-
1
-
-
0034322953
-
-
J. Constr. Eng. Manage., (6).
-
AbouRizk, S., and Mather, K. (2000). " Simplifying simulation modeling through integration with 3D CAD.." J. Constr. Eng. Manage., 126 (6), 475-483.
-
(2000)
Simplifying Simulation Modeling Through Integration with 3D CAD
, vol.126
, pp. 475-483
-
-
Abourizk, S.1
Mather, K.2
-
2
-
-
49749144397
-
-
Wiley, Hoboken, N.J..
-
Callahan, K., and Brooks, L. (2004). Essentials of strategic project management, Wiley, Hoboken, N.J., 15.
-
(2004)
Essentials of Strategic Project Management
, pp. 15
-
-
Callahan, K.1
Brooks, L.2
-
3
-
-
12444344998
-
-
Constr. Manage. Econom., (4).
-
El-Rayes, K., and Moselhi, O. (1998). " Resource-driven scheduling of repetitive activities.." Constr. Manage. Econom., 16 (4), 433-446.
-
(1998)
Resource-driven Scheduling of Repetitive Activities
, vol.16
, pp. 433-446
-
-
El-Rayes, K.1
Moselhi, O.2
-
4
-
-
0028452701
-
-
J. Constr. Eng. Manage., (2).
-
Farid, F., and Koning, T. (1994). " Simulation verifies queuing program for selecting loader-truck fleets.." J. Constr. Eng. Manage., 120 (2), 386-404.
-
(1994)
Simulation Verifies Queuing Program for Selecting Loader-truck Fleets
, vol.120
, pp. 386-404
-
-
Farid, F.1
Koning, T.2
-
5
-
-
0037242979
-
-
" Transport Reviews, (1).
-
Flyvbjerg, B., Holm, M., and Buhl, S. (2003). " How common and how large are cost overruns in transport infrastructure projects. ?" Transport Reviews, 23 (1), 71-88.
-
(2003)
How Common and How Large Are Cost Overruns in Transport Infrastructure Projects
, vol.23
, pp. 71-88
-
-
Flyvbjerg, B.1
Holm, M.2
Buhl, S.3
-
9
-
-
49749088887
-
-
Imaginethat Inc.. "Extend 5.0 software." 〈〉 (Feb. 14, 2006).
-
Imaginethat Inc. (2002). "Extend 5.0 software." 〈 http://www.imaginethatinc.com 〉 (Feb. 14, 2006).
-
(2002)
-
-
-
10
-
-
26444476414
-
-
" Autom. Constr., (1).
-
Lee, S., Pea-Mora, F., and Park, M. (2006). " Dynamic planning and control methodology for strategic and operational construction project management.." Autom. Constr., 15 (1), 84-97.
-
(2006)
Dynamic Planning and Control Methodology for Strategic and Operational Construction Project Management
, vol.15
, pp. 84-97
-
-
Lee, S.1
Pea-Mora, F.2
Park, M.3
-
11
-
-
0001446357
-
-
" Syst. Dyn. Rev., (3).
-
Lyneis, J. M., Cooper, K. G., and Els, S. A. (2001). " Strategic management of complex projects: A case study using system dynamics.." Syst. Dyn. Rev., 17 (3), 237-260.
-
(2001)
Strategic Management of Complex Projects: A Case Study Using System Dynamics
, vol.17
, pp. 237-260
-
-
Lyneis, J.M.1
Cooper, K.G.2
Els, S.A.3
-
12
-
-
0034761893
-
-
J. Syst. Softw., (3).
-
Martin, R., and Raffo, D. (2001). " Application of a hybrid process simulation model to a software development project.." J. Syst. Softw., 59 (3), 237-246.
-
(2001)
Application of A Hybrid Process Simulation Model to A Software Development Project
, vol.59
, pp. 237-246
-
-
Martin, R.1
Raffo, D.2
-
13
-
-
0031371933
-
-
State-based probabilistic scheduling using STROBOSCOPE's CPM add-on.", ASCE, Reston, Va..
-
Martinez, J. C., and Ioannou, P. G. (1997). " State-based probabilistic scheduling using STROBOSCOPE's CPM add-on.." Proc., Construction Congress V, ASCE, Reston, Va., 438-445.
-
(1997)
Proc., Construction Congress v
, pp. 438-445
-
-
Martinez, J.C.1
Ioannou, P.G.2
-
14
-
-
0028551963
-
-
State and resource based construction process simulation.", ASCE, New York.
-
Martinez, J. C., Ioannou, P. G., and Carr, R. I. (1994). " State and resource based construction process simulation.." Proc., Comp. in Civil Eng., ASCE, New York, 177-184.
-
(1994)
Proc., Comp. in Civil Eng.
, pp. 177-184
-
-
Martinez, J.C.1
Ioannou, P.G.2
Carr, R.I.3
-
15
-
-
0003906653
-
-
Van Nostrand Reinhold, New York.
-
Moder, J. J., Phillips, C. R., and Davis, E. W. (1983). Project management with CPM, PERT and precedence diagramming, Van Nostrand Reinhold, New York, 269-272.
-
(1983)
Project Management with CPM, PERT and Precedence Diagramming
, pp. 269-272
-
-
Moder, J.J.1
Phillips, C.R.2
Davis, E.W.3
-
16
-
-
0003692307
-
-
Wiley, New York.
