-
2
-
-
0001096735
-
Genetic algorithms and random keys for sequencing and optimization
-
J.C. Bean Genetic algorithms and random keys for sequencing and optimization ORSA Journal on Computing 6 1994 154 160
-
(1994)
ORSA Journal on Computing
, vol.6
, pp. 154-160
-
-
Bean, J.C.1
-
3
-
-
0035427201
-
Managing simple re-entrant flow lines: Theoretical foundation and experimental results
-
DOI 10.1023/A:1010902413978
-
C.F. Bispo, and S. Tayur Managing simple re-entrant flow lines: theoretical foundation and experimental result IIE Transactions 33 8 2001 609 623 (Pubitemid 32615932)
-
(2001)
IIE Transactions (Institute of Industrial Engineers)
, vol.33
, Issue.8
, pp. 609-623
-
-
Bispo, C.F.1
Tayur, S.2
-
4
-
-
37349113923
-
Hybrid tabu search for re-entrant permutation flow shop scheduling problem
-
J.S. Chen, J.C.H. Pan, and C.K. Wu Hybrid tabu search for re-entrant permutation flow shop scheduling problem Expert Systems with Applications 34 3 2008 1924 1930
-
(2008)
Expert Systems with Applications
, vol.34
, Issue.3
, pp. 1924-1930
-
-
Chen, J.S.1
Pan, J.C.H.2
Wu, C.K.3
-
5
-
-
34248573437
-
A hybrid genetic algorithm for the re-entrant flow-shop scheduling problem
-
J.S. Chen, J.C.H. Pan, and C.M. Lin A hybrid genetic algorithm for the re-entrant flow-shop scheduling problem Expert Systems with Applications 34 2008 570 577
-
(2008)
Expert Systems with Applications
, vol.34
, pp. 570-577
-
-
Chen, J.S.1
Pan, J.C.H.2
Lin, C.M.3
-
6
-
-
33746257095
-
A branch and bound procedure for the reentrant permutation flow-shop scheduling problem
-
J.S. Chen A branch and bound procedure for the reentrant permutation flow-shop scheduling problem International Journal of Advanced Manufacturing Technology 29 2006 1186 1193
-
(2006)
International Journal of Advanced Manufacturing Technology
, vol.29
, pp. 1186-1193
-
-
Chen, J.S.1
-
7
-
-
34748813744
-
Minimizing makespan on an m-machine re-entrant flowshop
-
S.W. Choi, and Yd. Kim Minimizing makespan on an m-machine re-entrant flowshop Computers & Operations Research 35 5 2008 1684 1696
-
(2008)
Computers & Operations Research
, vol.35
, Issue.5
, pp. 1684-1696
-
-
Choi, S.W.1
Kim, Yd.2
-
8
-
-
27944484415
-
Minimizing total tardiness of orders with reentrant lots in a hybrid flowshop
-
S.W. Choi, Y.D. Kim, and G.C. Lee Minimizing total tardiness of orders with reentrant lots in a hybrid flowshop International Journal of Production Research 43 11 2005 2149 2167
-
(2005)
International Journal of Production Research
, vol.43
, Issue.11
, pp. 2149-2167
-
-
Choi, S.W.1
Kim, Y.D.2
Lee, G.C.3
-
9
-
-
0000332876
-
Decomposition methods for re-entrant flow shops with sequence-dependent setup times
-
E. Demirkol, and R. Uzsoy Decomposition methods for re-entrant flow shops with sequence-dependent setup times Journal of Scheduling 3 3 2000 155 177
-
(2000)
Journal of Scheduling
, vol.3
, Issue.3
, pp. 155-177
-
-
Demirkol, E.1
Uzsoy, R.2
-
11
-
-
0031383019
-
Production sequencing problem with reentrant work flows and sequence dependent setup times
-
PII S0360835297002507
-
H. Hwang, and J.U. Sun Production sequencing problem with reentrant work flows and sequence dependent setup times Computers & Industrial Engineering 33 1997 773 776 (Pubitemid 127406899)
-
(1997)
Computers and Industrial Engineering
, vol.33
, Issue.3-4
, pp. 773-776
-
-
Hwang, H.1
Sun, J.U.2
-
12
-
-
0032163475
-
Production sequencing problem with re-entrant work flows and sequence dependent setup times
-
H. Hwang, and J.U. Sun Production sequencing problem with reentrant work flows and sequence dependent setup times International Journal of Production Research 36 9 1998 2435 2450 (Pubitemid 128670858)
-
(1998)
International Journal of Production Research
, vol.36
, Issue.9
, pp. 2435-2450
-
-
Hwang, H.1
Sun, J.U.2
-
13
-
-
0003075019
-
Optimal two- and three-stage production schedules with set up times included
-
S.M. Johnson Optimal two- and three-stage production schedules with set up times included Naval Research Logistics Quarterly 1 1 1954 61 68
-
(1954)
Naval Research Logistics Quarterly
, vol.1
, Issue.1
, pp. 61-68
-
-
Johnson, S.M.1
-
14
-
-
0032002955
-
Due date based scheduling and control policies in a multi-product semiconductor wafer fabrication facility
-
Y.D. Kim, J.U. Kim, S.K. Lim, and H.B. Jun Due date based scheduling and control policies in a multi-product semiconductor wafer fabrication facility IEEE Transactions on Semiconductor Manufacturing 11 1 1998 155 164
