메뉴 건너뛰기




Volumn 11, Issue 8, 2011, Pages 4530-4539

Two stage reentrant hybrid flow shop with setup times and the criterion of minimizing makespan

Author keywords

Heuristics; Hybrid genetic algorithm; Reentrant hybrid flow shop; Setup times

Indexed keywords

AIRPLANE ENGINES; COMPUTATIONAL EXPERIMENT; ELECTRONICS MANUFACTURING; HEURISTICS; HYBRID FLOW SHOP; HYBRID FLOW SHOP SCHEDULING; HYBRID GENETIC ALGORITHMS; IDENTICAL PARALLEL MACHINES; MAKESPAN; MINIMIZING MAKESPAN; REENTRANT HYBRID FLOW SHOP; REENTRANT SHOPS; SCHEDULING PROBLEM; SET-UP TIME; TWO STAGE;

EID: 80053575706     PISSN: 15684946     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.asoc.2011.08.013     Document Type: Article
Times cited : (63)

References (36)
  • 2
    • 0001096735 scopus 로고
    • Genetic algorithms and random keys for sequencing and optimization
    • J.C. Bean Genetic algorithms and random keys for sequencing and optimization ORSA Journal on Computing 6 1994 154 160
    • (1994) ORSA Journal on Computing , vol.6 , pp. 154-160
    • Bean, J.C.1
  • 3
    • 0035427201 scopus 로고    scopus 로고
    • Managing simple re-entrant flow lines: Theoretical foundation and experimental results
    • DOI 10.1023/A:1010902413978
    • C.F. Bispo, and S. Tayur Managing simple re-entrant flow lines: theoretical foundation and experimental result IIE Transactions 33 8 2001 609 623 (Pubitemid 32615932)
    • (2001) IIE Transactions (Institute of Industrial Engineers) , vol.33 , Issue.8 , pp. 609-623
    • Bispo, C.F.1    Tayur, S.2
  • 4
    • 37349113923 scopus 로고    scopus 로고
    • Hybrid tabu search for re-entrant permutation flow shop scheduling problem
    • J.S. Chen, J.C.H. Pan, and C.K. Wu Hybrid tabu search for re-entrant permutation flow shop scheduling problem Expert Systems with Applications 34 3 2008 1924 1930
    • (2008) Expert Systems with Applications , vol.34 , Issue.3 , pp. 1924-1930
    • Chen, J.S.1    Pan, J.C.H.2    Wu, C.K.3
  • 5
    • 34248573437 scopus 로고    scopus 로고
    • A hybrid genetic algorithm for the re-entrant flow-shop scheduling problem
    • J.S. Chen, J.C.H. Pan, and C.M. Lin A hybrid genetic algorithm for the re-entrant flow-shop scheduling problem Expert Systems with Applications 34 2008 570 577
    • (2008) Expert Systems with Applications , vol.34 , pp. 570-577
    • Chen, J.S.1    Pan, J.C.H.2    Lin, C.M.3
  • 6
    • 33746257095 scopus 로고    scopus 로고
    • A branch and bound procedure for the reentrant permutation flow-shop scheduling problem
    • J.S. Chen A branch and bound procedure for the reentrant permutation flow-shop scheduling problem International Journal of Advanced Manufacturing Technology 29 2006 1186 1193
    • (2006) International Journal of Advanced Manufacturing Technology , vol.29 , pp. 1186-1193
    • Chen, J.S.1
  • 7
    • 34748813744 scopus 로고    scopus 로고
    • Minimizing makespan on an m-machine re-entrant flowshop
    • S.W. Choi, and Yd. Kim Minimizing makespan on an m-machine re-entrant flowshop Computers & Operations Research 35 5 2008 1684 1696
    • (2008) Computers & Operations Research , vol.35 , Issue.5 , pp. 1684-1696
    • Choi, S.W.1    Kim, Yd.2
  • 8
    • 27944484415 scopus 로고    scopus 로고
    • Minimizing total tardiness of orders with reentrant lots in a hybrid flowshop
    • S.W. Choi, Y.D. Kim, and G.C. Lee Minimizing total tardiness of orders with reentrant lots in a hybrid flowshop International Journal of Production Research 43 11 2005 2149 2167
