-
1
-
-
0037323522
-
Cycle time management during production ramp-up
-
Haller, M., Peikert, A., and Thoma, J. Cycle time management during production ramp-up. Robot. CIM-Int. Manuf., 2003, 19(1-2), 183-188.
-
(2003)
Robot. CIM-Int. Manuf.
, vol.19
, Issue.1-2
, pp. 183-188
-
-
Haller, M.1
Peikert, A.2
Thoma, J.3
-
2
-
-
0035615918
-
International product transfer and production ramp-up: A case study from the data storage industry
-
Terwiesch, C., Bohn, R. E., and Chea, K. S. International product transfer and production ramp-up: a case study from the data storage industry. R&D Management, 2001, 31(4), 435-451. (Pubitemid 33706935)
-
(2001)
R and D Management
, vol.31
, Issue.4
, pp. 435-451
-
-
Terwiesch, C.1
Bohn, R.E.2
Chea, K.S.3
-
4
-
-
0035283518
-
Learning and process improvement during production ramp-up
-
DOI 10.1016/S0925-5273(00)00045-1
-
Terwiesch, C. and Bohn, R. E. Learning and process improvement during production ramp-up. Int. J. Prod. Econ., 2001, 70(1), 1-19. (Pubitemid 32160564)
-
(2001)
International Journal of Production Economics
, vol.70
, Issue.1
, pp. 1-19
-
-
Terwiesch, C.1
E. Bohn, R.2
-
5
-
-
0034694507
-
Pilot production and manufacturing start-up: The case of Volvo S80
-
DOI 10.1080/00207540050205316
-
Almgren, H. Pilot production and manufacturing start-up: the case of Volvo S80. Int. J. Prod. Res., 2000, 38(17), 4577-4588. (Pubitemid 35401926)
-
(2000)
International Journal of Production Research
, vol.38
, Issue.17
, pp. 4577-4588
-
-
Almgren, H.1
-
6
-
-
0343560561
-
Controlling the manufacturing startup
-
Clawson, R. T. Controlling the manufacturing startup. Harvard Bus. Rev., 1985, 63(3), 6-20.
-
(1985)
Harvard Bus. Rev.
, vol.63
, Issue.3
, pp. 6-20
-
-
Clawson, R.T.1
-
7
-
-
85005212034
-
A methodology for planning new product start-ups
-
Abernathy, W. J. and Baloff, N. A methodology for planning new product start-ups. Decision Sci., 1973, 4(1), 1-20.
-
(1973)
Decision Sci.
, vol.4
, Issue.1
, pp. 1-20
-
-
Abernathy, W.J.1
Baloff, N.2
-
8
-
-
57749182190
-
The launch of innovative product-related services: Lessons from automotive telematics
-
Lenfle, S. and Midler, C. The launch of innovative product-related services: lessons from automotive telematics. Res. Policy, 2009, 38(1), 156-169.
-
(2009)
Res. Policy
, vol.38
, Issue.1
, pp. 156-169
-
-
Lenfle, S.1
Midler, C.2
-
9
-
-
37849017170
-
Product lifecycle-oriented quality and productivity improvement based on stream of variation methodology
-
Du, S., Xi, L., Ni, J., Ershun, P., and Liu, C. R. Product lifecycle-oriented quality and productivity improvement based on stream of variation methodology. Comput. Ind., 2008, 59(2-3), 180-192.
-
(2008)
Comput. Ind.
, vol.59
, Issue.2-3
, pp. 180-192
-
-
Du, S.1
Xi, L.2
Ni, J.3
Ershun, P.4
Liu, C.R.5
-
10
-
-
80051915536
-
Simulation-based evaluation of the ramp-up behavior of waferfabs
-
IEEEI/ SEMI, 31 March-1 April
-
Sturm, R., Dorner, J., Reddig, K., and Seidelmann, J. Simulation-based evaluation of the ramp-up behavior of waferfabs. In Advanced Semiconductor Manufacturing Conference and Workshop, IEEEI/ SEMI, 31 March-1 April 2003, pp. 111-117.
-
(2003)
Advanced Semiconductor Manufacturing Conference and Workshop
, pp. 111-117
-
-
Sturm, R.1
Dorner, J.2
Reddig, K.3
Seidelmann, J.4
-
11
-
-
59349092976
-
Information enabling production ramp-up
-
Fjallström, S., Safsten, K., Harlin, U., and Stahre, J. Information enabling production ramp-up. J. Manuf. Technol. Manage., 2009, 20(2), 178-196.
