-
3
-
-
84952240555
-
A review of production planning and scheduling models in the semiconductor industry, part I: System characteristics, performance evaluation and production planning
-
Sep.
-
R. Uzsoy, C. Y. Lee, and L. A. Martin-Vega, "A review of production planning and scheduling models in the semiconductor industry, part I: System characteristics, performance evaluation and production planning," IIE Trans. Sched. Logis., vol.24, no.4, pp. 47-61, Sep. 1992.
-
(1992)
IIE Trans. Sched. Logis.
, vol.24
, Issue.4
, pp. 47-61
-
-
Uzsoy, R.1
Lee, C.Y.2
Martin-Vega, L.A.3
-
4
-
-
0030150549
-
A production planning methodology for semiconductor manufacturing based on iterative simulation and linear programming calculations
-
May
-
Y. F. Hung and R. C. Leachman, "A production planning methodology for semiconductor manufacturing based on iterative simulation and linear programming calculations," IEEE Trans. Semicond. Manuf., vol.9, no.2, pp. 257-269, May 1996.
-
(1996)
IEEE Trans. Semicond. Manuf.
, vol.9
, Issue.2
, pp. 257-269
-
-
Hung, Y.F.1
Leachman, R.C.2
-
5
-
-
85016055097
-
A production planning approach based on iterations of linear programming optimization and flow time prediction
-
Y. F. Hung and M. C. Hou, "A production planning approach based on iterations of linear programming optimization and flow time prediction," J. Chin. Inst. Ind. Eng., vol.18, no.3, pp. 55-67, 2001.
-
(2001)
J. Chin. Inst. Ind. Eng.
, vol.18
, Issue.3
, pp. 55-67
-
-
Hung, Y.F.1
Hou, M.C.2
-
6
-
-
0032638699
-
Production planning using a hybrid simulation-analytical approach
-
M. D. Byrne and M. A. Bakir, "Production planning using a hybrid simulation-analytical approach," Int. J. Prod. Econ., vol.59, nos. 1-3, pp. 305-311, 1999.
-
(1999)
Int. J. Prod. Econ.
, vol.59
, Issue.1-3
, pp. 305-311
-
-
Byrne, M.D.1
Bakir, M.A.2
-
7
-
-
9544247739
-
Production planning: An improved hybrid approach
-
Jan.
-
M. D. Byrne and M. M. Hossain, "Production planning: An improved hybrid approach," Int. J. Prod. Econ., vols. 93-94, pp. 225-229, Jan. 2005.
-
(2005)
Int. J. Prod. Econ.
, vol.93-94
, pp. 225-229
-
-
Byrne, M.D.1
Hossain, M.M.2
-
8
-
-
0035929278
-
Extended model for a hybrid production planning approach
-
B. Kim and S. Kim, "Extended model for a hybrid production planning approach," Int. J. Prod. Econ., vol.73, no.2, pp. 165-173, 2001.
-
(2001)
Int. J. Prod. Econ.
, vol.73
, Issue.2
, pp. 165-173
-
-
Kim, B.1
Kim, S.2
-
9
-
-
0031381458
-
Focusing maintenance improvement efforts in a wafer fabrication facility operating under theory of constraints
-
Oct.-Dec.
-
D. Kayton, T. Teyner, C. Schwartz, and R. Uzsoy, "Focusing maintenance improvement efforts in a wafer fabrication facility operating under theory of constraints," Prod. Invent. Manage., pp. 51-57, Oct.-Dec. 1997.
-
(1997)
Prod. Invent. Manage.
, pp. 51-57
-
-
Kayton, D.1
Teyner, T.2
Schwartz, C.3
Uzsoy, R.4
-
10
-
-
27944495605
-
Implementing global factory schedules in the face of stochastic disruptions
-
Feb.
-
A. Barua, R. Narasimhan, R. Uzsoy, and A. Upasani, "Implementing global factory schedules in the face of stochastic disruptions," Int. J. Prod. Res., vol.43, no.4, pp. 793-818, Feb. 2005.
-
(2005)
Int. J. Prod. Res.
, vol.43
, Issue.4
, pp. 793-818
-
-
Barua, A.1
Narasimhan, R.2
Uzsoy, R.3
Upasani, A.4
-
13
-
-
0000204502
-
A general framework for modeling production
-
S. T. Hackman and R. C. Leachman, "A general framework for modeling production," Manage. Sci., vol.35, no.4, pp. 478-495, 1989.
-
(1989)
Manage. Sci.
, vol.35
, Issue.4
, pp. 478-495
-
-
Hackman, S.T.1
Leachman, R.C.2
-
16
-
-
24144433223
-
Available to promise
-
Norwell, MA: Kluwer
-
M. Ball, C. Y. Chen, and Z. Y. Zhao, "Available to promise," in Handbook of Quantitative Supply Chain Analysis: Modeling in the EBusiness Era. Norwell, MA: Kluwer, 2004, pp. 447-484.
-
(2004)
Handbook of Quantitative Supply Chain Analysis: Modeling in the EBusiness Era
, pp. 447-484
-
-
Ball, M.1
Chen, C.Y.2
Zhao, Z.Y.3
-
18
-
-
63449135698
-
Production planning models with resources subject to congestion
-
J. M. Asmundsson, R. L. Rardin, C. H. Turkseven, and R. Uzsoy, "Production planning models with resources subject to congestion," Naval Res. Logis., vol.56, no.2, pp. 142-157, 2009.
