Simplifying Simulation Modeling through Integration with 3D CAD
-
AbouRizk, S.M., and K. Mather. (2003) Simplifying Simulation Modeling through Integration with 3D CAD. J. Constr. Engrg. and Mgmt. 126(6): 475-483.
-
(2003)
J. Constr. Engrg. and Mgmt.
, vol.126
, Issue.6
, pp. 475-483
-
-
Abourizk, S.M.1
Mather, K.2
-
2
-
-
13944271386
-
RISim: Resource-interacted simulation modeling in construction
-
DOI 10.1061/(ASCE)0733-9364(2002)128:3(195)
-
Chua, D.K.H., and G.M. Li (2002) RISim: Resource-Interacted Simulation Modeling in Construction. J. Constr. Engrg. and Mgmt. 128(3): 195-202. (Pubitemid 40265544)
-
(2002)
Journal of Construction Engineering and Management
, vol.128
, Issue.3
, pp. 195-202
-
-
Chua, D.K.H.1
Li, G.M.2
-
4
-
-
77951604464
-
Capital Projects Technology Roadmap
-
FIATECH Austin, TX 78759
-
FIATECH (2004). Capital Projects Technology Roadmap. Element 1: Tactical Plan, Scenario-based Project Planning. Austin, TX 78759 〈www.fiatech. org〉
-
(2004)
Element 1: Tactical Plan, Scenario-based Project Planning
-
-
-
5
-
-
0041304359
-
Unified Modeling Methodology for Construction Simulation
-
Hajjar, D., S. and AbouRizk (2002). Unified Modeling Methodology for Construction Simulation. J. Constr. Engrg. and Mgmt. 128(2): 174-185.
-
(2002)
J. Constr. Engrg. and Mgmt.
, vol.128
, Issue.2
, pp. 174-185
-
-
Hajjar, D.S.1
AbouRizk2
-
6
-
-
0017539255
-
CYCLONE: Method for Modeling of Job Site Processes
-
Halpin, D. W. (1976). CYCLONE: Method for Modeling of Job Site Processes. Journal of the Construction Division. 103(3): 489-499.
-
(1976)
Journal of the Construction Division
, vol.103
, Issue.3
, pp. 489-499
-
-
Halpin, D.W.1
-
9
-
-
1642440732
-
Validating Complex Construction Simulation Models Using 3D Visualization
-
Kamat, V.R. and J.C. Martinez. (2003). Validating Complex Construction Simulation Models Using 3D Visualization. Systems Analysis Modelling Simulation. 43(4): 455-456
-
(2003)
Systems Analysis Modelling Simulation
, vol.43
, Issue.4
, pp. 455-456
-
-
Kamat, V.R.1
Martinez, J.C.2
-
10
-
-
6344232286
-
Simplified Discrete-Event Simulation Approach for Construction Simulation
-
Lu, M. (2003) Simplified Discrete-Event Simulation Approach for Construction Simulation. J. Constr. Engrg. and Mgmt. 129(5): 537-546.
-
(2003)
J. Constr. Engrg. and Mgmt.
, vol.129
, Issue.5
, pp. 537-546
-
-
Lu, M.1
-
11
-
-
6344237930
-
HKCONSIM: A practical simulation solution to planning concrete plant operations in Hong Kong
-
DOI 10.1061/(ASCE)0733-9364(2003)129:5(547)
-
Lu, M., M. Anson, S.L. Tang, and Y.C. Ying. (2003) HKCONSIM: A Practical Simulation Solution to Planning Concrete Plant Operations in Hong Kong. J. Constr. Engrg. and Mgmt. 129(5): 547-554. (Pubitemid 40265442)
-
(2003)
Journal of Construction Engineering and Management
, vol.129
, Issue.5
, pp. 547-554
-
-
Lu, M.1
Anson, M.2
Tang, S.L.3
Ying, Y.C.4
-
12
-
-
0032677122
-
General-Purpose Systems for Effective Construction Simulation
-
Martinez, J.C. and P.G. Ioannou (1999). General-Purpose Systems for Effective Construction Simulation, J. Constr. Engrg. and Mgmt. 125(4): 265-275.
