-
1
-
-
0027627910
-
Due date assignment procedures with dynamically updated coefficients for multi-level assembly job-shops
-
ADAM, N. R., BERTRAND, J. W. M., MOREHEAD, D. C. and SURKIS, J., 1993, Due date assignment procedures with dynamically updated coefficients for multi-level assembly job-shops. European Journal of Operational Research, 68, 212-227.
-
(1993)
European Journal of Operational Research
, vol.68
, pp. 212-227
-
-
Adam, N.R.1
Bertrand, J.W.M.2
Morehead, D.C.3
Surkis, J.4
-
2
-
-
0023418695
-
Priority assignment procedures in multi-level assembly job shops
-
ADAM, N. R., BERTRAND, J. W. M. and SURKIS, J., 1987, Priority assignment procedures in multi-level assembly job shops. IIE Transactions, 19, 317-328.
-
(1987)
IIE Transactions
, vol.19
, pp. 317-328
-
-
Adam, N.R.1
Bertrand, J.W.M.2
Surkis, J.3
-
3
-
-
0000450049
-
Simulation of a simplified job-shop
-
BAKER, C. T. and DZEILINSKI, B. P., 1960, Simulation of a simplified job-shop. Management Science, 6, 311-323.
-
(1960)
Management Science
, vol.6
, pp. 311-323
-
-
Baker, C.T.1
Dzeilinski, B.P.2
-
4
-
-
0020013653
-
A state of the art survey of dispatching rules for manufacturing job shop operations
-
BLACKSTONE, J. H., PHILLIPS, D. T. and HOGG, G. L., 1982, A state of the art survey of dispatching rules for manufacturing job shop operations. International Journal of Production Research, 20, 27-45.
-
(1982)
International Journal of Production Research
, vol.20
, pp. 27-45
-
-
Blackstone, J.H.1
Phillips, D.T.2
Hogg, G.L.3
-
5
-
-
0001173522
-
An experimental investigation of priority dispatching
-
CONWAY, R. W., JOHNSON, B. M. and MAXWELL, W. L., 1960, An experimental investigation of priority dispatching. Journal of Industrial Engineering, 11, 221-230.
-
(1960)
Journal of Industrial Engineering
, vol.11
, pp. 221-230
-
-
Conway, R.W.1
Johnson, B.M.2
Maxwell, W.L.3
-
6
-
-
0002265857
-
Review of sequencing research
-
DAY, J. E. and HOTTENSTEIN, M. P., 1970, Review of sequencing research. Naval Research Logistics Quarterly, 17, 11-39.
-
(1970)
Naval Research Logistics Quarterly
, vol.17
, pp. 11-39
-
-
Day, J.E.1
Hottenstein, M.P.2
-
7
-
-
0035883114
-
Sequencing CONWIP flow-shops: Analysis and heuristics
-
FRAMINAN, J. M., RUIZ-USANO, R. and LEISTEN, R., 2001, Sequencing CONWIP flow-shops: analysis and heuristics. International Journal of Production Research, 39, 2735-2749.
-
(2001)
International Journal of Production Research
, vol.39
, pp. 2735-2749
-
-
Framinan, J.M.1
Ruiz-Usano, R.2
Leisten, R.3
-
8
-
-
0024641735
-
The effects of product structure and sequencing rule on assembly shop performance
-
FRY, T. D., OLIFF, M. D., MINOR, E. D. and LEONG, G. K., 1989, The effects of product structure and sequencing rule on assembly shop performance. International Journal of Production Research, 27, 671-686.
-
(1989)
International Journal of Production Research
, vol.27
, pp. 671-686
-
-
Fry, T.D.1
Oliff, M.D.2
Minor, E.D.3
Leong, G.K.4
-
9
-
-
84989446840
-
Operating policies for scheduling assembled products
-
GOODWIN, J. S. and GOODWIN, J. C., 1982, Operating policies for scheduling assembled products. Decision Sciences, 13, 585-603.
-
(1982)
Decision Sciences
, vol.13
, pp. 585-603
-
-
Goodwin, J.S.1
Goodwin, J.C.2
-
10
-
-
34249973653
-
A survey of priority rule based scheduling
-
HAUPT, R., 1989, A survey of priority rule based scheduling. OR spectrum, 11, 3-16.
-
(1989)
OR Spectrum
, vol.11
, pp. 3-16
-
-
Haupt, R.1
-
11
-
-
0001714459
-
Priority scheduling with cost considerations
-
HOFFMAN, T. R. and SCUDDER, G. D., 1983, Priority scheduling with cost considerations. International Journal of Production Research, 21, 881-889.
