메뉴 건너뛰기




Volumn 60, Issue , 1999, Pages 523-528

Cyclic scheduling for re-entrant manufacturing systems

Author keywords

[No Author keywords available]

Indexed keywords

JOB ANALYSIS; PROBLEM SOLVING; PROCESS ENGINEERING; PRODUCTION ENGINEERING; THROUGHPUT;

EID: 0032664027     PISSN: 09255273     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0925-5273(98)00147-9     Document Type: Article
Times cited : (10)

References (8)
  • 2
    • 84952240555 scopus 로고
    • A review of production planning and scheduling models in the semiconductor industry (Part I: System characteristics, performance evaluation and production planning)
    • R. Uzsoy, C.Y. Lee, L.A. Martin-Vega, A review of production planning and scheduling models in the semiconductor industry (Part I: System characteristics, performance evaluation and production planning), IIE Transactions 24 (4) (1992) 47-60.
    • (1992) IIE Transactions , vol.24 , Issue.4 , pp. 47-60
    • Uzsoy, R.1    Lee, C.Y.2    Martin-Vega, L.A.3
  • 3
    • 0028496979 scopus 로고
    • A review of production planning and scheduling models in the semiconductor industry (Part II: Shop-floor control)
    • R. Uzsoy, C.Y. Lee, L.A. Martin-Vega, A review of production planning and scheduling models in the semiconductor industry (Part II: Shop-floor control), IIE Transactions 26 (5) (1994) 44-55.
    • (1994) IIE Transactions , vol.26 , Issue.5 , pp. 44-55
    • Uzsoy, R.1    Lee, C.Y.2    Martin-Vega, L.A.3
  • 4
    • 0021654555 scopus 로고
    • Reasons why throughput times are shorter for cyclic product sequences than for other planning method
    • H. Hübner (Ed.), Elsevier Science, Amsterdam
    • S. Eriksson, K. Lund, Reasons why throughput times are shorter for cyclic product sequences than for other planning method, in: H. Hübner (Ed.), Production Management Systems: Strategies and Tools for Design, Elsevier Science, Amsterdam, 1984, pp. 123-131.
    • (1984) Production Management Systems: Strategies and Tools for Design , pp. 123-131
    • Eriksson, S.1    Lund, K.2
  • 5
    • 0030691565 scopus 로고    scopus 로고
    • Performance measures and schedules in periodic job shops
    • T.-E. Lee, M.E. Posner, Performance measures and schedules in periodic job shops, Operations Research 45 (1) (1997) 72-91.
    • (1997) Operations Research , vol.45 , Issue.1 , pp. 72-91
    • Lee, T.-E.1    Posner, M.E.2
  • 7
    • 0002591492 scopus 로고
    • Cyclic scheduling on parallel processors: An overview
    • P. Chrétienne, E.G. Coffman Jr., J.K. Lenstra, Z. Liu (Eds.), Wiley, Chichester
    • C. Hanen, A. Munier, Cyclic scheduling on parallel processors: an overview, in: P. Chrétienne, E.G. Coffman Jr., J.K. Lenstra, Z. Liu (Eds.), Scheduling Theory and its Applications, Wiley, Chichester, 1995, pp. 193-226.
    • (1995) Scheduling Theory and Its Applications , pp. 193-226
    • Hanen, C.1    Munier, A.2
  • 8
    • 0026206218 scopus 로고
    • A revised cyclic production method, Transactions of ASME
    • K. Yura, A revised cyclic production method, Transactions of ASME, Journal of Engineering for Industry 113 (3) (1991) 328-334.
    • (1991) Journal of Engineering for Industry , vol.113 , Issue.3 , pp. 328-334
    • Yura, K.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.