메뉴 건너뛰기




Volumn 49, Issue 20, 2011, Pages 6089-6105

An integrative heuristic method for detailed operations scheduling in assembly job shop systems

Author keywords

assembly job shop; scheduling heuristics; sequencing rule; simulation; tardiness

Indexed keywords

ASSEMBLY JOB SHOP; SCHEDULING HEURISTICS; SEQUENCING RULE; SIMULATION; TARDINESS;

EID: 80052144021     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207543.2010.527385     Document Type: Article
Times cited : (27)

References (21)
  • 3
    • 33646913024 scopus 로고    scopus 로고
    • Dispatching rules for dynamic scheduling of one-of-a-kind production
    • DOI 10.1080/09511920500407541, PII U380587033813
    • Choi, B.K. and You, N.K., 2006. Dispatching rules for dynamic scheduling of one-of-a-kind production. International Journal of Computer Integrated Manufacturing, 19 (4), 383-392. (Pubitemid 43791612)
    • (2006) International Journal of Computer Integrated Manufacturing , vol.19 , Issue.4 , pp. 383-392
    • Choi, B.K.1    You, N.K.2
  • 5
    • 0024641735 scopus 로고
    • The effects of product structure and sequencing rule on assembly shop performance
    • Fry, T.D., et al., 1989. The effects of product structure and sequencing rule on assembly shop performance. International Journal of Production Research, 27 (4), 671-686.
    • (1989) International Journal of Production Research , vol.27 , Issue.4 , pp. 671-686
    • Fry, T.D.1
  • 7
    • 33747140357 scopus 로고    scopus 로고
    • Dispatching rules for production scheduling in the capital goods industry
    • DOI 10.1016/j.ijpe.2005.07.005, PII S0925527306000132, Strategic Issues and Innovation in Production Economics
    • Hicks, C. and Pongcharoen, P., 2006. Dispatching rules for production scheduling in the capital goods industry. International Journal of Production Economics, 104 (1), 154-163. (Pubitemid 44224004)
    • (2006) International Journal of Production Economics , vol.104 , Issue.1 , pp. 154-163
    • Hicks, C.1    Pongcharoen, P.2
  • 8
    • 0021424669 scopus 로고
    • Comparative study of priority dispatching rules in a hybrid assembly/job shop
    • Huang, P., 1984. A comparative study of priority dispatching rules in a hybrid assembly/job shop. International Journal of Production Research, 22 (3), 375-387. (Pubitemid 14587002)
    • (1984) International Journal of Production Research , vol.22 , Issue.3 , pp. 375-387
    • Huang Philip, Y.1
  • 9
    • 0040621775 scopus 로고    scopus 로고
    • Experimental investigation of iterative simulation-based scheduling in a dynamic and stochastic job shop
    • Kutanoglu, E. and Sabuncuoglu, I., 2001. Experimental investigation of iterative simulation-based scheduling in a dynamic and stochastic job shop. Journal of Manufacturing Systems, 20 (4), 264-279.
    • (2001) Journal of Manufacturing Systems , vol.20 , Issue.4 , pp. 264-279
    • Kutanoglu, E.1    Sabuncuoglu, I.2
  • 10
    • 0017924416 scopus 로고
    • Complexity of scheduling under precedence constraints
    • Lenstra, J.K. and Rinnooy Kan, A.H.G., 1978. Computational complexity of scheduling under precedence constraints. Operations Research, 26 (1), 22-35. (Pubitemid 8576419)
    • (1978) Operations Research , vol.26 , Issue.1 , pp. 22-35
    • Lenstra, J.K.1    Rinnooy Kan, A.H.G.2
  • 11
    • 78649822911 scopus 로고    scopus 로고
    • Integrating order review/release and dispatching rules for assembly job shop scheduling using a simulation approach
    • DOI: 10.1080/00207540903524490. [In press]