-
(1983)
International Journal of Production Research
, vol.21
, pp. 881-889
-
-
Hoffman, T.R.1
Scudder, G.D.2
-
12
-
-
0030782894
-
Efficient dispatching rules for scheduling in a job-shop
-
HOLTHAUS, O. and RAJENDRAN, C., 1997, Efficient dispatching rules for scheduling in a job-shop. International Journal of Production Economics, 48, 87-105.
-
(1997)
International Journal of Production Economics
, vol.48
, pp. 87-105
-
-
Holthaus, O.1
Rajendran, C.2
-
13
-
-
0034161039
-
Efficient job-shop dispatching rules: Further developments
-
HOLTHAUS, O. and RAJENDRAN, C., 2000, Efficient job-shop dispatching rules: further developments. Production Planning and Control, 11, 171-178.
-
(2000)
Production Planning and Control
, vol.11
, pp. 171-178
-
-
Holthaus, O.1
Rajendran, C.2
-
14
-
-
0037056089
-
A study on the performance of scheduling rules in buffer-constrained dynamic flowshops
-
HOLTHAUS, O. and RAJENDRAN, C., 2002, A study on the performance of scheduling rules in buffer-constrained dynamic flowshops. International Journal of Production Research, 40, 3041-3052.
-
(2002)
International Journal of Production Research
, vol.40
, pp. 3041-3052
-
-
Holthaus, O.1
Rajendran, C.2
-
15
-
-
0031076549
-
Improving job-shop performance by coordinating dispatching rules
-
HOLTHAUS, O. and ZIEGLER, H., 1997, Improving job-shop performance by coordinating dispatching rules. International Journal of Production Research, 35, 539-549.
-
(1997)
International Journal of Production Research
, vol.35
, pp. 539-549
-
-
Holthaus, O.1
Ziegler, H.2
-
16
-
-
0034651053
-
New dispatching rules for job-shop scheduling: A step toward
-
JAYAMOHAN, M. S. and RAJENDRAN, C., 2000, New dispatching rules for job-shop scheduling: a step toward. International Journal of Production Research, 38, 563-586.
-
(2000)
International Journal of Production Research
, vol.38
, pp. 563-586
-
-
Jayamohan, M.S.1
Rajendran, C.2
-
17
-
-
0029387523
-
Evaluation of scheduling rules with commensurate customer priorities in job shops
-
JENSEN, J. B., PHILIPOOM, P. R. and MALHOTRA, M. K., 1995, Evaluation of scheduling rules with commensurate customer priorities in job shops. Journal of Operations Management, 13, 213-228.
-
(1995)
Journal of Operations Management
, vol.13
, pp. 213-228
-
-
Jensen, J.B.1
Philipoom, P.R.2
Malhotra, M.K.3
-
18
-
-
0021521848
-
Confidence intervals for steady-state simulation: I. A survey of fixed sample survey procedures
-
LAW, A. M. and KELTON, W. D., 1984, Confidence intervals for steady-state simulation: I. A survey of fixed sample survey procedures. Operations Research, 32, 1221-1239.
-
(1984)
Operations Research
, vol.32
, pp. 1221-1239
-
-
Law, A.M.1
Kelton, W.D.2
-
20
-
-
0001274658
-
Multiple-factor rules for sequencing with assembly constraints
-
MAXWELL, W. L. and MEHRA, M., 1968, Multiple-factor rules for sequencing with assembly constraints. Naval Research Logistics Quarterly, 15, 241-254.
-
(1968)
Naval Research Logistics Quarterly
, vol.15
, pp. 241-254
-
-
Maxwell, W.L.1
Mehra, M.2
-
22
-
-
38249004133
-
Sequencing rules, progress milestones, and product structure in a multistage job shop
-
PHILLIPOOM, P. R., MARKLAND, R. E. and FRY, T. D., 1989, Sequencing rules, progress milestones, and product structure in a multistage job shop. Journal of Operations Management, 8, 209-229.
-
(1989)
Journal of Operations Management
, vol.8
, pp. 209-229
-
-
Phillipoom, P.R.1
Markland, R.E.2
Fry, T.D.3
-
23
-
-
0026140380
-
A preliminary investigation of multi-attribute based sequencing rules for assembly shops
-
PHILLIPOOM, P. R., RUSSELL, R. S. and FRY, T. D., 1991, A preliminary investigation of multi-attribute based sequencing rules for assembly shops. International Journal of Production Research, 29, 739-753.