-
(2009)
J. Manuf. Technol. Manage.
, vol.20
, Issue.2
, pp. 178-196
-
-
Fjallström, S.1
Safsten, K.2
Harlin, U.3
Stahre, J.4
-
12
-
-
39449101530
-
Experience-based learning in innovation and production
-
Pruett, M. and Thomas, H. Experience-based learning in innovation and production. R&D Manage., 2008, 38(2), 141-153.
-
(2008)
R&D Manage.
, vol.38
, Issue.2
, pp. 141-153
-
-
Pruett, M.1
Thomas, H.2
-
13
-
-
80051884881
-
-
MSc Group Project Report Cranfield University Cranfield
-
Agaga, T., Brzusczak, V., Oduneye, N., Broxup, B., and Palomino Fernandez, D. Ramp-up, MSc Group Project Report, Cranfield University, Cranfield, 2008.
-
(2008)
Ramp-up
-
-
Agaga, T.1
Brzusczak, V.2
Oduneye, N.3
Broxup, B.4
Palomino Fernandez, D.5
-
14
-
-
80051905787
-
Logistic- and cost-oriented cross-company rampup planning
-
Eds P. F. Cunha and P. G. Maropoulos Springer
-
Hüntelmann, J., Reinsch, S., and Märtens, A. Logistic- and cost-oriented cross-company rampup planning. In Digital enterprise technology perspectives and future challenges (Eds P. F. Cunha and P. G. Maropoulos), 2007, pp. 115-122 (Springer).
-
(2007)
Digital Enterprise Technology Perspectives and Future Challenges
, pp. 115-122
-
-
Hüntelmann, J.1
Reinsch, S.2
Märtens, A.3
-
15
-
-
21144484576
-
Theory building through conceptual methods
-
Meredith, J. Theory building through conceptual methods. Int. J. Oper. Prod. Manage., 1993, 13(5), 3-11.
-
(1993)
Int. J. Oper. Prod. Manage.
, vol.13
, Issue.5
, pp. 3-11
-
-
Meredith, J.1
-
16
-
-
63149198826
-
How companies are reinventing their idea-to-launch methodologies
-
Cooper, R. G. How companies are reinventing their idea-to-launch methodologies. Res. Technol. Manage., 2009, 52(2), 47-57.
-
(2009)
Res. Technol. Manage.
, vol.52
, Issue.2
, pp. 47-57
-
-
Cooper, R.G.1
-
18
-
-
77956755778
-
Holistic approach for production ramp-up in automotive industry
-
(Eds A. Bramley, D. Brissaud and C. McMahon) Springer, Bath, UK
-
Schuh, G., Desoi, J.-C., and Tücks, G. Holistic approach for production ramp-up in automotive industry. In Advances in integrated design and manufacturing in mechanical engineering (Eds A. Bramley, D. Brissaud and C. McMahon), 2005, pp. 255-268 (Springer, Bath, UK).
-
(2005)
Advances in Integrated Design and Manufacturing in Mechanical Engineering
, pp. 255-268
-
-
Schuh, G.1
Desoi, J.-C.2
Tücks, G.3
-
19
-
-
80051878851
-
Production line start up
-
Koss, J. P. Production line start up. Beverage World, 1996, 115(1627), 84-85.
-
(1996)
Beverage World
, vol.115
, Issue.1627
, pp. 84-85
-
-
Koss, J.P.1
-
20
-
-
33847189578
-
A knowledge system to support manufacturing knowledge during preliminary design
-
Mountney, S. L., Gao, J. X., and Wiseall, S. A knowledge system to support manufacturing knowledge during preliminary design. Int. J. Prod. Res., 2007, 45(7), 1521-1537.
-
(2007)
Int. J. Prod. Res.
, vol.45
, Issue.7
, pp. 1521-1537
-
-
Mountney, S.L.1
Gao, J.X.2
Wiseall, S.3
-
21
-
-
84989462365
-
Start up or learning curves: Some new approaches
-
Pegels, C. C. Start up or learning curves: some new approaches. Decision Sci., 1976, 7(4), 705-713.
-
(1976)
Decision Sci.
, vol.7
, Issue.4
, pp. 705-713
-
-
Pegels, C.C.1
-
23
-
-
0000400935
-
Behind the learning curve: A sketch of the learning process
-
Adler, P. S. and Clark, K. B. Behind the learning curve: a sketch of the learning process. Manage. Sci., 1991, 37(3), 267-281.
-
(1991)
Manage. Sci.
, vol.37
, Issue.3
, pp. 267-281
-
-
Adler, P.S.1
Clark, K.B.2
-
24
-
-
0021477113
-
Estimating learning curves from aggregate monthly data
-
Womer, N. K. Estimating learning curves from aggregate monthly data. Manage. Sci., 1984, 30(8), 982-992.