-
(1999)
J. Constr. Engrg. and Mgmt.
, vol.125
, Issue.4
, pp. 265-275
-
-
Martinez, J.C.1
Ioannou, P.G.2
-
13
-
-
0242633355
-
Object-oriented simulation model for earthmoving operations
-
DOI 10.1061/(ASCE)0733-9364(2003)129:2(173)
-
Marzouk, M. and O. Moselhi. (2003) Object-oriented Simulation Model for Earthmoving Operations. J. Constr. Engrg. and Mgmt. 129(2): 173-181. (Pubitemid 40265486)
-
(2003)
Journal of Construction Engineering and Management
, vol.129
, Issue.2
, pp. 173-181
-
-
Marzouk, M.1
Moselhi, O.2
-
14
-
-
0027206329
-
Modeling operational activities in object-oriented simulation
-
Oloufa, A. A. (1993). Modeling Operational Activities in Object-Oriented Simulation. Journal of Computing in Civil Engineering. 7(1): 94-106. (Pubitemid 23632251)
-
(1993)
Journal of Computing in Civil Engineering
, vol.7
, Issue.1
, pp. 94-106
-
-
Oloufa Amr, A.1
-
15
-
-
49749096092
-
Strategic-Operational Construction Management: Hybrid System Dynamics and Discrete Event Approach
-
Peña-Mora, F., S. Han, S. Lee, and M. Park. (2008) Strategic-Operational Construction Management: Hybrid System Dynamics and Discrete Event Approach. J. Constr. Engrg. and Mgmt. 134(9): 701-710.
-
(2008)
J. Constr. Engrg. and Mgmt.
, vol.134
, Issue.9
, pp. 701-710
-
-
Peña-Mora, F.1
Han, S.2
Lee, S.3
Park, M.4
-
16
-
-
14544300604
-
General-purpose situational simulation environment for construction education
-
DOI 10.1061/(ASCE)0733-9364(2005)131:3(319)
-
Rojas, E.M., and A. Mukherjee. (2005) General-Purpose Situational Simulation Environment for Construction Education. J. Constr. Engrg. and Mgmt. 131(3): 319-329. (Pubitemid 40303940)
-
(2005)
Journal of Construction Engineering and Management
, vol.131
, Issue.3
, pp. 319-329
-
-
Rojas, E.M.1
Mukherjee, A.2
-
17
-
-
0026382296
-
An approach to object-oriented discrete-event simulation of manufacturing systems
-
Shewchuk, J. and T. Chang. (1991). An approach to object-oriented discrete-event simulation of manufacturing systems. 23rd Winter Simulation Conference, Phoenix, Ariz., 302-311. (Pubitemid 23574480)
-
(1991)
Winter Simulation Conference Proceedings
, pp. 302-311
-
-
Shewchuk John, P.1
Chang, T.-C.2
-
18
-
-
0032684768
-
Activity-Based Construction (ABC) Modeling and Simulation Method
-
Shi, J. (1999) Activity-Based Construction (ABC) Modeling and Simulation Method. J. Constr. Engrg. and Mgmt. 125(5): 354-360.
-
(1999)
J. Constr. Engrg. and Mgmt.
, vol.125
, Issue.5
, pp. 354-360
-
-
Shi, J.1
-
19
-
-
45749125257
-
Modeling Time-Constraints in Construction Operations through Simulation
-
Zhang, H, H. Li, and M. Lu. (2008) Modeling Time-Constraints in Construction Operations through Simulation. J. Constr. Engrg. and Mgmt. 134(7): 545-554.
-
(2008)
J. Constr. Engrg. and Mgmt.
, vol.134
, Issue.7
, pp. 545-554
-
-
Zhang, H.1
Li, H.2
Lu, M.3
|