메뉴 건너뛰기




Volumn 40, Issue 3, 2008, Pages 206-220

Work-in-process clearing in supply chain operations planning

Author keywords

Clearing functions; Hierarchical planning; Planned lead times; Supply chain; Work in process

Indexed keywords

INVENTORY CONTROL; OPERATIONS RESEARCH; PLANNING; SCHEDULING; SUPPLY CHAINS;

EID: 38049000854     PISSN: 0740817X     EISSN: 15458830     Source Type: Journal    
DOI: 10.1080/07408170701487997     Document Type: Conference Paper
Times cited : (33)

References (29)
  • 4
    • 33144460387 scopus 로고    scopus 로고
    • Tractable nonlinear production planning models for semiconductor wafer fabrication facilities
    • Asmundsson, J. M., Rardin, R. L. and Uzsoy, R. (2006) Tractable nonlinear production planning models for semiconductor wafer fabrication facilities. IEEE Transactions on Semiconductor Maufacturing, 19:1, pp. 95-111.
    • (2006) IEEE Transactions on Semiconductor Maufacturing , vol.19 , Issue.1 , pp. 95-111
    • Asmundsson, J.M.1    Rardin, R.L.2    Uzsoy, R.3
  • 6
    • 0020832935 scopus 로고
    • Mathematical programming approaches to capacity constrained MRP systems: Review, formulation and problem reduction
    • Billington, P. J., McClain, J. O. and Thomas, L. J. (1983) Mathematical programming approaches to capacity constrained MRP systems: Review, formulation and problem reduction. Management Science, 29, pp. 1126-1141.
    • (1983) Management Science , vol.29 , pp. 1126-1141
    • Billington, P.J.1    McClain, J.O.2    Thomas, L.J.3
  • 7
    • 0001044028 scopus 로고
    • Planning horizons for master production scheduling
    • Chung, C. H. and Krajewski, L. J. (1984) Planning horizons for master production scheduling. Journal of Operations Management, 4:4, pp. 389-406.
    • (1984) Journal of Operations Management , vol.4 , Issue.4 , pp. 389-406
    • Chung, C.H.1    Krajewski, L.J.2
  • 9
    • 0022741221 scopus 로고
    • A tactical planning model for a job shop
    • Graves, S. C. (1986) A tactical planning model for a job shop. Operations Research, 34:4, pp. 522-533.
    • (1986) Operations Research , vol.34 , Issue.4 , pp. 522-533
    • Graves, S.C.1
  • 10
    • 0000204502 scopus 로고
    • A general framework for modeling production
    • Hackman, S. T. and Leachman, R. C. (1989) A general framework for modeling production. Management Science, 35:4, pp. 478-495.
    • (1989) Management Science , vol.35 , Issue.4 , pp. 478-495
    • Hackman, S.T.1    Leachman, R.C.2
  • 13
    • 0023310940 scopus 로고
    • Lot sizes, lead times and in-process inventories
    • Karmarkar, U. S. (1987) Lot sizes, lead times and in-process inventories. Management Science, 33:3, pp. 409-418.
    • (1987) Management Science , vol.33 , Issue.3 , pp. 409-418
    • Karmarkar, U.S.1
  • 14
    • 0000153439 scopus 로고
    • Capacity loading and release planning with work-in-progress (WIP) and leadtimes
    • Karmarkar, U. S. (1989) Capacity loading and release planning with work-in-progress (WIP) and leadtimes. Journal of Manufacturing Operations Management, 2, pp. 105-123.
    • (1989) Journal of Manufacturing Operations Management , vol.2 , pp. 105-123
    • Karmarkar, U.S.1
  • 17
    • 0030288024 scopus 로고    scopus 로고
    • A general approximation for the single product lot sizing model with queueing delays
    • Lambrecht, M. R. and Vandaele, N. J. (1996) A general approximation for the single product lot sizing model with queueing delays. European Journal of Operational Research, 95, pp. 73-88.
    • (1996) European Journal of Operational Research , vol.95 , pp. 73-88
    • Lambrecht, M.R.1    Vandaele, N.J.2
  • 19
    • 0037085145 scopus 로고    scopus 로고
    • Aggregate order release planning for time-varying demand
    • Missbauer, H. (2002) Aggregate order release planning for time-varying demand. International Journal of Production Research, 40:3, pp. 699-718.
    • (2002) Journal of Production Research , vol.40 , Issue.3 , pp. 699-718
    • Missbauer, H.1
  • 20
    • 38049075701 scopus 로고    scopus 로고
    • (2007)
    • (2007)
  • 21
    • 34250166922 scopus 로고    scopus 로고
    • Transient behavior of stochastic networks: Application to production planning with load dependent lead times
    • Ph.D. thesis. Georgia Institute of Technology, Atlanta, GA
    • Riaño, G. (2002) Transient behavior of stochastic networks: application to production planning with load dependent lead times, Ph.D. thesis. Georgia Institute of Technology, Atlanta, GA
    • (2002)
    • Riaño, G.1
  • 22
    • 0003039463 scopus 로고
    • Hierarchical structures in organizations: A conceptual framework
    • Schneeweiss, C. (1995) Hierarchical structures in organizations: A conceptual framework. European Journal of Operational Research, 86, pp. 4-31.
    • (1995) European Journal of Operational Research , vol.86 , pp. 4-31
    • Schneeweiss, C.1
  • 23
    • 33748747284 scopus 로고    scopus 로고
    • The effect of updating lead times on the performance of hierarchical planning systems
    • Selçuk, B., Fransoo, J. C. and De Kok, A. G. (2006) The effect of updating lead times on the performance of hierarchical planning systems. International Journal of Production Economics, 104:2, pp. 427-440.
    • (2006) International Journal of Production Economics , vol.104 , Issue.2 , pp. 427-440
    • Selçuk, B.1    Fransoo, J.C.2    De Kok, A.G.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.