메뉴 건너뛰기




Volumn 132, Issue 3, 2006, Pages 291-299

Application of lean concepts and simulation analysis to improve efficiency of drainage operations maintenance crews

Author keywords

Canada; Drainage systems; Maintenance; Productivity; Simulation; Time factors

Indexed keywords

COMPUTER SIMULATION; MAINTENANCE; PERSONNEL; PRODUCTIVITY; SCHEDULING;

EID: 32944462702     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0733-9364(2006)132:3(291)     Document Type: Article
Times cited : (36)

References (27)
  • 1
    • 0034227963 scopus 로고    scopus 로고
    • Application framework for development of simulation tools
    • AbouRizk, S. M., and Hajjar, D. (2000). " Application framework for development of simulation tools.. " J. Comput. Civ. Eng., 14 (3), 160-167.
    • (2000) J. Comput. Civ. Eng. , vol.14 , Issue.3 , pp. 160-167
    • Abourizk, S.M.1    Hajjar, D.2
  • 2
    • 84876823885 scopus 로고
    • State of the art in construction simulation
    • J. J.Swain, D.Goldsman, R. C.Crain, and J. R.Wilson, eds., Arlington, Va.
    • AbouRizk, S. M., Halpin, D. W., and Lutz, J. D. (1992). " State of the art in construction simulation.. " Proc., 1992 Winter Simulation Conf., J. J. Swain, D. Goldsman, R. C. Crain, and, J. R. Wilson, eds., Arlington, Va., 1271-1277.
    • (1992) Proc., 1992 Winter Simulation Conf. , pp. 1271-1277
    • Abourizk, S.M.1    Halpin, D.W.2    Lutz, J.D.3
  • 3
    • 0034430715 scopus 로고    scopus 로고
    • Simphony-an integrated environment for construction simulation
    • J. A.Joines, R. R.Barton, K.Kang, and P. A.Fishwick, eds.
    • AbouRizk, S. M., and Mohamed, Y. (2000). " Simphony-an integrated environment for construction simulation.. " Proc., 2000 Winter Simulation Conf., J. A. Joines, R. R. Barton, K. Kang, and, P. A. Fishwick, eds., 1907-1914.
    • (2000) Proc., 2000 Winter Simulation Conf. , pp. 1907-1914
    • Abourizk, S.M.1    Mohamed, Y.2
  • 6
    • 1642563373 scopus 로고
    • Toward Construction JIT
    • Catholic Univ. of Chile, Santiago, Chile, and Balkema, Rotterdam, The Netherlands
    • Ballard, G., and Howell, G. (1995). " Toward Construction JIT.. " Lean construction, Luis Alarcon, School of Engineering, Catholic Univ. of Chile, Santiago, Chile, and Balkema, Rotterdam, The Netherlands, 291-300.
    • (1995) Lean Construction , pp. 291-300
    • Ballard, G.1    Howell, G.2
  • 7
    • 0030101893 scopus 로고    scopus 로고
    • A computer-aided system to improve production rates in construction
    • Civil-Comp Limited and Elsevier Science, U.K.
    • Christian, J., and Hachey, D. (1996). " A computer-aided system to improve production rates in construction.. " Advances in engineering software, Vol. 25, Civil-Comp Limited and Elsevier Science, U.K., 207-213.
    • (1996) Advances in Engineering Software , vol.25 , pp. 207-213
    • Christian, J.1    Hachey, D.2
  • 8
    • 1642440724 scopus 로고    scopus 로고
    • Continuous improvement in construction management and technologies: A practical case
    • Catholic Univ. of Chile, Santiago, Chile, and Balkema, Rotterdam, The Netherlands
    • De Solminihac, T. H., Bascunan, R., and Edwards, L. G. (1997). " Continuous improvement in construction management and technologies: A practical case.. " Lean construction, Luis Alarcon School of Engineering, Catholic Univ. of Chile, Santiago, Chile, and Balkema, Rotterdam, The Netherlands, 240-262.
    • (1997) Lean Construction , pp. 240-262
    • De Solminihac, T.H.1    Bascunan, R.2    Edwards, L.G.3
  • 9
    • 1642563388 scopus 로고
    • Work-measured labor standards: The state of the art
    • Dosset, R. J. (1995). " Work-measured labor standards: the state of the art.. " Indust. Eng., 21-24.
    • (1995) Indust. Eng. , pp. 21-24
    • Dosset, R.J.1
  • 10
    • 1642563390 scopus 로고    scopus 로고
    • Lean production productivity improvements for construction professions
    • Catholic Univ. of Chile, Santiago, Chile, and Balkema, Rotterdam, The Netherlands
    • Eaton, D. (1997). " Lean production productivity improvements for construction professions.. " Lean construction, Luis Alarcon School of Engineering, Catholic Univ. of Chile, Santiago, Chile, and Balkema, Rotterdam, The Netherlands, 279-290.
    • (1997) Lean Construction , pp. 279-290
    • Eaton, D.1
  • 11
    • 32944482280 scopus 로고    scopus 로고
    • Edmonton 2002 Update: Infrastructure Strategy.
    • Edmonton 2002 Update: Infrastructure Strategy. (2002). Office of Infrastructure for the City of Edmonton, Edmonton Alta., Canada.
    • (2002)
  • 12
    • 0032026375 scopus 로고    scopus 로고
    • A review of methods to estimate haul fleet production
    • Gransberg, D. D. (1998). " A review of methods to estimate haul fleet production.. " Cost Eng., 40 (3), 31-35.
    • (1998) Cost Eng. , vol.40 , Issue.3 , pp. 31-35
