and planning horizon," Econometrica, vol. 23, no. 1, pp. 46-66, Jan. 1955.
-
(1955)
Econometrica
, vol.23
, Issue.1
, pp. 46-66
-
-
Modigliani, F.1
Hohn, F.E.2
-
4
-
-
0003708669
-
-
Englewood Cliffs, NJ: Prentice-Hall
-
C. C. Holt, F. Modigliani, J. F. Muth, and H. A. Simon, Planning Production, Inventories and Work Force. Englewood Cliffs, NJ: Prentice-Hall, 1960.
-
(1960)
Planning Production, Inventories and Work Force
-
-
Holt, C.C.1
Modigliani, F.2
Muth, J.F.3
Simon, H.A.4
-
9
-
-
29144447714
-
Production planning with load dependent lead times
-
J. Pahl, S. Voß, and D. L. Woodruff, "Production planning with load dependent lead times," 4OR: A Quart. J. Oper. Res., vol. 3, no. 4, pp. 257-302, 2005.
-
(2005)
4OR: A Quart. J. Oper. Res.
, vol.3
, Issue.4
, pp. 257-302
-
-
Pahl, J.1
Voß, S.2
Woodruff, D.L.3
-
10
-
-
34250195301
-
Production planning with load dependent lead times: An update of research
-
J. Pahl, S. Voß, and D. L. Woodruff, "Production planning with load dependent lead times: An update of research," Ann. Oper. Res., vol. 153, no. 1, pp. 297-345, 2007.
-
(2007)
Ann. Oper. Res.
, vol.153
, Issue.1
, pp. 297-345
-
-
Pahl, J.1
Voß, S.2
Woodruff, D.L.3
-
11
-
-
0032638699
-
Production planning using a hybrid simulation-analytical approach
-
Mar.
-
M. D. Byrne and M. A. Bakir, "Production planning using a hybrid simulation-analytical approach," Int. J. Prod. Econ., vol. 59, nos. 1-3, pp. 305-311, Mar. 1999.
-
(1999)
Int. J. Prod. Econ.
, vol.59
, Issue.1-3
, pp. 305-311
-
-
Byrne, M.D.1
Bakir, M.A.2
-
12
-
-
9544247739
-
Production planning: An improved hybrid approach
-
Jan.
-
M. D. Byrne and M. M. Hossain, "Production planning: An improved hybrid approach," Int. J. Prod. Econ., vols. 93-94, no. 1, pp. 225-229, Jan. 2005.
-
(2005)
Int. J. Prod. Econ., vols.
, vol.93-94
, Issue.1
, pp. 225-229
-
-
Byrne, M.D.1
Hossain, M.M.2
-
13
-
-
85016055097
-
A production planning approach based on iterations of linear programming optimization and flow time prediction
-
Y. F. Hung and M. C. Hou, "A production planning approach based on iterations of linear programming optimization and flow time prediction," J. Chin. Instit. Ind. Engineers, vol. 18, no. 3, pp. 55-67, 2001.
-
(2001)
J. Chin. Instit. Ind. Engineers
, vol.18
, Issue.3
, pp. 55-67
-
-
Hung, Y.F.1
Hou, M.C.2
-
14
-
-
0030150549
-
A production planning methodology for semiconductor manufacturing based on iterative simulation and linear programming calculations
-
May
-
Y. F. Hung and R. C. Leachman, "A production planning methodology for semiconductor manufacturing based on iterative simulation and linear programming calculations," IEEE Trans. Semicond. Manuf., vol. 9, no. 2, pp. 257-269, May 1996.
-
(1996)
IEEE Trans. Semicond. Manuf.
, vol.9
, Issue.2
, pp. 257-269
-
-
Hung, Y.F.1
Leachman, R.C.2
-
15
-
-
0035929278
-
Extended model for a hybrid production planning approach
-
Sep.
-
B. Kim and S. Kim, "Extended model for a hybrid production planning approach," Int. J. Prod. Econ., vol. 73, no. 2, pp. 165-173, Sep. 2001.
-
(2001)
Int. J. Prod. Econ.
, vol.73
, Issue.2
, pp. 165-173
-
-
Kim, B.1
Kim, S.2
-
16
-
-
34250166922
-
-
Ph.D. thesis, School Ind. Syst. Eng., Georgia Instit. Technol., Atlanta, GA
-
G. Riano, "Transient behavior of stochastic networks: Application to production planning with load-dependent lead times," Ph.D. thesis, School Ind. Syst. Eng., Georgia Instit. Technol., Atlanta, GA, 2003.
-
(2003)
Transient Behavior of Stochastic Networks: Application to Production Planning with Load-Dependent Lead Times
-
-
Riano, G.1
-
17
-
-
77955435779
-
An exploratory analysis of two iterative linear programming-simulation approaches for production planning
-
Aug.