-
(1984)
Manage. Sci.
, vol.30
, Issue.8
, pp. 982-992
-
-
Womer, N.K.1
-
25
-
-
0031119953
-
Yield learning in integrated circuit package assembly
-
Balasubramaniam, S., Sarwar, A. K., and Walker, D. M. H. Yield learning in integrated circuit package assembly. Components, Packaging Manuf. Technol., 1997, 20(2), 133-141.
-
(1997)
Components, Packaging Manuf. Technol.
, vol.20
, Issue.2
, pp. 133-141
-
-
Balasubramaniam, S.1
Sarwar, A.K.2
Walker, D.M.H.3
-
26
-
-
0001135843
-
Learning and forgetting: The dynamics of aircraft production
-
Benkard, C. L. Learning and forgetting: the dynamics of aircraft production. Am. Econ. Rev., 2000, 90(4), 1034-1054.
-
(2000)
Am. Econ. Rev.
, vol.90
, Issue.4
, pp. 1034-1054
-
-
Benkard . C, L.1
-
27
-
-
34447546733
-
Technical change theory and learning curves: Patterns of progress in electricity generation technologies
-
Jamasb, T. Technical change theory and learning curves: patterns of progress in electricity generation technologies. Energy J., 2007, 28(3), 51-71. (Pubitemid 47073922)
-
(2007)
Energy Journal
, vol.28
, Issue.3
, pp. 51-71
-
-
Jamasb, T.1
-
28
-
-
84989431553
-
The learning curve: Historical review and comprehensive study
-
Yelle, L. E. The learning curve: historical review and comprehensive study. Decision Sci., 1979, 10(2), 302-328.
-
(1979)
Decision Sci.
, vol.10
, Issue.2
, pp. 302-328
-
-
Yelle, L.E.1
-
29
-
-
0025021555
-
Learning curves in manufacturing
-
Argote, L. and Epple, D. Learning curves in manufacturing. Science, 1990, 247(4945), 920-924.
-
(1990)
Science
, vol.247
, Issue.4945
, pp. 920-924
-
-
Argote, L.1
Epple, D.2
-
30
-
-
84989463336
-
Effects of learning on resource allocation decisions
-
Liao, W. M. Effects of learning on resource allocation decisions. Decision Sci., 1979, 10(1), 116-125.
-
(1979)
Decision Sci.
, vol.10
, Issue.1
, pp. 116-125
-
-
Liao, W.M.1
-
31
-
-
38149027740
-
A state-of-The-art review on scheduling with learning effects
-
Biskup, D. A state-of-the-art review on scheduling with learning effects. Eur. J. Oper. Res., 2008, 188(2), 315-329.
-
(2008)
Eur. J. Oper. Res.
, vol.188
, Issue.2
, pp. 315-329
-
-
Biskup, D.1
-
32
-
-
0035780670
-
Cost model development using artificial neural networks
-
DOI 10.1108/EUM0000000006226
-
Wang, Q. and Stockton, D. J. Cost model development using artificial neural networks. Aircr. Eng. Aerosp. Technol., 2001, 73(6), 536-541. (Pubitemid 35355351)
-
(2001)
Aircraft Engineering and Aerospace Technology
, vol.73
, Issue.6
, pp. 536-541
-
-
Wang, Q.1
Stockton, D.2
-
33
-
-
0000106959
-
Theoretical foundation for a learning rate budget
-
Kantor, P. B. and Zangwill, W. I. Theoretical foundation for a learning rate budget. Manage. Sci., 1991, 37(3), 315-330.
-
(1991)
Manage. Sci.
, vol.37
, Issue.3
, pp. 315-330
-
-
Kantor, P.B.1
Zangwill, W.I.2
-
34
-
-
11244255174
-
A study of learning curve impact on three identical small spacecraft
-
Big Sky, MT, USA, 6-13 March
-
Chen, G. and McLennan, D. D. A study of learning curve impact on three identical small spacecraft. In Proceedings of the 2004 IEEE Aerospace Conference, Big Sky, MT, USA, 6-13 March 2004, vol. 6, pp. 3970- 3976.
-
(2004)
Proceedings of the 2004 IEEE Aerospace Conference
, vol.6
, pp. 3970-3976
-
-
Chen, G.1
McLennan, D.D.2
-
35
-
-
0038142348
-
Influence of manufacturing tolerance on aircraft direct operating cost (DOC)
-
Curran, R., Kundu, A., Raghunathan, S., Eakin, D., and McFadden, R. Influence of manufacturing tolerance on aircraft direct operating cost (DOC). J. Mater. Process. Techn., 2003, 138(1-3), 208-213.