    • Gransberg, D.D.1
  • 13
    • 0001247217 scopus 로고    scopus 로고
    • What is lean construction
    • Lean Construction Institute, Berkeley, Calif.
    • Howell, G. A. (1999). " What is lean construction. ?" Proc., 7th Annual Conf. of the Int. Group for Lean Construction, IGLC-7, Lean Construction Institute, Berkeley, Calif., 1-10 〈 http://www. leanconstruction.org/ 〉 (Sept. 27, 2002).
    • (1999) Proc., 7th Annual Conf. of the Int. Group for Lean Construction, IGLC-7 , pp. 1-10
    • Howell, G.A.1
  • 14
    • 0031102091 scopus 로고    scopus 로고
    • Large wheel loaders vs. cable shovels
    • Hrebar, M. J. (1997). " Large wheel loaders vs. cable shovels.. " Min. Eng., 58-64.
    • (1997) Min. Eng. , pp. 58-64
    • Hrebar, M.J.1
  • 15
    • 0021493763 scopus 로고
    • Techniques for improving survey productivity
    • Kellie, A. C. (1984). " Techniques for improving survey productivity.. " Surveying Mapping, 247-252.
    • (1984) Surveying Mapping , pp. 247-252
    • Kellie, A.C.1
  • 16
    • 0002417754 scopus 로고    scopus 로고
    • Lean manufacturing of construction components
    • Catholic Univ. of Chile, Santiago, Chile, and Balkema, Rotterdam, The Netherlands
    • Koskela, L., and Leikas, J. (1997). " Lean manufacturing of construction components.. " Lean construction, Luis Alarcon School of Engineering, Catholic Univ. of Chile, Santiago, Chile, and Balkema, Rotterdam, The Netherlands, 263-272.
    • (1997) Lean Construction , pp. 263-272
    • Koskela, L.1    Leikas, J.2
  • 20
    • 1642440705 scopus 로고
    • Time study
    • G.Salvendy, ed., Chap., Wiley, New York
    • Niebel, B. W. (1982). " Time study.. " Handbook of industrial engineering, G. Salvendy, ed., Chap., Wiley, New York, 4.4.1-4.4.37.
    • (1982) Handbook of Industrial Engineering , pp. 441-4437
    • Niebel, B.W.1
  • 21
    • 1642481679 scopus 로고    scopus 로고
    • Time standards that make sense
    • Ousnamer, M. (2000). " Time standards that make sense.. " IIE Solutions, 28-32.
    • (2000) IIE Solutions , pp. 28-32
    • Ousnamer, M.1
  • 22
    • 1642440693 scopus 로고
    • Work standards: Establishment, documentation, usage, and maintenance
    • G.Salvendy, ed., Chap., Wiley, New York
    • Panico, J. A. (1982). " Work standards: Establishment, documentation, usage, and maintenance.. " Handbook of industrial engineering, G. Salvendy, ed., Chap., Wiley, New York, 4.1.1-4.1.25.
    • (1982) Handbook of Industrial Engineering , pp. 411-4125
    • Panico, J.A.1
  • 23
    • 0028732527 scopus 로고
    • Effects of design-integrated process planning on productivity in rebar placement
    • Salim, M., and Bernold, E. (1994). " Effects of design-integrated process planning on productivity in rebar placement.. " J. Constr. Eng. Manage., 120 (4), 720-738.
    • (1994) J. Constr. Eng. Manage. , vol.120 , Issue.4 , pp. 720-738
    • Salim, M.1    Bernold, E.2
  • 24
    • 0025694102 scopus 로고
    • Modeling construction labor productivity
    • Thomas, H. R., (1990). " Modeling construction labor productivity.. " J. Constr. Eng. Manage., 116 (4), 705-726.
    • (1990) J. Constr. Eng. Manage. , vol.116 , Issue.4 , pp. 705-726
    • Thomas, H.R.1
  • 25
    • 0002372299 scopus 로고    scopus 로고
    • Just-in-time concrete delivery: Mapping alternatives for vertical supply chain integration
    • Lean Construction Institute, Berkeley, Calif.
    • Tommelein, I., and Li, A. (1999). " Just-in-time concrete delivery: Mapping alternatives for vertical supply chain integration.. " Proc., 7th Ann. Conf. of the Int. Group for Lean Construction, IGLC-7, Lean Construction Institute, Berkeley, Calif., 97-108 〈 http://www.leanconstruction.org/ 〉 (Sept. 27, 2002).
    • (1999) Proc., 7th Ann. Conf. of the Int. Group for Lean Construction, IGLC-7 , pp. 97-108
    • Tommelein, I.1    Li, A.2
  • 26
    • 1642440703 scopus 로고    scopus 로고
    • More just-in-time: Location of buffers in structural steel supply and construction processes
    • Lean Construction Institute, Berkeley, Calif.
    • Tommelein, I., and Weissenberger, M. (1999). " More just-in-time: Location of buffers in structural steel supply and construction processes.. " Proc., 7th Ann. Conf. of the Int. Group for Lean Construction, IGLC-7, Lean Construction Institute, Berkeley, Calif., 109-120 〈 http://www.leanconstruction.org/ 〉 (Sept. 27, 2002).
    • (1999) Proc., 7th Ann. Conf. of the Int. Group for Lean Construction, IGLC-7 , pp. 109-120
    • Tommelein, I.1    Weissenberger, M.2
  • 27
    • 1642481678 scopus 로고    scopus 로고
    • Measuring maintenance
    • Westerkamp, T. A. (1999). " Measuring maintenance.. " IIE Solutions, 32-35.
    • (1999) IIE Solutions , pp. 32-35
    • Westerkamp, T.A.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.