-
Morris, P. W., and Hough, G. H. (1987). The anatomy of major projects: A study of the reality of project management, Wiley, New York, 15.
-
(1987)
The Anatomy of Major Projects: A Study of the Reality of Project Management
, pp. 15
-
-
Morris, P.W.1
Hough, G.H.2
-
17
-
-
0027866760
-
-
J. Constr. Eng. Manage., (4).
-
Moselhi, O., and El-Rayes, K. (1993). " Scheduling of repetitive projects with cost optimization.." J. Constr. Eng. Manage., 119 (4), 681-697.
-
(1993)
Scheduling of Repetitive Projects with Cost Optimization
, vol.119
, pp. 681-697
-
-
Moselhi, O.1
El-Rayes, K.2
-
18
-
-
0004294559
-
-
Wiley, New York.
-
Myers, R. H., and Montgomery, D. C. (2002). Response surface methodology: Process and product optimization using designed experiments, Wiley, New York, 1-13.
-
(2002)
Response Surface Methodology: Process and Product Optimization Using Designed Experiments
, pp. 1-13
-
-
Myers, R.H.1
Montgomery, D.C.2
-
19
-
-
0024178293
-
-
Large project simulation: A powerful tool for project management analysis.", IEEE, New York.
-
Ondash, C. S., Maloney, S., and Huerta, J. M. (1988). " Large project simulation: A powerful tool for project management analysis.." Proc., 1998 Winter Simulation Conf., IEEE, New York, 231-239.
-
(1988)
Proc., 1998 Winter Simulation Conf.
, pp. 231-239
-
-
Ondash, C.S.1
Maloney, S.2
Huerta, J.M.3
-
20
-
-
0142025004
-
-
Syst. Dyn. Rev., (3).
-
Park, M., and Pea-Mora, F. (2003). " Dynamic change management for construction: Introducing the change cycle into model-based project management.." Syst. Dyn. Rev., 19 (3), 213-242.
-
(2003)
Dynamic Change Management for Construction: Introducing the Change Cycle into Model-based Project Management
, vol.19
, pp. 213-242
-
-
Park, M.1
Pea-Mora, F.2
-
21
-
-
0000228602
-
-
Syst. Dyn. Rev., (2).
-
Rodrigues, A., and Bowers, J. (1996). " System dynamics in project management: A comparative analysis with traditional methods.." Syst. Dyn. Rev., 12 (2), 121-139.
-
(1996)
System Dynamics in Project Management: A Comparative Analysis with Traditional Methods
, vol.12
, pp. 121-139
-
-
Rodrigues, A.1
Bowers, J.2
-
22
-
-
0042861741
-
-
" Interfaces, (3).
-
Schultz, R. L., Slevin, D. P., and Pinto, J. K. (1987). " Strategy and tactics in a process model of project implementation.." Interfaces, 17 (3), 34-46.
-
(1987)
Strategy and Tactics in A Process Model of Project Implementation
, vol.17
, pp. 34-46
-
-
Schultz, R.L.1
Slevin, D.P.2
Pinto, J.K.3
-
23
-
-
0002324953
-
-
J. Constr. Eng. Manage., (1).
-
Senior, B., and Halpin, D. (1998). " Simplified simulation system for construction projects.." J. Constr. Eng. Manage., 124 (1), 72-81.
-
(1998)
Simplified Simulation System for Construction Projects
, vol.124
, pp. 72-81
-
-
Senior, B.1
Halpin, D.2
-
24
-
-
0006609394
-
-
" Constr. Manage. Econom., (2).
-
Smith, S., Wood, G., and Gould, M. (2000). " A new earthworks estimating methodology.." Constr. Manage. Econom., 18 (2), 219-228.
-
(2000)
A New Earthworks Estimating Methodology
, vol.18
, pp. 219-228
-
-
Smith, S.1
Wood, G.2
Gould, M.3
-
25
-
-
0029522572
-
-
" J. Constr. Eng. Manage., (4).
-
Smith, S. D., Osbourne, J. R., and Forde, M. C. (1995). " Analysis of earthmoving systems using discrete-event simulation.." J. Constr. Eng. Manage., 121 (4), 388-396.
-
(1995)
Analysis of Earthmoving Systems Using Discrete-event Simulation
, vol.121
, pp. 388-396
-
-
Smith, S.D.1
Osbourne, J.R.2
Forde, M.C.3
-
27
-
-
0025460174
-
-
J. Manage. Eng., (3).
-
Tavakoli, A., and Riachi, R. (1990). " CPM use in ENR top 400 contractors.." J. Manage. Eng., 6 (3), 282-295.
-
(1990)
CPM Use in ENR Top 400 Contractors
, vol.6
, pp. 282-295
-
-
Tavakoli, A.1
Riachi, R.2
-
28
-
-
84930116614
-
-
J. Constr. Eng. Manage., (1).
-
Voster, M. C., and Bafna, T. (1992). " Discussion of Formal development of line-of-balance technique' by Z. M. Al Sarraj.." J. Constr. Eng. Manage., 118 (1), 210-211.
-
(1992)
Discussion of Formal Development of Line-of-balance Technique' by Z. M. Al Sarraj
, vol.118
, pp. 210-211
-
-
Voster, M.C.1
Bafna, T.2
|