    • (2005) International Journal of Production Research , vol.43 , Issue.11 , pp. 2149-2167
    • Choi, S.W.1    Kim, Y.D.2    Lee, G.C.3
  • 9
    • 0000332876 scopus 로고    scopus 로고
    • Decomposition methods for re-entrant flow shops with sequence-dependent setup times
    • E. Demirkol, and R. Uzsoy Decomposition methods for re-entrant flow shops with sequence-dependent setup times Journal of Scheduling 3 3 2000 155 177
    • (2000) Journal of Scheduling , vol.3 , Issue.3 , pp. 155-177
    • Demirkol, E.1    Uzsoy, R.2
  • 11
    • 0031383019 scopus 로고    scopus 로고
    • Production sequencing problem with reentrant work flows and sequence dependent setup times
    • PII S0360835297002507
    • H. Hwang, and J.U. Sun Production sequencing problem with reentrant work flows and sequence dependent setup times Computers & Industrial Engineering 33 1997 773 776 (Pubitemid 127406899)
    • (1997) Computers and Industrial Engineering , vol.33 , Issue.3-4 , pp. 773-776
    • Hwang, H.1    Sun, J.U.2
  • 12
    • 0032163475 scopus 로고    scopus 로고
    • Production sequencing problem with re-entrant work flows and sequence dependent setup times
    • H. Hwang, and J.U. Sun Production sequencing problem with reentrant work flows and sequence dependent setup times International Journal of Production Research 36 9 1998 2435 2450 (Pubitemid 128670858)
    • (1998) International Journal of Production Research , vol.36 , Issue.9 , pp. 2435-2450
    • Hwang, H.1    Sun, J.U.2
  • 13
    • 0003075019 scopus 로고
    • Optimal two- and three-stage production schedules with set up times included
    • S.M. Johnson Optimal two- and three-stage production schedules with set up times included Naval Research Logistics Quarterly 1 1 1954 61 68
    • (1954) Naval Research Logistics Quarterly , vol.1 , Issue.1 , pp. 61-68
    • Johnson, S.M.1
  • 14
    • 0032002955 scopus 로고    scopus 로고
    • Due date based scheduling and control policies in a multi-product semiconductor wafer fabrication facility
    • Y.D. Kim, J.U. Kim, S.K. Lim, and H.B. Jun Due date based scheduling and control policies in a multi-product semiconductor wafer fabrication facility IEEE Transactions on Semiconductor Manufacturing 11 1 1998 155 164
    • (1998) IEEE Transactions on Semiconductor Manufacturing , vol.11 , Issue.1 , pp. 155-164
    • Kim, Y.D.1    Kim, J.U.2    Lim, S.K.3    Jun, H.B.4
  • 15
    • 0031705292 scopus 로고    scopus 로고
    • A Simulation Study on Lot Release Control, Mask Scheduling, and Batch Scheduling in Semiconductor Wafer Fabrication Facilities
    • Y.D. Kim, D. Lee, and J.U. Kim A simulation study on lot release control, mask scheduling and batch scheduling in semiconductor wafer fabrication facility Journal of Manufacturing Systems 17 2 1998 107 117 (Pubitemid 128447050)
    • (1998) Journal of Manufacturing Systems , vol.17 , Issue.2 , pp. 107-117
    • Kim, Y.-D.1    Lee, D.-H.2    Kim, J.-U.3    Roh, H.-K.4
  • 16
    • 0030232128 scopus 로고    scopus 로고
    • Mean flow time minimization in reentrant job shops with a hub
    • W. Kubiak, S.X.C. Lou, and Y. Wang Mean flow time minimization in re-entrant job-shops with a hub Operations Research 44 5 1996 764 776 (Pubitemid 126669553)
    • (1996) Operations Research , vol.44 , Issue.5 , pp. 764-776
    • Kubiak, W.1    Lou, S.X.C.2    Wang, Y.3
  • 17
    • 2942674864 scopus 로고    scopus 로고
    • Scheduling flexible flow lines with sequence dependent setup times
    • M.E. Kurz, and R.G. Askin Scheduling flexible flow lines with sequence dependent setup times European Journal of Operational Research 159 2004 66 82
