Volumn 23, Issue 3, 2010, Pages 442-455

An exploratory analysis of two iterative linear programming-simulation approaches for production planning

Author keywords

Flow times; linear programming (LP); production planning; simulation

Indexed keywords

COMPUTATIONAL EXPERIMENT; CONVERGENCE BEHAVIORS; CYCLE TIME; EXPLORATORY ANALYSIS; FINISHED PRODUCTS; FLOW TIME; FLOW TIMES; IMPROVED ALGORITHM; LINEAR PROGRAMMING MODELS; MEAN CYCLE TIME; OPTIMAL RELEASE; PRODUCTION FACILITY; PRODUCTION PLANNING; QUEUING MODELS; RESOURCE UTILIZATIONS; SIMULATION APPROACH; SIMULATION MODEL;

EID: 77955435779     PISSN: 08946507     EISSN: None     Source Type: Journal    
DOI: 10.1109/TSM.2010.2051751     Document Type: Article
Times cited : (51)

References (28)
  • 3
    • 84952240555 scopus 로고
    • A review of production planning and scheduling models in the semiconductor industry, part I: System characteristics, performance evaluation and production planning
    • Sep.
    • R. Uzsoy, C. Y. Lee, and L. A. Martin-Vega, "A review of production planning and scheduling models in the semiconductor industry, part I: System characteristics, performance evaluation and production planning," IIE Trans. Sched. Logis., vol.24, no.4, pp. 47-61, Sep. 1992.
    • (1992) IIE Trans. Sched. Logis. , vol.24 , Issue.4 , pp. 47-61
    • Uzsoy, R.1    Lee, C.Y.2    Martin-Vega, L.A.3
  • 4
    • 0030150549 scopus 로고    scopus 로고
    • A production planning methodology for semiconductor manufacturing based on iterative simulation and linear programming calculations
    • May
    • Y. F. Hung and R. C. Leachman, "A production planning methodology for semiconductor manufacturing based on iterative simulation and linear programming calculations," IEEE Trans. Semicond. Manuf., vol.9, no.2, pp. 257-269, May 1996.
    • (1996) IEEE Trans. Semicond. Manuf. , vol.9 , Issue.2 , pp. 257-269
    • Hung, Y.F.1    Leachman, R.C.2
  • 5
    • 85016055097 scopus 로고    scopus 로고
    • A production planning approach based on iterations of linear programming optimization and flow time prediction
    • Y. F. Hung and M. C. Hou, "A production planning approach based on iterations of linear programming optimization and flow time prediction," J. Chin. Inst. Ind. Eng., vol.18, no.3, pp. 55-67, 2001.
    • (2001) J. Chin. Inst. Ind. Eng. , vol.18 , Issue.3 , pp. 55-67
    • Hung, Y.F.1    Hou, M.C.2
  • 6
    • 0032638699 scopus 로고    scopus 로고
    • Production planning using a hybrid simulation-analytical approach
    • M. D. Byrne and M. A. Bakir, "Production planning using a hybrid simulation-analytical approach," Int. J. Prod. Econ., vol.59, nos. 1-3, pp. 305-311, 1999.
    • (1999) Int. J. Prod. Econ. , vol.59 , Issue.1-3 , pp. 305-311
    • Byrne, M.D.1    Bakir, M.A.2
  • 7
    • 9544247739 scopus 로고    scopus 로고
    • Production planning: An improved hybrid approach
    • Jan.
    • M. D. Byrne and M. M. Hossain, "Production planning: An improved hybrid approach," Int. J. Prod. Econ., vols. 93-94, pp. 225-229, Jan. 2005.
    • (2005) Int. J. Prod. Econ. , vol.93-94 , pp. 225-229
    • Byrne, M.D.1    Hossain, M.M.2
  • 8
    • 0035929278 scopus 로고    scopus 로고
    • Extended model for a hybrid production planning approach
    • B. Kim and S. Kim, "Extended model for a hybrid production planning approach," Int. J. Prod. Econ., vol.73, no.2, pp. 165-173, 2001.
    • (2001) Int. J. Prod. Econ. , vol.73 , Issue.2 , pp. 165-173
    • Kim, B.1    Kim, S.2
  • 9
    • 0031381458 scopus 로고    scopus 로고
    • Focusing maintenance improvement efforts in a wafer fabrication facility operating under theory of constraints
    • Oct.-Dec.
    • D. Kayton, T. Teyner, C. Schwartz, and R. Uzsoy, "Focusing maintenance improvement efforts in a wafer fabrication facility operating under theory of constraints," Prod. Invent. Manage., pp. 51-57, Oct.-Dec. 1997.
    • (1997) Prod. Invent. Manage. , pp. 51-57
    • Kayton, D.1    Teyner, T.2    Schwartz, C.3    Uzsoy, R.4
  • 10
    • 27944495605 scopus 로고    scopus 로고
    • Implementing global factory schedules in the face of stochastic disruptions
    • Feb.
    • A. Barua, R. Narasimhan, R. Uzsoy, and A. Upasani, "Implementing global factory schedules in the face of stochastic disruptions," Int. J. Prod. Res., vol.43, no.4, pp. 793-818, Feb. 2005.
    • (2005) Int. J. Prod. Res. , vol.43 , Issue.4 , pp. 793-818
