-
3
-
-
33646913024
-
Dispatching rules for dynamic scheduling of one-of-a-kind production
-
DOI 10.1080/09511920500407541, PII U380587033813
-
Choi, B.K. and You, N.K., 2006. Dispatching rules for dynamic scheduling of one-of-a-kind production. International Journal of Computer Integrated Manufacturing, 19 (4), 383-392. (Pubitemid 43791612)
-
(2006)
International Journal of Computer Integrated Manufacturing
, vol.19
, Issue.4
, pp. 383-392
-
-
Choi, B.K.1
You, N.K.2
-
4
-
-
0004113622
-
-
Reading, MA: Addison-Wesley Publishing
-
Conway, R.W., Maxwell, W.L., and Miller, L.W., 1967. Theory of scheduling. Reading, MA: Addison-Wesley Publishing.
-
(1967)
Theory of Scheduling
-
-
Conway, R.W.1
Maxwell, W.L.2
Miller, L.W.3
-
5
-
-
0024641735
-
The effects of product structure and sequencing rule on assembly shop performance
-
Fry, T.D., et al., 1989. The effects of product structure and sequencing rule on assembly shop performance. International Journal of Production Research, 27 (4), 671-686.
-
(1989)
International Journal of Production Research
, vol.27
, Issue.4
, pp. 671-686
-
-
Fry, T.D.1
-
6
-
-
0022681216
-
Evaluating scheduling policies in a multi-level assembly system
-
Goodwin, S.J. and Weeks, J., 1986. Evaluating scheduling policies in a multi-level assembly system. International Journal of Production Research, 24 (2), 247-257. (Pubitemid 16491134)
-
(1986)
International Journal of Production Research
, vol.24
, Issue.2
, pp. 247-257
-
-
Goodwin Jack, S.1
Weeks James, K.2
-
7
-
-
33747140357
-
Dispatching rules for production scheduling in the capital goods industry
-
DOI 10.1016/j.ijpe.2005.07.005, PII S0925527306000132, Strategic Issues and Innovation in Production Economics
-
Hicks, C. and Pongcharoen, P., 2006. Dispatching rules for production scheduling in the capital goods industry. International Journal of Production Economics, 104 (1), 154-163. (Pubitemid 44224004)
-
(2006)
International Journal of Production Economics
, vol.104
, Issue.1
, pp. 154-163
-
-
Hicks, C.1
Pongcharoen, P.2
-
8
-
-
0021424669
-
Comparative study of priority dispatching rules in a hybrid assembly/job shop
-
Huang, P., 1984. A comparative study of priority dispatching rules in a hybrid assembly/job shop. International Journal of Production Research, 22 (3), 375-387. (Pubitemid 14587002)
-
(1984)
International Journal of Production Research
, vol.22
, Issue.3
, pp. 375-387
-
-
Huang Philip, Y.1
-
9
-
-
0040621775
-
Experimental investigation of iterative simulation-based scheduling in a dynamic and stochastic job shop
-
Kutanoglu, E. and Sabuncuoglu, I., 2001. Experimental investigation of iterative simulation-based scheduling in a dynamic and stochastic job shop. Journal of Manufacturing Systems, 20 (4), 264-279.
-
(2001)
Journal of Manufacturing Systems
, vol.20
, Issue.4
, pp. 264-279
-
-
Kutanoglu, E.1
Sabuncuoglu, I.2
-
10
-
-
0017924416
-
Complexity of scheduling under precedence constraints
-
Lenstra, J.K. and Rinnooy Kan, A.H.G., 1978. Computational complexity of scheduling under precedence constraints. Operations Research, 26 (1), 22-35. (Pubitemid 8576419)
-
(1978)
Operations Research
, vol.26
, Issue.1
, pp. 22-35
-
-
Lenstra, J.K.1
Rinnooy Kan, A.H.G.2
-
11
-
-
78649822911
-
Integrating order review/release and dispatching rules for assembly job shop scheduling using a simulation approach
-
DOI: 10.1080/00207540903524490. [In press]
-
Lu, H.L., Huang, G.Q., and Yang, H.D., 2010. Integrating order review/release and dispatching rules for assembly job shop scheduling using a simulation approach. International Journal of Production Research, DOI: 10.1080/00207540903524490. [In press].
-
(2010)
International Journal of Production Research
-
-
Lu, H.L.1
Huang, G.Q.2
Yang, H.D.3
-
12
-
-
0001274658
-
Multiple-factor rules for sequencing with assembly constraints
-
Maxwell, W.L. and Mehra, M., 1968. Multiple-factor rules for sequencing with assembly constraints. Naval Research Logistics Quarterly, 15 (2), 241-254.
