Simulation-based multiple heavy lift planning in industrial construction

Author keywords

Heavy lift planning; Mobile crane; Modular construction; Schedule; Simulation

Indexed keywords

ALBERTA , CANADA; COMPLEX PROCESSES; HEAVY LIFTS; HEAVY-LIFT PLANNING; INDUSTRIAL CONSTRUCTION; MOBILE CRANES; PLANNING SYSTEMS; PROJECT MANAGERS; SCHEDULE; SIGNIFICANT IMPACTS; SIMULATION; SIMULATION-BASED; SITE CONSTRUCTION; STORAGE AREA; TOTAL COSTS;

EID: 77956303933     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1061/41109(373)35     Document Type: Conference Paper
Times cited : (20)

References (21)
  • 1
    • 18744393158 scopus 로고    scopus 로고
    • Optimization algorithm for selection and on site location of mobile cranes
    • Al-Hussein, M., Alkass, S., and Moselhi, O. (2005). "Optimization algorithm for selection and on site location of mobile cranes." J.Constr.Eng.Manage., 131(5), 579-590.
    • (2005) J.Constr.Eng.Manage. , vol.131 , Issue.5 , pp. 579-590
    • Al-Hussein, M.1    Alkass, S.2    Moselhi, O.3
  • 4
    • 18144425787 scopus 로고    scopus 로고
    • Collision free path planning of cooperative crane manipulators using genetic algorithm
    • Deen Ali, M. S. A., Babu, N. R., and Varghese, K. (2005). "Collision free path planning of cooperative crane manipulators using genetic algorithm." J.Comput.Civ.Eng., 19(2), 182-193.
    • (2005) J.Comput.Civ.Eng. , vol.19 , Issue.2 , pp. 182-193
    • Deen Ali, M.S.A.1    Babu, N.R.2    Varghese, K.3
  • 6
    • 0033315084 scopus 로고    scopus 로고
    • Simphony: An environment for building special purpose construction simulation tools
    • Hajjar, D., and AbouRizk, S. M. (1999). "Simphony: an environment for building special purpose construction simulation tools." Winter Simulation Conference Proceedings, 2, 998-1006.
    • (1999) Winter Simulation Conference Proceedings , vol.2 , pp. 998-1006
    • Hajjar, D.1    Abourizk, S.M.2
  • 7
  • 8
    • 0000597359 scopus 로고    scopus 로고
    • Multiple heavy lifts optimization
    • Lin, K., and Haas, C. T. (1996). "Multiple heavy lifts optimization." J.Constr.Eng.Manage., 122(4), 354-362.
    • (1996) J.Constr.Eng.Manage. , vol.122 , Issue.4 , pp. 354-362
    • Lin, K.1    Haas, C.T.2
  • 11
    • 9444220205 scopus 로고    scopus 로고
    • Innovative 3D-modelling for selecting and locating mobile cranes
    • Moselhi, O., Alkass, S., and Al-Hussein, M. (2004). "Innovative 3D-modelling for selecting and locating mobile cranes." Eng., Constr. and Archit. Manage, 11(5), 373-380.
    • (2004) Eng., Constr. and Archit. Manage , vol.11 , Issue.5 , pp. 373-380
    • Moselhi, O.1    Alkass, S.2    Al-Hussein, M.3
  • 12
    • 60749122318 scopus 로고    scopus 로고
    • A framework for simulating industrial construction processes
    • Sadeghi, N., and Fayek, A. R. (2008). "A framework for simulating industrial construction processes." Winter Simulation Conference, 2396-2401.
    • (2008) Winter Simulation Conference , pp. 2396-2401
    • Sadeghi, N.1    Fayek, A.R.2
  • 13
    • 0005736484 scopus 로고    scopus 로고
    • Culture of using mobile cranes for building construction
    • Shapira, A., and Glascock, J. D. (1996). "Culture of using mobile cranes for building construction." J.Constr.Eng.Manage., 122(4), 298-307.
    • (1996) J.Constr.Eng.Manage. , vol.122 , Issue.4 , pp. 298-307
    • Shapira, A.1    Glascock, J.D.2
  • 14
    • 33744546468 scopus 로고    scopus 로고
    • A virtual shop modeling system for industrial fabrication shops
    • Song, L., Wang, P., and AbouRizk, S. (2006). "A virtual shop modeling system for industrial fabrication shops." Simulation Modelling Practice and Theory, 14(5), 649-662.
    • (2006) Simulation Modelling Practice and Theory , vol.14 , Issue.5 , pp. 649-662
    • Song, L.1    Wang, P.2    Abourizk, S.3
  • 17
    • 37249020345 scopus 로고    scopus 로고
    • Simulation-based identification of possible locations for mobile cranes on construction sites
    • Tantisevi, K., and Akinci, B. (2008). "Simulation-based identification of possible locations for mobile cranes on construction sites." J.Comput.Civ.Eng., 22(1), 21-30.
    • (2008) J.Comput.Civ.Eng. , vol.22 , Issue.1 , pp. 21-30
    • Tantisevi, K.1    Akinci, B.2
  • 19
    • 70349320487 scopus 로고    scopus 로고
    • Flow production of pipe spool fabrication: Simulation to support implementation of lean technique
    • Wang, P., Mohamed, Y., Abourizk, S. M., and Rawa, A. R. T. (2009). "Flow production of pipe spool fabrication: Simulation to support implementation of lean technique." J.Constr.Eng.Manage., 135(10), 1027-1038.
    • (2009) J.Constr.Eng.Manage. , vol.135 , Issue.10 , pp. 1027-1038
    • Wang, P.1    Mohamed, Y.2    Abourizk, S.M.3    Rawa, A.R.T.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.