메뉴 건너뛰기




Volumn 225, Issue 6, 2011, Pages 959-971

Modelling production ramp-up of engineering products

Author keywords

Engineering products; Learning curves; New product introduction; Production ramp up modelling

Indexed keywords

ENGINEERED PRODUCTS; LEARNING CURVES; MODELLING TOOLS; NEW PRODUCT; NEW PRODUCT INTRODUCTIONS; PLANNING AND EXECUTION; SPECIFIC COMPONENT;

EID: 80051899612     PISSN: 09544054     EISSN: 20412975     Source Type: Journal    
DOI: 10.1177/09544054JEM2071     Document Type: Review
Times cited : (26)

References (54)
  • 1
    • 0037323522 scopus 로고    scopus 로고
    • Cycle time management during production ramp-up
    • Haller, M., Peikert, A., and Thoma, J. Cycle time management during production ramp-up. Robot. CIM-Int. Manuf., 2003, 19(1-2), 183-188.
    • (2003) Robot. CIM-Int. Manuf. , vol.19 , Issue.1-2 , pp. 183-188
    • Haller, M.1    Peikert, A.2    Thoma, J.3
  • 2
    • 0035615918 scopus 로고    scopus 로고
    • International product transfer and production ramp-up: A case study from the data storage industry
    • Terwiesch, C., Bohn, R. E., and Chea, K. S. International product transfer and production ramp-up: a case study from the data storage industry. R&D Management, 2001, 31(4), 435-451. (Pubitemid 33706935)
    • (2001) R and D Management , vol.31 , Issue.4 , pp. 435-451
    • Terwiesch, C.1    Bohn, R.E.2    Chea, K.S.3
  • 4
    • 0035283518 scopus 로고    scopus 로고
    • Learning and process improvement during production ramp-up
    • DOI 10.1016/S0925-5273(00)00045-1
    • Terwiesch, C. and Bohn, R. E. Learning and process improvement during production ramp-up. Int. J. Prod. Econ., 2001, 70(1), 1-19. (Pubitemid 32160564)
    • (2001) International Journal of Production Economics , vol.70 , Issue.1 , pp. 1-19
    • Terwiesch, C.1    E. Bohn, R.2
  • 5
    • 0034694507 scopus 로고    scopus 로고
    • Pilot production and manufacturing start-up: The case of Volvo S80
    • DOI 10.1080/00207540050205316
    • Almgren, H. Pilot production and manufacturing start-up: the case of Volvo S80. Int. J. Prod. Res., 2000, 38(17), 4577-4588. (Pubitemid 35401926)
    • (2000) International Journal of Production Research , vol.38 , Issue.17 , pp. 4577-4588
    • Almgren, H.1
  • 6
    • 0343560561 scopus 로고
    • Controlling the manufacturing startup
    • Clawson, R. T. Controlling the manufacturing startup. Harvard Bus. Rev., 1985, 63(3), 6-20.
    • (1985) Harvard Bus. Rev. , vol.63 , Issue.3 , pp. 6-20
    • Clawson, R.T.1
  • 7
    • 85005212034 scopus 로고
    • A methodology for planning new product start-ups
    • Abernathy, W. J. and Baloff, N. A methodology for planning new product start-ups. Decision Sci., 1973, 4(1), 1-20.
    • (1973) Decision Sci. , vol.4 , Issue.1 , pp. 1-20
    • Abernathy, W.J.1    Baloff, N.2
  • 8
    • 57749182190 scopus 로고    scopus 로고
    • The launch of innovative product-related services: Lessons from automotive telematics
    • Lenfle, S. and Midler, C. The launch of innovative product-related services: lessons from automotive telematics. Res. Policy, 2009, 38(1), 156-169.
    • (2009) Res. Policy , vol.38 , Issue.1 , pp. 156-169
    • Lenfle, S.1    Midler, C.2
  • 9
    • 37849017170 scopus 로고    scopus 로고
    • Product lifecycle-oriented quality and productivity improvement based on stream of variation methodology
    • Du, S., Xi, L., Ni, J., Ershun, P., and Liu, C. R. Product lifecycle-oriented quality and productivity improvement based on stream of variation methodology. Comput. Ind., 2008, 59(2-3), 180-192.
    • (2008) Comput. Ind. , vol.59 , Issue.2-3 , pp. 180-192
    • Du, S.1    Xi, L.2    Ni, J.3    Ershun, P.4    Liu, C.R.5
  • 12
    • 39449101530 scopus 로고    scopus 로고
    • Experience-based learning in innovation and production
    • Pruett, M. and Thomas, H. Experience-based learning in innovation and production. R&D Manage., 2008, 38(2), 141-153.
    • (2008) R&D Manage. , vol.38 , Issue.2 , pp. 141-153
