메뉴 건너뛰기




Volumn 56, Issue 2, 2009, Pages 142-157

Production planning with resources subject to congestion

Author keywords

Clearing functions; Congestion; Mathematical programming; Production planning

Indexed keywords

CLEARING FUNCTIONS; COMPUTATIONAL EXPERIMENTS; CONGESTION; CONVENTIONAL MODELS; LEAD TIME; LINEAR PROGRAMMING FORMULATIONS; MATHEMATICAL PROGRAMMING MODELS; MULTI PRODUCTS; MULTI-STAGE SYSTEMS; NON-LINEAR MODELS; NONLINEAR DEPENDENCIES; PRODUCTION PLANNING; SINGLE STAGE SYSTEMS;

EID: 63449135698     PISSN: 0894069X     EISSN: 15206750     Source Type: Journal    
DOI: 10.1002/nav.20335     Document Type: Article
Times cited : (114)

References (36)
  • 1
    • 0016950777 scopus 로고
    • Dynamic modeling and control of some congestion prone systems
    • C. Agnew, Dynamic modeling and control of some congestion prone systems, Oper Res 24 (1976), 400-419.
    • (1976) Oper Res , vol.24 , pp. 400-419
    • Agnew, C.1
  • 2
    • 63449090176 scopus 로고    scopus 로고
    • Tractable supply chain production planning modeling nonlinear lead time and quality of service constraints
    • in press
    • O.M. Anli, M. Caramanis, and I.C. Paschalidis, Tractable supply chain production planning modeling nonlinear lead time and quality of service constraints, J Manufact Syst (in press).
    • J Manufact Syst
    • Anli, O.M.1    Caramanis, M.2    Paschalidis, I.C.3
  • 3
    • 33144460387 scopus 로고    scopus 로고
    • Tractable nonlinear production planning models for semiconductor wafer fabrication facilities
    • J.M. Asmundsson, R.L. Rardin, and R. Uzsoy, Tractable nonlinear production planning models for semiconductor wafer fabrication facilities, IEEE Trans Semiconductor Manufact 19 (2006), 95-111.
    • (2006) IEEE Trans Semiconductor Manufact , vol.19 , pp. 95-111
    • Asmundsson, J.M.1    Rardin, R.L.2    Uzsoy, R.3
  • 5
    • 0032638699 scopus 로고    scopus 로고
    • Production planning using a hybrid simulation-analytical approach
    • M.D. Byrne and M.A. Bakir, Production planning using a hybrid simulation-analytical approach, Int J Prod Econ 59 (1999), 305-311.
    • (1999) Int J Prod Econ , vol.59 , pp. 305-311
    • Byrne, M.D.1    Bakir, M.A.2
  • 6
    • 9544247739 scopus 로고    scopus 로고
    • Production planning: An improved hybrid approach
    • M.D. Byrne and M.M. Hossain, Production planning: An improved hybrid approach, Int J Prod Econ 93-94 (2005), 225-229.
    • (2005) Int J Prod Econ , vol.93-94 , pp. 225-229
    • Byrne, M.D.1    Hossain, M.M.2
  • 8
    • 0034156160 scopus 로고    scopus 로고
    • A supply chain network model with base-stock control and service requirements
    • M. Ettl, G. Feigin, G.Y. Lin, and D.D. Yao, A supply chain network model with base-stock control and service requirements, Oper Res 48 (2000), 216-232.
    • (2000) Oper Res , vol.48 , pp. 216-232
    • Ettl, M.1    Feigin, G.2    Lin, G.Y.3    Yao, D.D.4
  • 9
    • 0022741221 scopus 로고
    • A tactical planning model for a job shop
    • S.C. Graves, A tactical planning model for a job shop, Oper Res 34 (1986), 552-533.
    • (1986) Oper Res , vol.34 , pp. 552-533
    • Graves, S.C.1
  • 10
    • 0000204502 scopus 로고
    • A general framework for modeling production
    • S.T. Hackman and R.C. Leachman, A general framework for modeling production, Management Sci 35 (1989), 478-495.
    • (1989) Management Sci , vol.35 , pp. 478-495
    • Hackman, S.T.1    Leachman, R.C.2
  • 14
    • 0030150549 scopus 로고    scopus 로고
    • A production planning methodology for semiconductor manufacturing based on iterative simulation and linear programming calculations
    • Y.F. Hung and R.C. Leachman, A production planning methodology for semiconductor manufacturing based on iterative simulation and linear programming calculations, IEEE Trans Semiconductor Manufact 9 (1996), 257-269.
    • (1996) IEEE Trans Semiconductor Manufact , vol.9 , pp. 257-269
    • Hung, Y.F.1    Leachman, R.C.2
  • 15
    • 63449099115 scopus 로고    scopus 로고
    • A single stage multi-product dynamic lotsizingmodelwithworkinprocessandcongestion
    • Laboratory for Extended Enterprises at Purdue, School of Industrial Engineering, Purdue University, West Lafayette, IN
    • S. Hwang and R. Uzsoy, A single stage multi-product dynamic lotsizingmodelwithworkinprocessandcongestion,Research Report, Laboratory for Extended Enterprises at Purdue, School of Industrial Engineering, Purdue University, West Lafayette, IN, 2005.
    • (2005) Research Report
    • Hwang, S.1    Uzsoy, R.2
  • 16
    • 60749134984 scopus 로고    scopus 로고