    • Barua, A.1    Narasimhan, R.2    Uzsoy, R.3    Upasani, A.4
  • 13
    • 0000204502 scopus 로고
    • A general framework for modeling production
    • S. T. Hackman and R. C. Leachman, "A general framework for modeling production," Manage. Sci., vol.35, no.4, pp. 478-495, 1989.
    • (1989) Manage. Sci. , vol.35 , Issue.4 , pp. 478-495
    • Hackman, S.T.1    Leachman, R.C.2
  • 18
    • 63449135698 scopus 로고    scopus 로고
    • Production planning models with resources subject to congestion
    • J. M. Asmundsson, R. L. Rardin, C. H. Turkseven, and R. Uzsoy, "Production planning models with resources subject to congestion," Naval Res. Logis., vol.56, no.2, pp. 142-157, 2009.
    • (2009) Naval Res. Logis. , vol.56 , Issue.2 , pp. 142-157
    • Asmundsson, J.M.1    Rardin, R.L.2    Turkseven, C.H.3    Uzsoy, R.4
  • 19
    • 33144460387 scopus 로고    scopus 로고
    • Tractable nonlinear production planning models for semiconductor wafer fabrication facilities
    • Feb.
    • J. M. Asmundsson, R. L. Rardin, and R. Uzsoy, "Tractable nonlinear production planning models for semiconductor wafer fabrication facilities," IEEE Trans. Semicond. Manuf., vol.19, no.1, pp. 95-111, Feb. 2006.
    • (2006) IEEE Trans. Semicond. Manuf. , vol.19 , Issue.1 , pp. 95-111
    • Asmundsson, J.M.1    Rardin, R.L.2    Uzsoy, R.3
  • 20
    • 0000153439 scopus 로고
    • Capacity loading and release planning with work-inprogress (WIP) and lead-times
    • U. S. Karmarkar, "Capacity loading and release planning with work-inprogress (WIP) and lead-times," J. Manuf. Oper. Manage., vol.2, no.2, pp. 105-123, 1989.
    • (1989) J. Manuf. Oper. Manage. , vol.2 , Issue.2 , pp. 105-123
    • Karmarkar, U.S.1
  • 21
    • 0037085145 scopus 로고    scopus 로고
    • Aggregate order release planning for time-varying demand
    • Feb.
    • H. Missbauer, "Aggregate order release planning for time-varying demand," Int. J. Prod. Res., vol.40, no.3, pp. 688-718, Feb. 2002.
    • (2002) Int. J. Prod. Res. , vol.40 , Issue.3 , pp. 688-718
    • Missbauer, H.1
  • 22
    • 10444241127 scopus 로고    scopus 로고
    • Linear programming models with planned lead times for supply chain operations planning
    • Jun.
    • J. M. Spitter, C. A. J. Hurkens, A. G. de Kok, J. K. Lenstra, and E. G. Negenman, "Linear programming models with planned lead times for supply chain operations planning," Eur. J. Oper. Res., vol.163, no.3, pp. 706-720, Jun. 2005.
    • (2005) Eur. J. Oper. Res. , vol.163 , Issue.3 , pp. 706-720
    • Spitter, J.M.1    Hurkens, C.A.J.2    De Kok, A.G.3    Lenstra, J.K.4    Negenman, E.G.5
  • 23
    • 12344293116 scopus 로고    scopus 로고
    • Dept. Business Admin. Econ. Law, Inst. Business Stud., Tech. Univ. Darmstadt, Darmstadt, Germany, Res. Rep. 9791
    • M. Lautenschläger and H. Stadtler, "Modeling lead times depending on capacity utilization," Dept. Business Admin. Econ. Law, Inst. Business Stud., Tech. Univ. Darmstadt, Darmstadt, Germany, Res. Rep. 9791, 1998.
    • (1998) Modeling Lead Times Depending on Capacity Utilization
    • Lautenschläger, M.1    Stadtler, H.2
  • 25
    • 29144447714 scopus 로고    scopus 로고
    • Production planning with load dependent lead times
    • J. Pahl, S. Voss, and D. L. Woodruff, "Production planning with load dependent lead times," 4OR: Quart. J. Oper. Res., vol.3, no.4, pp. 257-302, 2005.
    • (2005) 4OR: Quart. J. Oper. Res. , vol.3 , Issue.4 , pp. 257-302
    • Pahl, J.1    Voss, S.2    Woodruff, D.L.3
  • 26
    • 34250195301 scopus 로고    scopus 로고
    • Production planning with load dependent lead times: An update of research
    • J. Pahl, S. Voss, and D. L. Woodruff, "Production planning with load dependent lead times: An update of research," Ann. Oper. Res., vol.153, no.1, pp. 297-345, 2007.
    • (2007) Ann. Oper. Res. , vol.153 , Issue.1 , pp. 297-345
    • Pahl, J.1    Voss, S.2    Woodruff, D.L.3
  • 27
    • 0002549571 scopus 로고
    • On capacity modeling for production planning with alternative machine types
    • R. C. Leachman and T. F. Carmon, "On capacity modeling for production planning with alternative machine types," IIE Trans., vol.24, no.4, pp. 62-72, 1992.
    • (1992) IIE Trans. , vol.24 , Issue.4 , pp. 62-72
    • Leachman, R.C.1    Carmon, T.F.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.