-
D. F. Irdem, N. B. Kacar, and R. Uzsoy, "An exploratory analysis of two iterative linear programming-simulation approaches for production planning," IEEE Trans. Semicond. Manuf., vol. 23, no. 3, pp. 442-455, Aug. 2010.
-
(2010)
IEEE Trans. Semicond. Manuf.
, vol.23
, Issue.3
, pp. 442-455
-
-
Irdem, D.F.1
Kacar, N.B.2
Uzsoy, R.3
-
18
-
-
63449135698
-
Production planning models with resources subject to congestion
-
Mar.
-
J. M. Asmundsson, R. L. Rardin, C. H. Turkseven, and R. Uzsoy, "Production planning models with resources subject to congestion," Naval Res. Logistics, vol. 56, no. 2, pp. 142-157, Mar. 2009.
-
(2009)
Naval Res. Logistics
, vol.56
, Issue.2
, pp. 142-157
-
-
Asmundsson, J.M.1
Rardin, R.L.2
Turkseven, C.H.3
Uzsoy, R.4
-
19
-
-
33144460387
-
Tractable nonlinear production planning models for semiconductor wafer fabrication facilities
-
Feb.
-
J. M. Asmundsson, R. L. Rardin, and R. Uzsoy, "Tractable nonlinear production planning models for semiconductor wafer fabrication facilities," IEEE Trans. Semicond. Manuf., vol. 19, no. 1, pp. 95-111, Feb. 2006.
-
(2006)
IEEE Trans. Semicond. Manuf.
, vol.19
, Issue.1
, pp. 95-111
-
-
Asmundsson, J.M.1
Rardin, R.L.2
Uzsoy, R.3
-
20
-
-
0000153439
-
Capacity loading and release planning with work-inprogress (WIP) and lead-times
-
U. S. Karmarkar, "Capacity loading and release planning with work-inprogress (WIP) and lead-times," J. Manuf. Oper. Manage., vol. 2, no. 2, pp. 105-123, 1989.
-
(1989)
J. Manuf. Oper. Manage.
, vol.2
, Issue.2
, pp. 105-123
-
-
Karmarkar, U.S.1
-
21
-
-
0037085145
-
Aggregate order release planning for time-varying demand
-
H. Missbauer, "Aggregate order release planning for time-varying demand," Int. J. Prod. Res., vol. 40, no. 3, pp. 699-718, 2002.
-
(2002)
Int. J. Prod. Res.
, vol.40
, Issue.3
, pp. 699-718
-
-
Missbauer, H.1
-
22
-
-
34547339167
-
Supply chain optimization and protocol environment (SCOPE) for rapid prototyping of supply chains
-
Jul.
-
S. Orcun, J. M. Asmundsson, J. F. Pekny, R. L. Rardin, and R. Uzsoy, "Supply chain optimization and protocol environment (SCOPE) for rapid prototyping of supply chains," Prod. Planning Control, vol. 18, no. 5, pp. 388-406, Jul. 2007.
-
(2007)
Prod. Planning Control
, vol.18
, Issue.5
, pp. 388-406
-
-
Orcun, S.1
Asmundsson, J.M.2
Pekny, J.F.3
Rardin, R.L.4
Uzsoy, R.5
-
23
-
-
38049000854
-
Work in process clearing in supply chain operations planning
-
B. Selçuk, J. C. Fransoo, and A. G. de Kok, "Work in process clearing in supply chain operations planning," IIE Trans., vol. 40, no. 3, pp. 206-220, 2007.
-
(2007)
IIE Trans.
, vol.40
, Issue.3
, pp. 206-220
-
-
Selçuk, B.1
Fransoo, J.C.2
De Kok, A.G.3
-
24
-
-
33144463228
-
-
Pittsburgh, PA: Graduate School of Industrial Administration, Carnegie-Mellon University
-
A. Srinivasan, M. Carey, and T. E. Morton, Resource Pricing and Aggregate Scheduling in Manufacturing Systems. Pittsburgh, PA: Graduate School of Industrial Administration, Carnegie-Mellon University, 1988.
-
(1988)
Resource Pricing and Aggregate Scheduling in Manufacturing Systems
-
-
Srinivasan, A.1
Carey, M.2
Morton, T.E.3
-
25
-
-
0031381458
-
Focusing maintenance improvement efforts in a wafer fabrication facility operating under theory of constraints
-
D. Kayton, T. Teyner, C. Schwartz, and R. Uzsoy, "Focusing maintenance improvement efforts in a wafer fabrication facility operating under theory of constraints," Prod. Inventory Manage., vol. 38, no. 4, pp. 51-57, 1997.