    • Pruett, M.1    Thomas, H.2
  • 15
    • 21144484576 scopus 로고
    • Theory building through conceptual methods
    • Meredith, J. Theory building through conceptual methods. Int. J. Oper. Prod. Manage., 1993, 13(5), 3-11.
    • (1993) Int. J. Oper. Prod. Manage. , vol.13 , Issue.5 , pp. 3-11
    • Meredith, J.1
  • 16
    • 63149198826 scopus 로고    scopus 로고
    • How companies are reinventing their idea-to-launch methodologies
    • Cooper, R. G. How companies are reinventing their idea-to-launch methodologies. Res. Technol. Manage., 2009, 52(2), 47-57.
    • (2009) Res. Technol. Manage. , vol.52 , Issue.2 , pp. 47-57
    • Cooper, R.G.1
  • 18
    • 77956755778 scopus 로고    scopus 로고
    • Holistic approach for production ramp-up in automotive industry
    • (Eds A. Bramley, D. Brissaud and C. McMahon) Springer, Bath, UK
    • Schuh, G., Desoi, J.-C., and Tücks, G. Holistic approach for production ramp-up in automotive industry. In Advances in integrated design and manufacturing in mechanical engineering (Eds A. Bramley, D. Brissaud and C. McMahon), 2005, pp. 255-268 (Springer, Bath, UK).
    • (2005) Advances in Integrated Design and Manufacturing in Mechanical Engineering , pp. 255-268
    • Schuh, G.1    Desoi, J.-C.2    Tücks, G.3
  • 19
    • 80051878851 scopus 로고    scopus 로고
    • Production line start up
    • Koss, J. P. Production line start up. Beverage World, 1996, 115(1627), 84-85.
    • (1996) Beverage World , vol.115 , Issue.1627 , pp. 84-85
    • Koss, J.P.1
  • 20
    • 33847189578 scopus 로고    scopus 로고
    • A knowledge system to support manufacturing knowledge during preliminary design
    • Mountney, S. L., Gao, J. X., and Wiseall, S. A knowledge system to support manufacturing knowledge during preliminary design. Int. J. Prod. Res., 2007, 45(7), 1521-1537.
    • (2007) Int. J. Prod. Res. , vol.45 , Issue.7 , pp. 1521-1537
    • Mountney, S.L.1    Gao, J.X.2    Wiseall, S.3
  • 21
    • 84989462365 scopus 로고
    • Start up or learning curves: Some new approaches
    • Pegels, C. C. Start up or learning curves: some new approaches. Decision Sci., 1976, 7(4), 705-713.
    • (1976) Decision Sci. , vol.7 , Issue.4 , pp. 705-713
    • Pegels, C.C.1
  • 23
    • 0000400935 scopus 로고
    • Behind the learning curve: A sketch of the learning process
    • Adler, P. S. and Clark, K. B. Behind the learning curve: a sketch of the learning process. Manage. Sci., 1991, 37(3), 267-281.
    • (1991) Manage. Sci. , vol.37 , Issue.3 , pp. 267-281
    • Adler, P.S.1    Clark, K.B.2
  • 24
    • 0021477113 scopus 로고
    • Estimating learning curves from aggregate monthly data
    • Womer, N. K. Estimating learning curves from aggregate monthly data. Manage. Sci., 1984, 30(8), 982-992.
    • (1984) Manage. Sci. , vol.30 , Issue.8 , pp. 982-992
    • Womer, N.K.1
  • 26
    • 0001135843 scopus 로고    scopus 로고
    • Learning and forgetting: The dynamics of aircraft production
    • Benkard, C. L. Learning and forgetting: the dynamics of aircraft production. Am. Econ. Rev., 2000, 90(4), 1034-1054.
    • (2000) Am. Econ. Rev. , vol.90 , Issue.4 , pp. 1034-1054
    • Benkard . C, L.1
  • 27
    • 34447546733 scopus 로고    scopus 로고
    • Technical change theory and learning curves: Patterns of progress in electricity generation technologies
    • Jamasb, T. Technical change theory and learning curves: patterns of progress in electricity generation technologies. Energy J., 2007, 28(3), 51-71. (Pubitemid 47073922)
    • (2007) Energy Journal , vol.28 , Issue.3 , pp. 51-71
    • Jamasb, T.1
  • 28
    • 84989431553 scopus 로고
    • The learning curve: Historical review and comprehensive study
    • Yelle, L. E. The learning curve: historical review and comprehensive study. Decision Sci., 1979, 10(2), 302-328.
    • (1979) Decision Sci. , vol.10 , Issue.2 , pp. 302-328
    • Yelle, L.E.1
  • 29
    • 0025021555 scopus 로고
    • Learning curves in manufacturing