    • (2004) European Journal of Operational Research , vol.159 , pp. 66-82
    • Kurz, M.E.1    Askin, R.G.2
  • 18
    • 34548462907 scopus 로고    scopus 로고
    • A two-stage hybrid flowshop scheduling problem with a function constraint and unrelated alternative machines
    • DOI 10.1016/j.cor.2006.04.004, PII S0305054806001237
    • C. Low, C.J. Hsu, and C.T. Su A two-stage hybrid flowshop scheduling problem with a function constraint and unrelated alternative machines Computers & Operations Research 35 2008 845 853 (Pubitemid 47368842)
    • (2008) Computers and Operations Research , vol.35 , Issue.3 , pp. 845-853
    • Low, C.1    Hsu, C.-J.2    Su, C.-T.3
  • 19
    • 13544273189 scopus 로고    scopus 로고
    • Decentralised, multi-objective driven scheduling for reentrant shops: A conceptual development and a test case
    • DOI 10.1016/j.ejor.2004.07.013, PII S0377221704004709, Multicriteria Scheduling
    • G. Miragliotta, and M. Perona Decentralised, multi-objective driven scheduling for reentrant shops: a conceptual development and a test case European Journal of Operational Research 167 2005 644 662 (Pubitemid 40220083)
    • (2005) European Journal of Operational Research , vol.167 , Issue.3 , pp. 644-662
    • Miragliotta, G.1    Perona, M.2
  • 20
    • 26444453872 scopus 로고    scopus 로고
    • A distributed shifting bottleneck heuristic for complex job shops
    • DOI 10.1016/j.cie.2005.06.004, PII S0360835205000793
    • L. Monch, and R. Driebel A distributed shifting bottleneck heuristic for complex job shops Computers & Industrial Engineering 49 2005 363 380 (Pubitemid 41436335)
    • (2005) Computers and Industrial Engineering , vol.49 , Issue.3 , pp. 363-380
    • Monch, L.1    Driessel, R.2
  • 22
    • 0030241443 scopus 로고    scopus 로고
    • Genetic algorithms for flowshop scheduling problems
    • DOI 10.1016/0360-8352(96)00053-8
    • T. Murata, H. Ishibuchi, and H. Tanaka Genetic algorithms for flows shop scheduling problems Computers & Industrial Engineering 30 4 1996 1061 1071 (Pubitemid 126375914)
    • (1996) Computers and Industrial Engineering , vol.30 , Issue.4 , pp. 1061-1071
    • Murata, T.1    Ishibuchi, H.2    Tanaka, H.3
  • 23
    • 0020699921 scopus 로고
    • A heuristic algorithm for the m-machine, n-job flow-shop sequencing problem
    • DOI 10.1016/0305-0483(83)90088-9
    • M. Nawaz Jr., E.E. Enscore, and I. Ham A heuristic algorithm for the m-machine, n-job flow-shop sequencing problem, Omega International Journal of Management Science 11 1 1983 91 95 (Pubitemid 13193807)
    • (1983) Omega , vol.11 , Issue.1 , pp. 91-95
    • Nawaz, M.1    Enscore Jr., E.E.2    Ham, I.3
  • 24
    • 0033101911 scopus 로고    scopus 로고
    • A genetic algorithm methodology for complex scheduling problems
    • B.A. Norman, and J.C. Bean A genetic algorithm methodology for complex scheduling problems Naval Research Logistics 46 1999 199 211
    • (1999) Naval Research Logistics , vol.46 , pp. 199-211
    • Norman, B.A.1    Bean, J.C.2
  • 28
    • 2942673830 scopus 로고    scopus 로고
    • A random-key genetic algorithm for the generalized traveling salesman problem
    • Department of Industrial Engineering and Management Sciences, Northwestern University
    • L.V. Snyder, M.S. Daskin, A random-key genetic algorithm for the generalized traveling salesman problem, Working Paper, Department of Industrial Engineering and Management Sciences, Northwestern University, 2001.
    • (2001) Working Paper