-
(1998)
IEEE Transactions on Semiconductor Manufacturing
, vol.11
, Issue.1
, pp. 155-164
-
-
Kim, Y.D.1
Kim, J.U.2
Lim, S.K.3
Jun, H.B.4
-
15
-
-
0031705292
-
A Simulation Study on Lot Release Control, Mask Scheduling, and Batch Scheduling in Semiconductor Wafer Fabrication Facilities
-
Y.D. Kim, D. Lee, and J.U. Kim A simulation study on lot release control, mask scheduling and batch scheduling in semiconductor wafer fabrication facility Journal of Manufacturing Systems 17 2 1998 107 117 (Pubitemid 128447050)
-
(1998)
Journal of Manufacturing Systems
, vol.17
, Issue.2
, pp. 107-117
-
-
Kim, Y.-D.1
Lee, D.-H.2
Kim, J.-U.3
Roh, H.-K.4
-
16
-
-
0030232128
-
Mean flow time minimization in reentrant job shops with a hub
-
W. Kubiak, S.X.C. Lou, and Y. Wang Mean flow time minimization in re-entrant job-shops with a hub Operations Research 44 5 1996 764 776 (Pubitemid 126669553)
-
(1996)
Operations Research
, vol.44
, Issue.5
, pp. 764-776
-
-
Kubiak, W.1
Lou, S.X.C.2
Wang, Y.3
-
17
-
-
2942674864
-
Scheduling flexible flow lines with sequence dependent setup times
-
M.E. Kurz, and R.G. Askin Scheduling flexible flow lines with sequence dependent setup times European Journal of Operational Research 159 2004 66 82
-
(2004)
European Journal of Operational Research
, vol.159
, pp. 66-82
-
-
Kurz, M.E.1
Askin, R.G.2
-
18
-
-
34548462907
-
A two-stage hybrid flowshop scheduling problem with a function constraint and unrelated alternative machines
-
DOI 10.1016/j.cor.2006.04.004, PII S0305054806001237
-
C. Low, C.J. Hsu, and C.T. Su A two-stage hybrid flowshop scheduling problem with a function constraint and unrelated alternative machines Computers & Operations Research 35 2008 845 853 (Pubitemid 47368842)
-
(2008)
Computers and Operations Research
, vol.35
, Issue.3
, pp. 845-853
-
-
Low, C.1
Hsu, C.-J.2
Su, C.-T.3
-
19
-
-
13544273189
-
Decentralised, multi-objective driven scheduling for reentrant shops: A conceptual development and a test case
-
DOI 10.1016/j.ejor.2004.07.013, PII S0377221704004709, Multicriteria Scheduling
-
G. Miragliotta, and M. Perona Decentralised, multi-objective driven scheduling for reentrant shops: a conceptual development and a test case European Journal of Operational Research 167 2005 644 662 (Pubitemid 40220083)
-
(2005)
European Journal of Operational Research
, vol.167
, Issue.3
, pp. 644-662
-
-
Miragliotta, G.1
Perona, M.2
-
20
-
-
26444453872
-
A distributed shifting bottleneck heuristic for complex job shops
-
DOI 10.1016/j.cie.2005.06.004, PII S0360835205000793
-
L. Monch, and R. Driebel A distributed shifting bottleneck heuristic for complex job shops Computers & Industrial Engineering 49 2005 363 380 (Pubitemid 41436335)
-
(2005)
Computers and Industrial Engineering
, vol.49
, Issue.3
, pp. 363-380
-
-
Monch, L.1
Driessel, R.2
-
22
-
-
0030241443
-
Genetic algorithms for flowshop scheduling problems
-
DOI 10.1016/0360-8352(96)00053-8
-
T. Murata, H. Ishibuchi, and H. Tanaka Genetic algorithms for flows shop scheduling problems Computers & Industrial Engineering 30 4 1996 1061 1071 (Pubitemid 126375914)
-
(1996)
Computers and Industrial Engineering
, vol.30
, Issue.4
, pp. 1061-1071
-
-
Murata, T.1
Ishibuchi, H.2
Tanaka, H.3
-
23
-
-
0020699921
-
A heuristic algorithm for the m-machine, n-job flow-shop sequencing problem
-
DOI 10.1016/0305-0483(83)90088-9
-
M. Nawaz Jr., E.E. Enscore, and I. Ham A heuristic algorithm for the m-machine, n-job flow-shop sequencing problem, Omega International Journal of Management Science 11 1 1983 91 95 (Pubitemid 13193807)
-
(1983)
Omega
, vol.11
, Issue.1
, pp. 91-95
-
-
Nawaz, M.1
Enscore Jr., E.E.2
Ham, I.3
-
24
-
-
0033101911
-
A genetic algorithm methodology for complex scheduling problems
-
B.A. Norman, and J.C. Bean A genetic algorithm methodology for complex scheduling problems Naval Research Logistics 46 1999 199 211
-
(1999)
Naval Research Logistics
, vol.46
, pp. 199-211
-
-
Norman, B.A.1
Bean, J.C.2
-
28
-
-
2942673830
-
A random-key genetic algorithm for the generalized traveling salesman problem
-
Department of Industrial Engineering and Management Sciences, Northwestern University
-
L.V. Snyder, M.S. Daskin, A random-key genetic algorithm for the generalized traveling salesman problem, Working Paper, Department of Industrial Engineering and Management Sciences, Northwestern University, 2001.
