메뉴 건너뛰기




Volumn 2, Issue , 2002, Pages 1704-1708

Optimal construction project planning

Author keywords

[No Author keywords available]

Indexed keywords

COMPUTER SIMULATION; COSTS; DECISION MAKING; FUZZY SETS; MARKOV PROCESSES; PROJECT MANAGEMENT; STATISTICAL METHODS; STRATEGIC PLANNING;

EID: 0036926538     PISSN: 02750708     EISSN: None     Source Type: Conference Proceeding    
DOI: None     Document Type: Conference Paper
Times cited : (21)

References (11)
  • 1
    • 0032072617 scopus 로고    scopus 로고
    • Factors of non-excusable delays that influence contractors' performance
    • Abd Majid, M.Z.A, and R. McCaffer. 1998. "Factors of Non-Excusable Delays that Influence Contractors' Performance." Journal of Management in Engineering, 14(3), 42-48.
    • (1998) Journal of Management in Engineering , vol.14 , Issue.3 , pp. 42-48
    • Abd Majid, M.Z.A.1    McCaffer, R.2
  • 4
    • 0034430715 scopus 로고    scopus 로고
    • Simphony - An integrated environment for construction simulation
    • Orlando, Florida
    • AbouRizk, S., and Y. Mohamed. 2000. "Simphony - An Integrated Environment for Construction Simulation." Proceedings of the WSC 2000, Orlando, Florida
    • (2000) Proceedings of the WSC 2000
    • AbouRizk, S.1    Mohamed, Y.2
  • 6
    • 0034227963 scopus 로고    scopus 로고
    • An application framework for the development of simulation tools
    • Hajjar, D., and S. M. AbouRizk. 2000. "An Application Framework for the Development of Simulation Tools." Journal of Computing in Civil Engineering, ASCE, 14(3), 160-167.
    • (2000) Journal of Computing in Civil Engineering, ASCE , vol.14 , Issue.3 , pp. 160-167
    • Hajjar, D.1    AbouRizk, S.M.2
  • 7
    • 0012299013 scopus 로고    scopus 로고
    • accessed on August 27
    • International Group for Lean Construction. 1999. 〈http://cic.vtt.fi/lean/index.htm〉 [accessed on August 27, 2001].
    • (1999)
  • 11
    • 0000012732 scopus 로고    scopus 로고
    • Pull-driven scheduling for pipe-spool installation: Simulation of lean construction technique
    • Tommelein, I.D. 1998. "Pull-driven Scheduling for Pipe-Spool Installation: Simulation of Lean Construction Technique.", Journal of Construction Engineering and Management, ASCE, 124 (4) 279-288.
    • (1998) Journal of Construction Engineering and Management, ASCE , vol.124 , Issue.4 , pp. 279-288
    • Tommelein, I.D.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.