-
1
-
-
18744393158
-
Optimization algorithm for selection and on site location of mobile cranes
-
Al-Hussein, M., Alkass, S., and Moselhi, O. (2005). "Optimization algorithm for selection and on site location of mobile cranes." J.Constr.Eng.Manage., 131(5), 579-590.
-
(2005)
J.Constr.Eng.Manage.
, vol.131
, Issue.5
, pp. 579-590
-
-
Al-Hussein, M.1
Alkass, S.2
Moselhi, O.3
-
4
-
-
18144425787
-
Collision free path planning of cooperative crane manipulators using genetic algorithm
-
Deen Ali, M. S. A., Babu, N. R., and Varghese, K. (2005). "Collision free path planning of cooperative crane manipulators using genetic algorithm." J.Comput.Civ.Eng., 19(2), 182-193.
-
(2005)
J.Comput.Civ.Eng.
, vol.19
, Issue.2
, pp. 182-193
-
-
Deen Ali, M.S.A.1
Babu, N.R.2
Varghese, K.3
-
6
-
-
0033315084
-
Simphony: An environment for building special purpose construction simulation tools
-
Hajjar, D., and AbouRizk, S. M. (1999). "Simphony: an environment for building special purpose construction simulation tools." Winter Simulation Conference Proceedings, 2, 998-1006.
-
(1999)
Winter Simulation Conference Proceedings
, vol.2
, pp. 998-1006
-
-
Hajjar, D.1
Abourizk, S.M.2
-
7
-
-
0027662820
-
Computer-aided planning for heavy lifts
-
Hornaday, W. C., Haas, C. T., and O'Connor, J. T. (1993). "Computer-aided planning for heavy lifts." J.Constr.Eng.Manage., 119(3), 498-515.
-
(1993)
J.Constr.Eng.Manage.
, vol.119
, Issue.3
, pp. 498-515
-
-
Hornaday, W.C.1
Haas, C.T.2
O'connor, J.T.3
-
8
-
-
0000597359
-
Multiple heavy lifts optimization
-
Lin, K., and Haas, C. T. (1996). "Multiple heavy lifts optimization." J.Constr.Eng.Manage., 122(4), 354-362.
-
(1996)
J.Constr.Eng.Manage.
, vol.122
, Issue.4
, pp. 354-362
-
-
Lin, K.1
Haas, C.T.2
-
9
-
-
58849166130
-
A computer-aided heavy lift planning model
-
Mahalingam, A., Nair, H. S., and Varghese, K. (2000). "A computer-aided heavy lift planning model." Computing in Civil and Building Engineering, 2, 996-1003.
-
(2000)
Computing in Civil and Building Engineering
, vol.2
, pp. 996-1003
-
-
Mahalingam, A.1
Nair, H.S.2
Varghese, K.3
-
10
-
-
34248995496
-
Simulation-based scheduling of module assembly yards: Case study
-
Mohamed, Y., Borrego, D., Francisco, L., Al-Hussein, M., Abourizk, S., and Hermann, U. (2007). "Simulation-based scheduling of module assembly yards: Case study." Engineering, Construction and Architectural Management, 14(3), 293-311.
-
(2007)
Engineering, Construction and Architectural Management
, vol.14
, Issue.3
, pp. 293-311
-
-
Mohamed, Y.1
Borrego, D.2
Francisco, L.3
Al-Hussein, M.4
Abourizk, S.5
Hermann, U.6
-
11
-
-
9444220205
-
Innovative 3D-modelling for selecting and locating mobile cranes
-
Moselhi, O., Alkass, S., and Al-Hussein, M. (2004). "Innovative 3D-modelling for selecting and locating mobile cranes." Eng., Constr. and Archit. Manage, 11(5), 373-380.
-
(2004)
Eng., Constr. and Archit. Manage
, vol.11
, Issue.5
, pp. 373-380
-
-
Moselhi, O.1
Alkass, S.2
Al-Hussein, M.3
-
12
-
-
60749122318
-
A framework for simulating industrial construction processes
-
Sadeghi, N., and Fayek, A. R. (2008). "A framework for simulating industrial construction processes." Winter Simulation Conference, 2396-2401.
