메뉴 건너뛰기




Volumn 3, Issue , 1999, Pages 95-105

CAD-based integrated simulation environment

Author keywords

[No Author keywords available]

Indexed keywords

COMPUTER SIMULATION METHODS; CONCEPTUALIZATION; CONSTRUCTION PROCESSES; THREE DIMENSIONAL MODELING;

EID: 33645019803     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: None     Document Type: Conference Paper
Times cited : (2)

References (11)
  • 1
    • 0027662666 scopus 로고
    • Resource-oriented modeling and simulation in construction
    • ASCE, September
    • Dennis F. McCahill and Leonhard E. Bernold, "Resource-Oriented Modeling and Simulation in Construction." Journal of Construction Engineering and Management, ASCE, Vol. 119, No. 3, September 1993, 590-605.
    • (1993) Journal of Construction Engineering and Management , vol.119 , Issue.3 , pp. 590-605
    • McCahill, D.F.1    Bernold, L.E.2
  • 4
    • 0027148579 scopus 로고
    • A CAD-based construction simulation tool kit for construction planning
    • ASCE
    • Jeffrey F. Skolnick, "A CAD-Based Construction Simulation Tool Kit for Construction Planning." Computer in Civil Engineering, ASCE, 1993, 117-124.
    • (1993) Computer in Civil Engineering , pp. 117-124
    • Skolnick, J.F.1
  • 6
    • 0031621983 scopus 로고    scopus 로고
    • Utilization of 3-D graphical simulation with object-oriented product model for building construction process
    • Kenji Ito, "Utilization of 3-D Graphical Simulation with Object-Oriented Product Model for Building Construction Process", Computer in Civil Engineering, 1998, 73-83.
    • (1998) Computer in Civil Engineering , pp. 73-83
    • Ito, K.1
  • 7
    • 0000693991 scopus 로고    scopus 로고
    • Scheduling with computer-interpretable construction method models
    • December
    • Martin A. Fisher, Florian Aalami, "Scheduling with Computer-Interpretable Construction Method Models." Journal of Construction Engineering and Management, Vol. 122, No. 4, December 1996, 337-347.
    • (1996) Journal of Construction Engineering and Management , vol.122 , Issue.4 , pp. 337-347
    • Fisher, M.A.1    Aalami, F.2
  • 8
    • 0006444306 scopus 로고
    • ISICAD: Interactive system for integrating CAD and computer-based construction systems
    • Nabil A. Kartam, "ISICAD: Interactive System for Integrating CAD and Computer-Based Construction Systems." Microcomputers in Civil engineering 9, 1994, 41-51.
    • (1994) Microcomputers in Civil Engineering , vol.9 , pp. 41-51
    • Kartam, N.A.1
  • 9
    • 0029228038 scopus 로고
    • An object-oriented building model for CAD/schedule integration
    • ASCE, New York, N.Y., USA
    • Parmanand V. Dharwadkar and Thomas M. Gatton, "An Object-Oriented Building Model for CAD/Schedule Integration." Computer in Civil Engineering, ASCE, New York, N.Y., USA, 1995, 1248-1251.
    • (1995) Computer in Civil Engineering , pp. 1248-1251
    • Dharwadkar, P.V.1    Gatton, T.M.2
  • 10
    • 0032104987 scopus 로고    scopus 로고
    • A framework for applying simulation in the construction industry
    • S. AbouRizk, D. Hajjar, "A Framework for Applying Simulation in the Construction Industry", Canadian Journal of Civil Engineering, Volume 25, No. 3, 1998.
    • (1998) Canadian Journal of Civil Engineering , vol.25 , Issue.3
    • AbouRizk, S.1    Hajjar, D.2
  • 11
    • 0030706469 scopus 로고
    • Construction planning of hi-rise buildings object-oriented solid geometry model
    • Tang-Huang Nguyen, Amr A. Oloufa, "Construction Planning of Hi-Rise Buildings Object-Oriented Solid Geometry Model", Computing in Civil Engineering, 1995, 426-431.
    • (1995) Computing in Civil Engineering , pp. 426-431
    • Nguyen, T.-H.1    Oloufa, A.A.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.