    • Argote, L. and Epple, D. Learning curves in manufacturing. Science, 1990, 247(4945), 920-924.
    • (1990) Science , vol.247 , Issue.4945 , pp. 920-924
    • Argote, L.1    Epple, D.2
  • 30
    • 84989463336 scopus 로고
    • Effects of learning on resource allocation decisions
    • Liao, W. M. Effects of learning on resource allocation decisions. Decision Sci., 1979, 10(1), 116-125.
    • (1979) Decision Sci. , vol.10 , Issue.1 , pp. 116-125
    • Liao, W.M.1
  • 31
    • 38149027740 scopus 로고    scopus 로고
    • A state-of-The-art review on scheduling with learning effects
    • Biskup, D. A state-of-the-art review on scheduling with learning effects. Eur. J. Oper. Res., 2008, 188(2), 315-329.
    • (2008) Eur. J. Oper. Res. , vol.188 , Issue.2 , pp. 315-329
    • Biskup, D.1
  • 32
    • 0035780670 scopus 로고    scopus 로고
    • Cost model development using artificial neural networks
    • DOI 10.1108/EUM0000000006226
    • Wang, Q. and Stockton, D. J. Cost model development using artificial neural networks. Aircr. Eng. Aerosp. Technol., 2001, 73(6), 536-541. (Pubitemid 35355351)
    • (2001) Aircraft Engineering and Aerospace Technology , vol.73 , Issue.6 , pp. 536-541
    • Wang, Q.1    Stockton, D.2
  • 33
    • 0000106959 scopus 로고
    • Theoretical foundation for a learning rate budget
    • Kantor, P. B. and Zangwill, W. I. Theoretical foundation for a learning rate budget. Manage. Sci., 1991, 37(3), 315-330.
    • (1991) Manage. Sci. , vol.37 , Issue.3 , pp. 315-330
    • Kantor, P.B.1    Zangwill, W.I.2
  • 34
    • 11244255174 scopus 로고    scopus 로고
    • A study of learning curve impact on three identical small spacecraft
    • Big Sky, MT, USA, 6-13 March
    • Chen, G. and McLennan, D. D. A study of learning curve impact on three identical small spacecraft. In Proceedings of the 2004 IEEE Aerospace Conference, Big Sky, MT, USA, 6-13 March 2004, vol. 6, pp. 3970- 3976.
    • (2004) Proceedings of the 2004 IEEE Aerospace Conference , vol.6 , pp. 3970-3976
    • Chen, G.1    McLennan, D.D.2
  • 35
    • 0038142348 scopus 로고    scopus 로고
    • Influence of manufacturing tolerance on aircraft direct operating cost (DOC)
    • Curran, R., Kundu, A., Raghunathan, S., Eakin, D., and McFadden, R. Influence of manufacturing tolerance on aircraft direct operating cost (DOC). J. Mater. Process. Techn., 2003, 138(1-3), 208-213.
    • (2003) J. Mater. Process. Techn. , vol.138 , Issue.1-3 , pp. 208-213
    • Curran, R.1    Kundu, A.2    Raghunathan, S.3    Eakin, D.4    McFadden, R.5
  • 36
    • 80051879164 scopus 로고    scopus 로고
    • The importance of recurring and nonrecurring costs
    • Myers, J. The importance of recurring and nonrecurring costs. Contract Manage., 2007, 3, 36-39.
    • (2007) Contract Manage. , vol.3 , pp. 36-39
    • Myers, J.1
  • 37
    • 15444373752 scopus 로고    scopus 로고
    • Review of aerospace engineering cost modelling: The genetic causal approach
    • DOI 10.1016/j.paerosci.2004.10.001, PII S0376042104000594
    • Curran, R., Raghunathan, S., and Price, M. Review of aerospace engineering cost modelling: the genetic causal approach. Prog. Aerosp. Sci., 2004, 40(8), 487-534. (Pubitemid 40394061)
    • (2004) Progress in Aerospace Sciences , vol.40 , Issue.8 , pp. 487-534
    • Curran, R.1    Raghunathan, S.2    Price, M.3
  • 39
    • 0040380993 scopus 로고
    • Competitive cost dynamics: The experience curve
    • Hax, A. C. and Majluf, N. S. Competitive cost dynamics: the experience curve. Interfaces, 1982, 12(5), 50-61.
    • (1982) Interfaces , vol.12 , Issue.5 , pp. 50-61
    • Hax, A.C.1    Majluf, N.S.2
  • 40
    • 67449127825 scopus 로고    scopus 로고
    • A concept for the configuration of value added networks based on quality capabilities ramp-up
    • (Eds P. F. Cunha and P. G. Maropoulos) (Springer)
    • Lanza, G. and Ude, J. A concept for the configuration of value added networks based on quality capabilities ramp-up. In Digital enterprise technology perspectives and future challenges (Eds P. F. Cunha and P. G. Maropoulos), 2007, pp. 393-400 (Springer).