-
(2003)
J. Mater. Process. Techn.
, vol.138
, Issue.1-3
, pp. 208-213
-
-
Curran, R.1
Kundu, A.2
Raghunathan, S.3
Eakin, D.4
McFadden, R.5
-
36
-
-
80051879164
-
The importance of recurring and nonrecurring costs
-
Myers, J. The importance of recurring and nonrecurring costs. Contract Manage., 2007, 3, 36-39.
-
(2007)
Contract Manage.
, vol.3
, pp. 36-39
-
-
Myers, J.1
-
37
-
-
15444373752
-
Review of aerospace engineering cost modelling: The genetic causal approach
-
DOI 10.1016/j.paerosci.2004.10.001, PII S0376042104000594
-
Curran, R., Raghunathan, S., and Price, M. Review of aerospace engineering cost modelling: the genetic causal approach. Prog. Aerosp. Sci., 2004, 40(8), 487-534. (Pubitemid 40394061)
-
(2004)
Progress in Aerospace Sciences
, vol.40
, Issue.8
, pp. 487-534
-
-
Curran, R.1
Raghunathan, S.2
Price, M.3
-
38
-
-
37249013411
-
Use of digital manufacturing to improve operator learning in aerospace assembly
-
Belfast, Northern Ireland, 18-20 September
-
Butterfield, J., Curran, R., Watson, G., Craig, C., Raghunathan, S., Collins, R., Edgar, T., Higgins, C., Burke, R., Kelly, P., and Gibson, C. Use of digital manufacturing to improve operator learning in aerospace assembly. In Proceedings of the 7th AIAA Aviation Technology, Integration and Operations Conference (ATIO) 2nd C, vol. 7865, Belfast, Northern Ireland, 18-20 September 2007.
-
(2007)
Proceedings of the 7th AIAA Aviation Technology, Integration and Operations Conference (ATIO) 2nd C
, vol.7865
-
-
Butterfield, J.1
Curran, R.2
Watson, G.3
Craig, C.4
Raghunathan, S.5
Collins, R.6
Edgar, T.7
Higgins, C.8
Burke, R.9
Kelly, P.10
Gibson, C.11
-
39
-
-
0040380993
-
Competitive cost dynamics: The experience curve
-
Hax, A. C. and Majluf, N. S. Competitive cost dynamics: the experience curve. Interfaces, 1982, 12(5), 50-61.
-
(1982)
Interfaces
, vol.12
, Issue.5
, pp. 50-61
-
-
Hax, A.C.1
Majluf, N.S.2
-
40
-
-
67449127825
-
A concept for the configuration of value added networks based on quality capabilities ramp-up
-
(Eds P. F. Cunha and P. G. Maropoulos) (Springer)
-
Lanza, G. and Ude, J. A concept for the configuration of value added networks based on quality capabilities ramp-up. In Digital enterprise technology perspectives and future challenges (Eds P. F. Cunha and P. G. Maropoulos), 2007, pp. 393-400 (Springer).
-
(2007)
Digital Enterprise Technology Perspectives and Future Challenges
, pp. 393-400
-
-
Lanza, G.1
Ude, J.2
-
41
-
-
43049103006
-
Dynamics and dynamic modelling of H2S production in sewer systems
-
Sharma, K. R., Yuan, Z., de Haas, D., Hamilton, G., Corrie, S., and Keller, J. Dynamics and dynamic modelling of H2S production in sewer systems. Water Res., 2008, 42(10-11), 2527-2538.
-
(2008)
Water Res.
, vol.42
, Issue.10-11
, pp. 2527-2538
-
-
Sharma, K.R.1
Yuan, Z.2
De Haas, D.3
Hamilton, G.4
Corrie, S.5
Keller, J.6
-
42
-
-
0032114994
-
Simulation modelling and analysis of a JIT production system
-
PII S0925527398000619
-
Baykoç, O. F. and Erol, S. Simulation modelling and analysis of a JIT production system. Int. J. Prod. Econ., 1998, 55(2), 203-212. (Pubitemid 128401611)
-
(1998)
International Journal of Production Economics
, vol.55
, Issue.2
, pp. 203-212
-
-
Baykoc, O.F.1
Erol, S.2
-
43
-
-
19244366701
-
Time-based competition in multistage manufacturing: Stream-of-variation analysis (SOVA)
-
Ceglarek, D., Huang, W., Zhou, S., Ding, Y., Kumar, R., and Zhou, Y. Time-based competition in multistage manufacturing: stream-of-variation analysis (SOVA). Int. J. Flexible Manuf. Syst., 2004, 16(1), 11-44.
