Volumn 88, Issue 3, 2004, Pages 257-267

A case study on the multistage IC final testing scheduling problem with reentry

Author keywords

Complex flow shop; Due date; Parallel machine scheduling problem; Reentrant flow lines; Sequence dependent setup time

Indexed keywords

ALGORITHMS; BATCH DATA PROCESSING; COMPUTER SIMULATION; INTEGER PROGRAMMING; MANUFACTURE; MATHEMATICAL MODELS; PROBLEM SOLVING; SCHEDULING;

EID: 1642352034     PISSN: 09255273     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0925-5273(03)00186-5     Document Type: Article
Times cited : (58)

References (17)
  • 1
    • 0000592377 scopus 로고
    • Parallel savings based heuristics for the delivery problem
    • Altinkemer K., Gavish B. Parallel savings based heuristics for the delivery problem. Operations Research. 39(3):1991;456-469.
    • (1991) Operations Research , vol.39 , Issue.3 , pp. 456-469
    • Altinkemer, K.1    Gavish, B.2
  • 2
    • 0031246527 scopus 로고    scopus 로고
    • Parallel machine scheduling with release time and machine eligibility restrictions
    • Centeno G., Armacost R.L. Parallel machine scheduling with release time and machine eligibility restrictions. Computers and Industrial Engineering. 33(1-2):1997;273-276.
    • (1997) Computers and Industrial Engineering , vol.33 , Issue.1-2 , pp. 273-276
    • Centeno, G.1    Armacost, R.L.2
  • 5
    • 0000419596 scopus 로고
    • Scheduling vehicles from a central depot to a number of delivery points
    • Clark G., Wright J. Scheduling vehicles from a central depot to a number of delivery points. Operations Research. 12:1964;568.
    • (1964) Operations Research , vol.12 , pp. 568
    • Clark, G.1    Wright, J.2
  • 7
    • 0031383019 scopus 로고    scopus 로고
    • Production sequencing problem with reentrant work flows and sequence dependent setup times
    • Hwang H., Sun J.U. Production sequencing problem with reentrant work flows and sequence dependent setup times. Computers and Industrial Engineering. 33(3-4):1997;773-776.
    • (1997) Computers and Industrial Engineering , vol.33 , Issue.3-4 , pp. 773-776
    • Hwang, H.1    Sun, J.U.2
  • 9
    • 0029404198 scopus 로고
    • Rolling horizon procedures for dynamic parallel machine scheduling with sequence-dependent setup time
    • Ovacik I.M., Uzsoy R. Rolling horizon procedures for dynamic parallel machine scheduling with sequence-dependent setup time. International Journal of Production Research. 33(11):1995;3173-3192.
    • (1995) International Journal of Production Research , vol.33 , Issue.11 , pp. 3173-3192
    • Ovacik, I.M.1    Uzsoy, R.2
  • 12
    • 0027591102 scopus 로고
    • A parallel route building algorithm for the vehicle routing and scheduling problem with time windows
    • Potvin Y., Rousseau J.M. A parallel route building algorithm for the vehicle routing and scheduling problem with time windows. European Journal of Operational Research. 66:1993;331-340.
    • (1993) European Journal of Operational Research , vol.66 , pp. 331-340
    • Potvin, Y.1    Rousseau, J.M.2
  • 13
    • 0034209871 scopus 로고    scopus 로고
    • Mixed integer programming for scheduling flexible flow lines with limited intermediate buffers
    • Sawik T. Mixed integer programming for scheduling flexible flow lines with limited intermediate buffers. Mathematical and Computer Modelling. 31(13):2000;39-52.
    • (2000) Mathematical and Computer Modelling , vol.31 , Issue.13 , pp. 39-52
    • Sawik, T.1
  • 15
    • 0030660964 scopus 로고    scopus 로고
    • Scheduling of reentrant manufacturing lines using a model predictive control (MPC) approach
    • American Automatic Control Council
    • Vargas-Villamil, F.D., Rivera, D.E., 1997. Scheduling of reentrant manufacturing lines using a model predictive control (MPC) approach. Proceedings of the 1997 American Control Conference, American Automatic Control Council, Vol. 1(3), pp. 1919-1923.
    • (1997) Proceedings of the 1997 American Control Conference , vol.1 , Issue.3 , pp. 1919-1923
    • Vargas-Villamil, F.D.1    Rivera, D.E.2
  • 17
    • 1342288043 scopus 로고    scopus 로고
    • A decomposition methodology for scheduling semiconductor test operations for number of tardy job measures
    • Yoo W.S., LA M.V. A decomposition methodology for scheduling semiconductor test operations for number of tardy job measures. Journal of Electronics Manufacturing. 17(1):1997;51-61.
    • (1997) Journal of Electronics Manufacturing , vol.17 , Issue.1 , pp. 51-61
    • Yoo, W.S.1    La, M.V.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.