    • Snyder, L.V.1    Daskin, M.S.2
  • 29
    • 33845487579 scopus 로고    scopus 로고
    • Hybrid decomposition heuristics for solving large-scale scheduling problems in semiconductor wafer fabrication
    • DOI 10.1007/s10951-006-0325-5
    • K. Sourirajan, and R. Uzsoy Hybrid decomposition heuristics for solving large-scale scheduling problems in semiconductor wafer fabrication Journal of Scheduling 10 2007 41 65 (Pubitemid 44914828)
    • (2007) Journal of Scheduling , vol.10 , Issue.1 , pp. 41-65
    • Sourirajan, K.1    Uzsoy, R.2
  • 31
    • 84952240555 scopus 로고
    • A review of production planning and scheduling models in the semiconductor industry (Part I: System characteristics, performance evaluation and production planning)
    • R. Uzsoy, C.Y. Lee, and L.A. Martin-Vega A review of production planning and scheduling models in the semiconductor industry (Part I: System characteristics, performance evaluation and production planning) IIE Transactions 24 4 1992 47 60
    • (1992) IIE Transactions , vol.24 , Issue.4 , pp. 47-60
    • Uzsoy, R.1    Lee, C.Y.2    Martin-Vega, L.A.3
  • 32
    • 0028496979 scopus 로고
    • A review of production planning and scheduling models in the semiconductor industry (Part II: Shop-floor control)
    • R. Uzsoy, C.Y. Lee, and L.A. Martin-Vega A review of production planning and scheduling models in the semiconductor industry (Part II: Shop-floor control) IIE Transactions 26 5 1994 44 55
    • (1994) IIE Transactions , vol.26 , Issue.5 , pp. 44-55
    • Uzsoy, R.1    Lee, C.Y.2    Martin-Vega, L.A.3
  • 33
    • 0035331868 scopus 로고    scopus 로고
    • A model predictive control approach for real-time optimization of reentrant manufacturing lines
    • DOI 10.1016/S0166-3615(01)00080-X, PII S016636150100080X
    • F.D. Vargas-Villamil, and D.E. Rivera A model predictive control approach for real-time optimization of re-entrant manufacturing lines Computers in Industry 45 1 2001 45 57 (Pubitemid 32534115)
    • (2001) Computers in Industry , vol.45 , Issue.1 , pp. 45-57
    • Vargas-Villamil, F.D.1    Rivera, D.E.2
  • 34
    • 36849069984 scopus 로고    scopus 로고
    • Multi-family scheduling in a two-machine reentrant flow shop with setups
    • D.L. Yang, W.H. Kuo, and M.S. Chern Multi-family scheduling in a two-machine reentrant flow shop with setups European Journal of Operational Research 187 3 2008 1160 1170
    • (2008) European Journal of Operational Research , vol.187 , Issue.3 , pp. 1160-1170
    • Yang, D.L.1    Kuo, W.H.2    Chern, M.S.3
  • 35
    • 0032664027 scopus 로고    scopus 로고
    • Cyclic scheduling for re-entrant manufacturing systems
    • K. Yura Cyclic scheduling for re-entrant manufacturing systems International Journal of Production Economics 60-61 1999 523 528
    • (1999) International Journal of Production Economics , vol.60-61 , pp. 523-528
    • Yura, K.1
  • 36
    • 33748321077 scopus 로고    scopus 로고
    • An immune algorithm approach to hybrid flow shops scheduling with sequence-dependent setup times
    • DOI 10.1016/j.amc.2005.11.136, PII S0096300305011021
    • M. Zandieh, S.M.T. Fatemi Ghomi, and S.M. Moattar Husseini An immune algorithm approach to hybrid flow shops scheduling with sequence-dependent setup times Applied Mathematics and Computation 180 2006 111 127 (Pubitemid 44331328)
    • (2006) Applied Mathematics and Computation , vol.180 , Issue.1 , pp. 111-127
    • Zandieh, M.1    Fatemi Ghomi, S.M.T.2    Moattar Husseini, S.M.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.