-
(1991)
International Journal of Production Research
, vol.29
, pp. 739-753
-
-
Phillipoom, P.R.1
Russell, R.S.2
Fry, T.D.3
-
24
-
-
0040857316
-
MRP yesterday, today, and tomorrow
-
PLOSSL, G. W., 1980, MRP yesterday, today, and tomorrow. Production and Inventory Management, Third Quarter, 1-10.
-
(1980)
Production and Inventory Management, Third Quarter
, pp. 1-10
-
-
Plossl, G.W.1
-
25
-
-
29444438437
-
Dynamic job shop scheduling: A survey of simulation research
-
RAMASESH, R., 1990, Dynamic job shop scheduling: a survey of simulation research, OMEGA, 16, 43-47.
-
(1990)
OMEGA
, vol.16
, pp. 43-47
-
-
Ramasesh, R.1
-
26
-
-
0034659575
-
Dispatching rules for scheduling in assembly job shops - Part I
-
REEJA, M. K. and RAJENDRAN, C., 2000a, Dispatching rules for scheduling in assembly job shops - Part I. International Journal of Production Research, 38, 2051-2066.
-
(2000)
International Journal of Production Research
, vol.38
, pp. 2051-2066
-
-
Reeja, M.K.1
Rajendran, C.2
-
27
-
-
0034631282
-
Dispatching rules for scheduling in assembly job shops - Part II
-
REEJA, M. K. and RAJENDRAN, C., 2000b, Dispatching rules for scheduling in assembly job shops - Part II. International Journal of Production Research, 38, 2349-2360.
-
(2000)
International Journal of Production Research
, vol.38
, pp. 2349-2360
-
-
Reeja, M.K.1
Rajendran, C.2
-
29
-
-
0023437076
-
A comparative analysis of the COVERT job sequencing rule using various shop performance parameters
-
RUSSELL, R. S., DAR-EL, E. M. and TAYLOR III, B. W., 1987, A comparative analysis of the COVERT job sequencing rule using various shop performance parameters. International Journal of Production Research, 25, 1523-1540.
-
(1987)
International Journal of Production Research
, vol.25
, pp. 1523-1540
-
-
Russell, R.S.1
Dar-El, E.M.2
Taylor III, B.W.3
-
30
-
-
84985747359
-
An evaluation of sequencing rules for an assembly shop
-
RUSSELL, R. S. and TAYLOR III, B. W., 1985, An evaluation of sequencing rules for an assembly shop. Decision Sciences, 16, 196-212.
-
(1985)
Decision Sciences
, vol.16
, pp. 196-212
-
-
Russell, R.S.1
Taylor III, B.W.2
-
31
-
-
38249033542
-
The use of cost-based priorities in random and flow shops
-
SCUDDER, G. D. and HOFFMAN, T. R., 1987, The use of cost-based priorities in random and flow shops. Journal of Operations Management, 7, 217-232.
-
(1987)
Journal of Operations Management
, vol.7
, pp. 217-232
-
-
Scudder, G.D.1
Hoffman, T.R.2
-
32
-
-
0011727186
-
Priority dispatching rules in job shops with assembly operations and random delays
-
SCULLI, D., 1980, Priority dispatching rules in job shops with assembly operations and random delays. OMEGA, 8, 227-234.
-
(1980)
OMEGA
, vol.8
, pp. 227-234
-
-
Sculli, D.1
-
33
-
-
38149145323
-
Priority dispatching rules in an assembly job shop
-
SCULLI, D., 1987, Priority dispatching rules in an assembly job shop. OMEGA, 15, 49-57.
-
(1987)
OMEGA
, vol.15
, pp. 49-57
-
-
Sculli, D.1
-
34
-
-
0023399009
-
Priority rules for job shops with weighted tardiness costs
-
VEPSALAINEN, A. P. J. and MORTON, T. E., 1987, Priority rules for job shops with weighted tardiness costs. Management Science, 33, 1035-1047.
-
(1987)
Management Science
, vol.33
, pp. 1035-1047
-
-
Vepsalainen, A.P.J.1
Morton, T.E.2
-
35
-
-
0028408210
-
A comparison of job shop dispatching rules using a total cost criterion
-
YANG, K. K. and SUM, C. C., 1994, A comparison of job shop dispatching rules using a total cost criterion. International Journal of Production Research, 32, 807-820.
-
(1994)
International Journal of Production Research
, vol.32
, pp. 807-820
-
-
Yang, K.K.1
Sum, C.C.2
|