-
(1997)
Prod. Inventory Manage.
, vol.38
, Issue.4
, pp. 51-57
-
-
Kayton, D.1
Teyner, T.2
Schwartz, C.3
Uzsoy, R.4
-
26
-
-
0000204502
-
A general framework for modeling production
-
Apr.
-
S. T. Hackman and R. C. Leachman, "A general framework for modeling production," Manage. Sci., vol. 35, no. 4, pp. 478-495, Apr. 1989.
-
(1989)
Manage. Sci.
, vol.35
, Issue.4
, pp. 478-495
-
-
Hackman, S.T.1
Leachman, R.C.2
-
28
-
-
84858412713
-
Semiconductor production planning
-
P. M. Pardalos and M. G. C. Resende, Eds. New York: Oxford University Press
-
R. C. Leachman, "Semiconductor production planning," in Handbook of Applied Optimization, P. M. Pardalos and M. G. C. Resende, Eds. New York: Oxford University Press, 2001, pp. 746-762.
-
(2001)
Handbook of Applied Optimization
, pp. 746-762
-
-
Leachman, R.C.1
-
30
-
-
0034156160
-
A supply chain network model with base-stock control and service requirements
-
Mar.-Apr.
-
M. Ettl, G. E. Feigin, G. Y. Lin, and D. D. Yao, "A supply chain network model with base-stock control and service requirements," Oper. Res., vol. 48, no. 2, pp. 216-232, Mar.-Apr. 2000.
-
(2000)
Oper. Res.
, vol.48
, Issue.2
, pp. 216-232
-
-
Ettl, M.1
Feigin, G.E.2
Lin, G.Y.3
Yao, D.D.4
-
31
-
-
46149104332
-
-
Simon Graduate School Business Administration, Univ. Rochester, Rochester, NY
-
S. Kekre, "Some issues in job shop design," Simon Graduate School Business Administration, Univ. Rochester, Rochester, NY, 1984.
-
(1984)
Some Issues in Job Shop Design
-
-
Kekre, S.1
-
32
-
-
10444241127
-
Linear programming models with planned lead times for supply chain operations planning
-
Jun.
-
J. M. Spitter, C. A. J. Hurkens, A. G. de Kok, J. K. Lenstra, and E. G. Negenman, "Linear programming models with planned lead times for supply chain operations planning," Eur. J. Oper. Res., vol. 163, no. 3, pp. 706-720, Jun. 2005.
-
(2005)
Eur. J. Oper. Res.
, vol.163
, Issue.3
, pp. 706-720
-
-
Spitter, J.M.1
Hurkens, C.A.J.2
De Kok, A.G.3
Lenstra, J.K.4
Negenman, E.G.5
-
33
-
-
84858382867
-
-
Tech. Univ. Darmstadt, Darmstadt, Germany, Schriften zur quantitativen Betriebswirtschaftslehre
-
M. Lautenschläger and H. Stadtler, "Modeling lead times depending on capacity utilization," Tech. Univ. Darmstadt, Darmstadt, Germany, Schriften zur quantitativen Betriebswirtschaftslehre 98.9, 1998.
-
(1998)
Modeling Lead Times Depending on Capacity Utilization
, vol.98
, Issue.9
-
-
Lautenschläger, M.1
Stadtler, H.2
-
34
-
-
77955464969
-
Optimization models for production planning
-
K. G. Kempf, P. Keskinocak, and R. Uzsoy, Eds. New York: Springer
-
H. Missbauer and R. Uzsoy, "Optimization models for production planning," in Planning Production and Inventories in the Extended Enterprise: A State of the Art Handbook, K. G. Kempf, P. Keskinocak, and R. Uzsoy, Eds. New York: Springer, 2010, pp. 437-508.
-
(2010)
Planning Production and Inventories in the Extended Enterprise: A State of the Art Handbook
, pp. 437-508
-
-
Missbauer, H.1
Uzsoy, R.2
-
35
-
-
0022741221
-
A tactical planning model for a job shop
-
S. C. Graves, "A tactical planning model for a job shop," Oper. Res., vol. 34, no. 4, pp. 552-533, 1986.
-
(1986)
Oper. Res.
, vol.34
, Issue.4
, pp. 552-533
-
-
Graves, S.C.1
-
36
-
-
0002549571
-
On capacity modeling for production planning with alternative machine types
-
R. C. Leachman and T. F. Carmon, "On capacity modeling for production planning with alternative machine types," IIE Trans., vol. 24, no. 4, pp. 62-72, 1992.
-
(1992)
IIE Trans.
, vol.24
, Issue.4
, pp. 62-72
-
-
Leachman, R.C.1
Carmon, T.F.2
|