-
(2004)
Int. J. Flexible Manuf. Syst.
, vol.16
, Issue.1
, pp. 11-44
-
-
Ceglarek, D.1
Huang, W.2
Zhou, S.3
Ding, Y.4
Kumar, R.5
Zhou, Y.6
-
44
-
-
12444249999
-
Integration of reconfigurable inspection with stream of variations methodology
-
DOI 10.1016/j.ijmachtools.2004.09.011, PII S0890695504002330
-
Barhak, J., Djurdjanovic, D., Spicer, P., and Katz, R. Integration of reconfigurable inspection with stream of variations methodology. Int. J. Machine Tools Manuf., 2005, 45(4-5), 407-419. (Pubitemid 40142534)
-
(2005)
International Journal of Machine Tools and Manufacture
, vol.45
, Issue.4-5
, pp. 407-419
-
-
Barhak, J.1
Djurdjanovic, D.2
Spicer, P.3
Katz, R.4
-
45
-
-
77956727605
-
A controlling system based on cause-effect relationships for the ramp-up of production systems
-
Winkler, H., Heins, M., and Nyhuis, P. A controlling system based on cause-effect relationships for the ramp-up of production systems. Prod. Eng. Res. Dev., 2007, 1, 103-111.
-
(2007)
Prod. Eng. Res. Dev.
, vol.1
, pp. 103-111
-
-
Winkler, H.1
Heins, M.2
Nyhuis, P.3
-
46
-
-
80051865693
-
A dynamic business-process based production ramp-up simulation model
-
Fleischer, J., Lanza, G., and Ender, T. A dynamic business-process based production ramp-up simulation model. Prod. Eng., 2006, 13(2), 197-200.
-
(2006)
Prod. Eng.
, vol.13
, Issue.2
, pp. 197-200
-
-
Fleischer, J.1
Lanza, G.2
Ender, T.3
-
47
-
-
53249111246
-
Modelling the costs of nonconventional oil: A case study of Canadian bitumen
-
Mejean, A. and Hope, C. Modelling the costs of nonconventional oil: a case study of Canadian bitumen. Energy Pol., 2008, 36(11), 4205-4216.
-
(2008)
Energy Pol.
, vol.36
, Issue.11
, pp. 4205-4216
-
-
Mejean, A.1
Hope, C.2
-
48
-
-
33751518145
-
An analogy-based method for estimating the costs of space-based instruments
-
Big Sky, MT, USA 8-15 March
-
Kellogg, R. and Phan, S. An analogy-based method for estimating the costs of space-based instruments. In Proceedings of the IEEE Aerospace Conference, Big Sky, MT, USA 8-15 March 2003, vol. 8, pp. 3843-3847.
-
(2003)
Proceedings of the IEEE Aerospace Conference
, vol.8
, pp. 3843-3847
-
-
Kellogg, R.1
Phan, S.2
-
49
-
-
80051911624
-
Parametric cost modeling of space missions using the Develop New Projects (DNP) implementation process
-
Brighton, UK
-
Rosenberg, L., Hihn, L., Roust, K., and Warfield, K. Parametric cost modeling of space missions using the Develop New Projects (DNP) implementation process. In Proceedings of the INCOSE Symposium, Brighton, UK, 1999.
-
(1999)
Proceedings of the INCOSE Symposium
-
-
Rosenberg, L.1
Hihn, L.2
Roust, K.3
Warfield, K.4
-
50
-
-
0040374577
-
Quantitative and qualitative cost estimating for engineering design
-
Roy, R., Kelvesjo, S., Forsberg, S., and Rush, C. Quantitative and qualitative cost estimating for engineering design. J. Eng. Design, 2001, 12(2), 147-162.
-
(2001)
J. Eng. Design
, vol.12
, Issue.2
, pp. 147-162
-
-
Roy, R.1
Kelvesjo, S.2
Forsberg, S.3
Rush, C.4
-
52
-
-
33645358949
-
-
NASA (NASA HQ, Washington, DC)
-
NASA. Cost estimating handbook, 2002 (NASA HQ, Washington, DC).
-
(2002)
Cost Estimating Handbook
-
-
-
54
-
-
0002574341
-
Verification validation, and testing
-
(Ed. J. Banks) (John Wiley & Sons, New York)
-
Balci, O. Verification, validation, and testing. In Handbook of simulation-principles, methodology, advances, applications, and practice (Ed. J. Banks), 1998, pp. 335-393 (John Wiley & Sons, New York).
-
(1998)
Handbook of Simulation-principles, Methodology, Advances, Applications, and Practice
, pp. 335-393
-
-
Balci, O.1
|