    • Lu, H.L., Huang, G.Q., and Yang, H.D., 2010. Integrating order review/release and dispatching rules for assembly job shop scheduling using a simulation approach. International Journal of Production Research, DOI: 10.1080/00207540903524490. [In press].
    • (2010) International Journal of Production Research
    • Lu, H.L.1    Huang, G.Q.2    Yang, H.D.3
  • 12
    • 0001274658 scopus 로고
    • Multiple-factor rules for sequencing with assembly constraints
    • Maxwell, W.L. and Mehra, M., 1968. Multiple-factor rules for sequencing with assembly constraints. Naval Research Logistics Quarterly, 15 (2), 241-254.
    • (1968) Naval Research Logistics Quarterly , vol.15 , Issue.2 , pp. 241-254
    • Maxwell, W.L.1    Mehra, M.2
  • 16
    • 0026140380 scopus 로고
    • A preliminary investigation of multipleattribute based sequencing rules for assembly shops
    • Philipoom, P.R., Russell, R.S., and Fry, T.D., 1991. A preliminary investigation of multipleattribute based sequencing rules for assembly shops. International Journal of Production Research, 29 (4), 739-753.
    • (1991) International Journal of Production Research , vol.29 , Issue.4 , pp. 739-753
    • Philipoom, P.R.1    Russell, R.S.2    Fry, T.D.3
  • 17
    • 0034659575 scopus 로고    scopus 로고
    • Dispatching rules for scheduling in assembly jobshops - Part 1
    • DOI 10.1080/002075400188492
    • Reeja, M.K. and Rajendran, C., 2000a. Dispatching rules for scheduling in assembly job shops - part I. International Journal of Production Research, 38 (9), 2051-2066. (Pubitemid 35401861)
    • (2000) International Journal of Production Research , vol.38 , Issue.9 , pp. 2051-2066
    • Reeja, M.K.1    Rajendran, C.2
  • 18
    • 0034631282 scopus 로고    scopus 로고
    • Dispatching rules for scheduling in assembly jobshops - Part 2
    • DOI 10.1080/00207540050028133
    • Reeja, M.K. and Rajendran, C., 2000b. Dispatching rules for scheduling in assembly job shops - part II. International Journal of Production Research, 38 (10), 2349-2360. (Pubitemid 35401854)
    • (2000) International Journal of Production Research , vol.38 , Issue.10 , pp. 2349-2360
    • Reeja, M.K.1    Rajendran, C.2
  • 19
    • 0022130137 scopus 로고
    • An evaluation of scheduling policies in a dual resource constrained assembly shop
    • Russell, R.S. and Taylor, B.W., 1985. An evaluation of scheduling policies in a dual resource constrained assembly shop. IIE Transactions, 17 (3), 219-232.
    • (1985) IIE Transactions , vol.17 , Issue.3 , pp. 219-232
    • Russell, R.S.1    Taylor, B.W.2
  • 20
    • 0344152920 scopus 로고    scopus 로고
    • Scheduling in dynamic assembly job-shops with jobs having different holding and tardiness costs
    • Thiagarajan, S. and Rajendran, C., 2003. Scheduling in dynamic assembly job-shops with jobs having different holding and tardiness costs. International Journal of Production Research, 41 (18), 4453-4486.
    • (2003) International Journal of Production Research , vol.41 , Issue.18 , pp. 4453-4486
    • Thiagarajan, S.1    Rajendran, C.2
  • 21
    • 28044452691 scopus 로고    scopus 로고
    • Scheduling in dynamic assembly job-shops to minimize the sum of weighted earliness, weighted tardiness and weighted flowtime of jobs
    • DOI 10.1016/j.cie.2005.06.005, PII S036083520500104X
    • Thiagarajan, S. and Rajendran, C., 2005. Scheduling in dynamic assembly job-shops to minimize the sum of weighted earliness, weighted tardiness and weighted flowtime of jobs. Computers and Industrial Engineering, 49 (4), 463-503. (Pubitemid 41689975)
    • (2005) Computers and Industrial Engineering , vol.49 , Issue.4 , pp. 463-503
    • Thiagarajan, S.1    Rajendran, C.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.