-
(2008)
Winter Simulation Conference
, pp. 2396-2401
-
-
Sadeghi, N.1
Fayek, A.R.2
-
13
-
-
0005736484
-
Culture of using mobile cranes for building construction
-
Shapira, A., and Glascock, J. D. (1996). "Culture of using mobile cranes for building construction." J.Constr.Eng.Manage., 122(4), 298-307.
-
(1996)
J.Constr.Eng.Manage.
, vol.122
, Issue.4
, pp. 298-307
-
-
Shapira, A.1
Glascock, J.D.2
-
14
-
-
33744546468
-
A virtual shop modeling system for industrial fabrication shops
-
Song, L., Wang, P., and AbouRizk, S. (2006). "A virtual shop modeling system for industrial fabrication shops." Simulation Modelling Practice and Theory, 14(5), 649-662.
-
(2006)
Simulation Modelling Practice and Theory
, vol.14
, Issue.5
, pp. 649-662
-
-
Song, L.1
Wang, P.2
Abourizk, S.3
-
15
-
-
69949090029
-
Integrated simulation-based scheduling for module assembly yard
-
Taghaddos, H., AbouRizk, S. M., Mohamed, Y., and Hermann, U. (2009). "Integrated simulation-based scheduling for module assembly yard." Proceedings of the 2009 Construction Research Congress, 1270-1279.
-
(2009)
Proceedings of the 2009 Construction Research Congress
, pp. 1270-1279
-
-
Taghaddos, H.1
Abourizk, S.M.2
Mohamed, Y.3
Hermann, U.4
-
16
-
-
63049083912
-
Simulation-based resource leveling in multi-project construction
-
GC4241-GC42410
-
Taghaddos, H., AbouRizk, S. M., Mohamed, Y., and Hermann, U. (2008). "Simulation-Based Resource Leveling in Multi-Project Construction." Proceedings, Annual Conference - Canadian Society for Civil Engineering 1, GC4241-GC42410.
-
(2008)
Proceedings, Annual Conference - Canadian Society for Civil Engineering 1
-
-
Taghaddos, H.1
Abourizk, S.M.2
Mohamed, Y.3
Hermann, U.4
-
17
-
-
37249020345
-
Simulation-based identification of possible locations for mobile cranes on construction sites
-
Tantisevi, K., and Akinci, B. (2008). "Simulation-based identification of possible locations for mobile cranes on construction sites." J.Comput.Civ.Eng., 22(1), 21-30.
-
(2008)
J.Comput.Civ.Eng.
, vol.22
, Issue.1
, pp. 21-30
-
-
Tantisevi, K.1
Akinci, B.2
-
18
-
-
0030846957
-
A heavy lift planning system for crane lifts
-
Varghese, K., Dharwadkar, P., Wolfhope, J., and O'Connor, J. T. (1997). "A heavy lift planning system for crane lifts." Microcomput.Civil Eng., 12(1), 31-42.
-
(1997)
Microcomput.Civil Eng.
, vol.12
, Issue.1
, pp. 31-42
-
-
Varghese, K.1
Dharwadkar, P.2
Wolfhope, J.3
O'connor, J.T.4
-
19
-
-
70349320487
-
Flow production of pipe spool fabrication: Simulation to support implementation of lean technique
-
Wang, P., Mohamed, Y., Abourizk, S. M., and Rawa, A. R. T. (2009). "Flow production of pipe spool fabrication: Simulation to support implementation of lean technique." J.Constr.Eng.Manage., 135(10), 1027-1038.
-
(2009)
J.Constr.Eng.Manage.
, vol.135
, Issue.10
, pp. 1027-1038
-
-
Wang, P.1
Mohamed, Y.2
Abourizk, S.M.3
Rawa, A.R.T.4
|