-
(1968)
Naval Research Logistics Quarterly
, vol.15
, Issue.2
, pp. 241-254
-
-
Maxwell, W.L.1
Mehra, M.2
-
14
-
-
0037210011
-
Scheduling rules for dynamic shops that manufacture multi-level jobs
-
DOI 10.1016/S0360-8352(02)00188-2, PII S0360835202001882
-
Mohanasundaram, K.M., et al., 2002. Scheduling rules for dynamic shops that manufacture multilevel jobs. Computers and Industrial Engineering, 44 (1), 119-131. (Pubitemid 35282240)
-
(2003)
Computers and Industrial Engineering
, vol.44
, Issue.1
, pp. 119-131
-
-
Mohanasundaram, K.M.1
Natarajan, K.2
Viswanathkumar, G.3
Radhakrishnan, P.4
Rajendran, C.5
-
15
-
-
33845805156
-
Performance evaluation of priority dispatching rules in multi-level assembly job shops with jobs having weights for flowtime and tardiness
-
DOI 10.1007/s00170-005-0258-8
-
Natarajan, K., et al., 2007. Performance evaluation of priority dispatching rules in multi-level assembly job shops with jobs having weights for flowtime and tardiness. International Journal of Advanced Manufacturing Technology, 31 (7-8), 751-761. (Pubitemid 46005347)
-
(2007)
International Journal of Advanced Manufacturing Technology
, vol.31
, Issue.7-8
, pp. 751-761
-
-
Natarajan, K.1
Mohanasundaram, K.M.2
Babu, B.S.3
Suresh, S.4
Raj, K.A.A.D.5
Rajendran, C.6
-
16
-
-
0026140380
-
A preliminary investigation of multipleattribute based sequencing rules for assembly shops
-
Philipoom, P.R., Russell, R.S., and Fry, T.D., 1991. A preliminary investigation of multipleattribute based sequencing rules for assembly shops. International Journal of Production Research, 29 (4), 739-753.
-
(1991)
International Journal of Production Research
, vol.29
, Issue.4
, pp. 739-753
-
-
Philipoom, P.R.1
Russell, R.S.2
Fry, T.D.3
-
17
-
-
0034659575
-
Dispatching rules for scheduling in assembly jobshops - Part 1
-
DOI 10.1080/002075400188492
-
Reeja, M.K. and Rajendran, C., 2000a. Dispatching rules for scheduling in assembly job shops - part I. International Journal of Production Research, 38 (9), 2051-2066. (Pubitemid 35401861)
-
(2000)
International Journal of Production Research
, vol.38
, Issue.9
, pp. 2051-2066
-
-
Reeja, M.K.1
Rajendran, C.2
-
18
-
-
0034631282
-
Dispatching rules for scheduling in assembly jobshops - Part 2
-
DOI 10.1080/00207540050028133
-
Reeja, M.K. and Rajendran, C., 2000b. Dispatching rules for scheduling in assembly job shops - part II. International Journal of Production Research, 38 (10), 2349-2360. (Pubitemid 35401854)
-
(2000)
International Journal of Production Research
, vol.38
, Issue.10
, pp. 2349-2360
-
-
Reeja, M.K.1
Rajendran, C.2
-
19
-
-
0022130137
-
An evaluation of scheduling policies in a dual resource constrained assembly shop
-
Russell, R.S. and Taylor, B.W., 1985. An evaluation of scheduling policies in a dual resource constrained assembly shop. IIE Transactions, 17 (3), 219-232.
-
(1985)
IIE Transactions
, vol.17
, Issue.3
, pp. 219-232
-
-
Russell, R.S.1
Taylor, B.W.2
-
20
-
-
0344152920
-
Scheduling in dynamic assembly job-shops with jobs having different holding and tardiness costs
-
Thiagarajan, S. and Rajendran, C., 2003. Scheduling in dynamic assembly job-shops with jobs having different holding and tardiness costs. International Journal of Production Research, 41 (18), 4453-4486.
-
(2003)
International Journal of Production Research
, vol.41
, Issue.18
, pp. 4453-4486
-
-
Thiagarajan, S.1
Rajendran, C.2
-
21
-
-
28044452691
-
Scheduling in dynamic assembly job-shops to minimize the sum of weighted earliness, weighted tardiness and weighted flowtime of jobs
-
DOI 10.1016/j.cie.2005.06.005, PII S036083520500104X
-
Thiagarajan, S. and Rajendran, C., 2005. Scheduling in dynamic assembly job-shops to minimize the sum of weighted earliness, weighted tardiness and weighted flowtime of jobs. Computers and Industrial Engineering, 49 (4), 463-503. (Pubitemid 41689975)
-
(2005)
Computers and Industrial Engineering
, vol.49
, Issue.4
, pp. 463-503
-
-
Thiagarajan, S.1
Rajendran, C.2
|