-
(2001)
Working Paper
-
-
Snyder, L.V.1
Daskin, M.S.2
-
29
-
-
33845487579
-
Hybrid decomposition heuristics for solving large-scale scheduling problems in semiconductor wafer fabrication
-
DOI 10.1007/s10951-006-0325-5
-
K. Sourirajan, and R. Uzsoy Hybrid decomposition heuristics for solving large-scale scheduling problems in semiconductor wafer fabrication Journal of Scheduling 10 2007 41 65 (Pubitemid 44914828)
-
(2007)
Journal of Scheduling
, vol.10
, Issue.1
, pp. 41-65
-
-
Sourirajan, K.1
Uzsoy, R.2
-
31
-
-
84952240555
-
A review of production planning and scheduling models in the semiconductor industry (Part I: System characteristics, performance evaluation and production planning)
-
R. Uzsoy, C.Y. Lee, and L.A. Martin-Vega A review of production planning and scheduling models in the semiconductor industry (Part I: System characteristics, performance evaluation and production planning) IIE Transactions 24 4 1992 47 60
-
(1992)
IIE Transactions
, vol.24
, Issue.4
, pp. 47-60
-
-
Uzsoy, R.1
Lee, C.Y.2
Martin-Vega, L.A.3
-
32
-
-
0028496979
-
A review of production planning and scheduling models in the semiconductor industry (Part II: Shop-floor control)
-
R. Uzsoy, C.Y. Lee, and L.A. Martin-Vega A review of production planning and scheduling models in the semiconductor industry (Part II: Shop-floor control) IIE Transactions 26 5 1994 44 55
-
(1994)
IIE Transactions
, vol.26
, Issue.5
, pp. 44-55
-
-
Uzsoy, R.1
Lee, C.Y.2
Martin-Vega, L.A.3
-
33
-
-
0035331868
-
A model predictive control approach for real-time optimization of reentrant manufacturing lines
-
DOI 10.1016/S0166-3615(01)00080-X, PII S016636150100080X
-
F.D. Vargas-Villamil, and D.E. Rivera A model predictive control approach for real-time optimization of re-entrant manufacturing lines Computers in Industry 45 1 2001 45 57 (Pubitemid 32534115)
-
(2001)
Computers in Industry
, vol.45
, Issue.1
, pp. 45-57
-
-
Vargas-Villamil, F.D.1
Rivera, D.E.2
-
34
-
-
36849069984
-
Multi-family scheduling in a two-machine reentrant flow shop with setups
-
D.L. Yang, W.H. Kuo, and M.S. Chern Multi-family scheduling in a two-machine reentrant flow shop with setups European Journal of Operational Research 187 3 2008 1160 1170
-
(2008)
European Journal of Operational Research
, vol.187
, Issue.3
, pp. 1160-1170
-
-
Yang, D.L.1
Kuo, W.H.2
Chern, M.S.3
-
35
-
-
0032664027
-
Cyclic scheduling for re-entrant manufacturing systems
-
K. Yura Cyclic scheduling for re-entrant manufacturing systems International Journal of Production Economics 60-61 1999 523 528
-
(1999)
International Journal of Production Economics
, vol.60-61
, pp. 523-528
-
-
Yura, K.1
-
36
-
-
33748321077
-
An immune algorithm approach to hybrid flow shops scheduling with sequence-dependent setup times
-
DOI 10.1016/j.amc.2005.11.136, PII S0096300305011021
-
M. Zandieh, S.M.T. Fatemi Ghomi, and S.M. Moattar Husseini An immune algorithm approach to hybrid flow shops scheduling with sequence-dependent setup times Applied Mathematics and Computation 180 2006 111 127 (Pubitemid 44331328)
-
(2006)
Applied Mathematics and Computation
, vol.180
, Issue.1
, pp. 111-127
-
-
Zandieh, M.1
Fatemi Ghomi, S.M.T.2
Moattar Husseini, S.M.3
|