-
(2009)
Naval Res. Logis.
, vol.56
, Issue.2
, pp. 142-157
-
-
Asmundsson, J.M.1
Rardin, R.L.2
Turkseven, C.H.3
Uzsoy, R.4
-
19
-
-
33144460387
-
Tractable nonlinear production planning models for semiconductor wafer fabrication facilities
-
Feb.
-
J. M. Asmundsson, R. L. Rardin, and R. Uzsoy, "Tractable nonlinear production planning models for semiconductor wafer fabrication facilities," IEEE Trans. Semicond. Manuf., vol.19, no.1, pp. 95-111, Feb. 2006.
-
(2006)
IEEE Trans. Semicond. Manuf.
, vol.19
, Issue.1
, pp. 95-111
-
-
Asmundsson, J.M.1
Rardin, R.L.2
Uzsoy, R.3
-
20
-
-
0000153439
-
Capacity loading and release planning with work-inprogress (WIP) and lead-times
-
U. S. Karmarkar, "Capacity loading and release planning with work-inprogress (WIP) and lead-times," J. Manuf. Oper. Manage., vol.2, no.2, pp. 105-123, 1989.
-
(1989)
J. Manuf. Oper. Manage.
, vol.2
, Issue.2
, pp. 105-123
-
-
Karmarkar, U.S.1
-
21
-
-
0037085145
-
Aggregate order release planning for time-varying demand
-
Feb.
-
H. Missbauer, "Aggregate order release planning for time-varying demand," Int. J. Prod. Res., vol.40, no.3, pp. 688-718, Feb. 2002.
-
(2002)
Int. J. Prod. Res.
, vol.40
, Issue.3
, pp. 688-718
-
-
Missbauer, H.1
-
22
-
-
10444241127
-
Linear programming models with planned lead times for supply chain operations planning
-
Jun.
-
J. M. Spitter, C. A. J. Hurkens, A. G. de Kok, J. K. Lenstra, and E. G. Negenman, "Linear programming models with planned lead times for supply chain operations planning," Eur. J. Oper. Res., vol.163, no.3, pp. 706-720, Jun. 2005.
-
(2005)
Eur. J. Oper. Res.
, vol.163
, Issue.3
, pp. 706-720
-
-
Spitter, J.M.1
Hurkens, C.A.J.2
De Kok, A.G.3
Lenstra, J.K.4
Negenman, E.G.5
-
23
-
-
12344293116
-
-
Dept. Business Admin. Econ. Law, Inst. Business Stud., Tech. Univ. Darmstadt, Darmstadt, Germany, Res. Rep. 9791
-
M. Lautenschläger and H. Stadtler, "Modeling lead times depending on capacity utilization," Dept. Business Admin. Econ. Law, Inst. Business Stud., Tech. Univ. Darmstadt, Darmstadt, Germany, Res. Rep. 9791, 1998.
-
(1998)
Modeling Lead Times Depending on Capacity Utilization
-
-
Lautenschläger, M.1
Stadtler, H.2
-
24
-
-
77955464969
-
Optimization models for production planning
-
K. G. Kempf, P. Keskinocak, and R. Uzsoy, Eds. Norwell, MA: Springer
-
H. Missbauer and R. Uzsoy, "Optimization models for production planning," in Planning Production and Inventories in the Extended Enterprise: A State of the Art Handbook, K. G. Kempf, P. Keskinocak, and R. Uzsoy, Eds. Norwell, MA: Springer, 2010.
-
(2010)
Planning Production and Inventories in the Extended Enterprise: A State of the Art Handbook
-
-
Missbauer, H.1
Uzsoy, R.2
-
25
-
-
29144447714
-
Production planning with load dependent lead times
-
J. Pahl, S. Voss, and D. L. Woodruff, "Production planning with load dependent lead times," 4OR: Quart. J. Oper. Res., vol.3, no.4, pp. 257-302, 2005.
-
(2005)
4OR: Quart. J. Oper. Res.
, vol.3
, Issue.4
, pp. 257-302
-
-
Pahl, J.1
Voss, S.2
Woodruff, D.L.3
-
26
-
-
34250195301
-
Production planning with load dependent lead times: An update of research
-
J. Pahl, S. Voss, and D. L. Woodruff, "Production planning with load dependent lead times: An update of research," Ann. Oper. Res., vol.153, no.1, pp. 297-345, 2007.
-
(2007)
Ann. Oper. Res.
, vol.153
, Issue.1
, pp. 297-345
-
-
Pahl, J.1
Voss, S.2
Woodruff, D.L.3
-
27
-
-
0002549571
-
On capacity modeling for production planning with alternative machine types
-
R. C. Leachman and T. F. Carmon, "On capacity modeling for production planning with alternative machine types," IIE Trans., vol.24, no.4, pp. 62-72, 1992.
-
(1992)
IIE Trans.
, vol.24
, Issue.4
, pp. 62-72
-
-
Leachman, R.C.1
Carmon, T.F.2
-
28
-
-
34250166922
-
-
Ph.D. dissertation, School Ind. Syst. Eng., Georgia Inst. Technol., Atlanta
-
G. Riaño, "Transient behavior of stochastic networks: Application to production planning with load-dependent lead times," Ph.D. dissertation, School Ind. Syst. Eng., Georgia Inst. Technol., Atlanta, 2003.
-
(2003)
Transient Behavior of Stochastic Networks: Application to Production Planning with Load-dependent Lead Times
-
-
Riaño, G.1
|