    • D.F. Irdem, N.B. Kacar, and R. Uzsoy, An experimental study of an iterative simulation-optimization algorithm for production planning, Winter Simulation Conference, S.J. Mason, R. Hill, L. Moench, and O. Rose, Miami, FL, 2008.
    • D.F. Irdem, N.B. Kacar, and R. Uzsoy, "An experimental study of an iterative simulation-optimization algorithm for production planning," Winter Simulation Conference, S.J. Mason, R. Hill, L. Moench, and O. Rose, Miami, FL, 2008.
  • 18
    • 0000153439 scopus 로고
    • Capacity loading and release planning with work-in-progress (WIP) and lead-times
    • U.S. Karmarkar, Capacity loading and release planning with work-in-progress (WIP) and lead-times, J Manufact Oper Management 2 (1989), 105-123.
    • (1989) J Manufact Oper Management , vol.2 , pp. 105-123
    • Karmarkar, U.S.1
  • 19
    • 77950506731 scopus 로고    scopus 로고
    • U.S. Karmarkar, Manufacturing lead-times, order release and capacity loading, Handbooks in operations research & management science 4: Logistics of production and inventory, S.C. Graves, A.H.G. Rinnooy Kan, and P.H. Zipkin, 1993.
    • U.S. Karmarkar, "Manufacturing lead-times, order release and capacity loading," Handbooks in operations research & management science Vol. 4: Logistics of production and inventory, S.C. Graves, A.H.G. Rinnooy Kan, and P.H. Zipkin, 1993.
  • 20
    • 0022128589 scopus 로고
    • Lotsizing in multi- machine job shops
    • U.S. Karmarkar, S. Kekre, and S. Kekre, Lotsizing in multi- machine job shops, IIE Trans 13 (1985), 290-298.
    • (1985) IIE Trans , vol.13 , pp. 290-298
    • Karmarkar, U.S.1    Kekre, S.2    Kekre, S.3
  • 21
    • 46149104332 scopus 로고
    • Simon Graduate School of Business Administration, University of Rochester, Rochester, NY
    • S. Kekre, Some issues in job shop design, Simon Graduate School of Business Administration, University of Rochester, Rochester, NY, 1984.
    • (1984) Some issues in job shop design
    • Kekre, S.1
  • 22
    • 0035929278 scopus 로고    scopus 로고
    • Extended model for a hybrid production planning approach
    • B. Kim and S. Kim, Extended model for a hybrid production planning approach, Int J Prod Econ 73 (2001), 165-173.
    • (2001) Int J Prod Econ , vol.73 , pp. 165-173
    • Kim, B.1    Kim, S.2
  • 23
    • 12344293116 scopus 로고    scopus 로고
    • Modelling lead times depending on capacity utilization
    • Technische Universitat Darmstadt
    • M. Lautenschlager and H. Stadtler, Modelling lead times depending on capacity utilization, Research Report, Technische Universitat Darmstadt, 1998.
    • (1998) Research Report
    • Lautenschlager, M.1    Stadtler, H.2
  • 25
    • 0037085145 scopus 로고    scopus 로고
    • Aggregate order release planning for time- varying demand
    • H. Missbauer, Aggregate order release planning for time- varying demand, Int J Prod Res 40 (2002), 688-718.
    • (2002) Int J Prod Res , vol.40 , pp. 688-718
    • Missbauer, H.1
  • 26
    • 63149176784 scopus 로고    scopus 로고
    • Order release planning with clearing functions: A queueing-theoretical analysis of the clearing function concept
    • Innsbruck, Austria
    • H. Missbauer, Order release planning with clearing functions: A queueing-theoretical analysis of the clearing function concept, 15th Inter Working Seminar Prod Econ, Innsbruck, Austria, 2008, pp. 301-313.
    • (2008) 15th Inter Working Seminar Prod Econ , pp. 301-313
    • Missbauer, H.1
  • 28
    • 29144447714 scopus 로고    scopus 로고
    • Production planning with load dependent lead times, 4OR: Quart
    • J. Pahl, S. Voss, and D.L. Woodruff, Production planning with load dependent lead times, 4OR: Quart J Oper Res 3 (2005), 257-302.
    • (2005) J Oper Res , vol.3 , pp. 257-302
    • Pahl, J.1    Voss, S.2    Woodruff, D.L.3
  • 29
    • 63449139372 scopus 로고    scopus 로고
    • A.A.B. Pritsker and K. Snyder, Production scheduling using FACTOR, The planning and scheduling of production systems, A. Artiba and S.E. Elmaghraby, Chapman and Hall, 1997.
    • A.A.B. Pritsker and K. Snyder, "Production scheduling using FACTOR," The planning and scheduling of production systems, A. Artiba and S.E. Elmaghraby, Chapman and Hall, 1997.
  • 32
    • 0026208470 scopus 로고
    • An analytic congestion model for closed production systems with IFR processing times
    • M.L. Spearman, An analytic congestion model for closed production systems with IFR processing times, Management Sci 37 (1991), 1015-1029.
    • (1991) Management Sci , vol.37 , pp. 1015-1029
    • Spearman, M.L.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.