    • (2007) Digital Enterprise Technology Perspectives and Future Challenges , pp. 393-400
    • Lanza, G.1    Ude, J.2
  • 41
    • 43049103006 scopus 로고    scopus 로고
    • Dynamics and dynamic modelling of H2S production in sewer systems
    • Sharma, K. R., Yuan, Z., de Haas, D., Hamilton, G., Corrie, S., and Keller, J. Dynamics and dynamic modelling of H2S production in sewer systems. Water Res., 2008, 42(10-11), 2527-2538.
    • (2008) Water Res. , vol.42 , Issue.10-11 , pp. 2527-2538
    • Sharma, K.R.1    Yuan, Z.2    De Haas, D.3    Hamilton, G.4    Corrie, S.5    Keller, J.6
  • 42
    • 0032114994 scopus 로고    scopus 로고
    • Simulation modelling and analysis of a JIT production system
    • PII S0925527398000619
    • Baykoç, O. F. and Erol, S. Simulation modelling and analysis of a JIT production system. Int. J. Prod. Econ., 1998, 55(2), 203-212. (Pubitemid 128401611)
    • (1998) International Journal of Production Economics , vol.55 , Issue.2 , pp. 203-212
    • Baykoc, O.F.1    Erol, S.2
  • 43
    • 19244366701 scopus 로고    scopus 로고
    • Time-based competition in multistage manufacturing: Stream-of-variation analysis (SOVA)
    • Ceglarek, D., Huang, W., Zhou, S., Ding, Y., Kumar, R., and Zhou, Y. Time-based competition in multistage manufacturing: stream-of-variation analysis (SOVA). Int. J. Flexible Manuf. Syst., 2004, 16(1), 11-44.
    • (2004) Int. J. Flexible Manuf. Syst. , vol.16 , Issue.1 , pp. 11-44
    • Ceglarek, D.1    Huang, W.2    Zhou, S.3    Ding, Y.4    Kumar, R.5    Zhou, Y.6
  • 44
    • 12444249999 scopus 로고    scopus 로고
    • Integration of reconfigurable inspection with stream of variations methodology
    • DOI 10.1016/j.ijmachtools.2004.09.011, PII S0890695504002330
    • Barhak, J., Djurdjanovic, D., Spicer, P., and Katz, R. Integration of reconfigurable inspection with stream of variations methodology. Int. J. Machine Tools Manuf., 2005, 45(4-5), 407-419. (Pubitemid 40142534)
    • (2005) International Journal of Machine Tools and Manufacture , vol.45 , Issue.4-5 , pp. 407-419
    • Barhak, J.1    Djurdjanovic, D.2    Spicer, P.3    Katz, R.4
  • 45
    • 77956727605 scopus 로고    scopus 로고
    • A controlling system based on cause-effect relationships for the ramp-up of production systems
    • Winkler, H., Heins, M., and Nyhuis, P. A controlling system based on cause-effect relationships for the ramp-up of production systems. Prod. Eng. Res. Dev., 2007, 1, 103-111.
    • (2007) Prod. Eng. Res. Dev. , vol.1 , pp. 103-111
    • Winkler, H.1    Heins, M.2    Nyhuis, P.3
  • 46
    • 80051865693 scopus 로고    scopus 로고
    • A dynamic business-process based production ramp-up simulation model
    • Fleischer, J., Lanza, G., and Ender, T. A dynamic business-process based production ramp-up simulation model. Prod. Eng., 2006, 13(2), 197-200.
    • (2006) Prod. Eng. , vol.13 , Issue.2 , pp. 197-200
    • Fleischer, J.1    Lanza, G.2    Ender, T.3
  • 47
    • 53249111246 scopus 로고    scopus 로고
    • Modelling the costs of nonconventional oil: A case study of Canadian bitumen
    • Mejean, A. and Hope, C. Modelling the costs of nonconventional oil: a case study of Canadian bitumen. Energy Pol., 2008, 36(11), 4205-4216.
    • (2008) Energy Pol. , vol.36 , Issue.11 , pp. 4205-4216
    • Mejean, A.1    Hope, C.2
  • 48
    • 33751518145 scopus 로고    scopus 로고
    • An analogy-based method for estimating the costs of space-based instruments
    • Big Sky, MT, USA 8-15 March
    • Kellogg, R. and Phan, S. An analogy-based method for estimating the costs of space-based instruments. In Proceedings of the IEEE Aerospace Conference, Big Sky, MT, USA 8-15 March 2003, vol. 8, pp. 3843-3847.
    • (2003) Proceedings of the IEEE Aerospace Conference , vol.8 , pp. 3843-3847
    • Kellogg, R.1    Phan, S.2
  • 49
    • 80051911624 scopus 로고    scopus 로고
    • Parametric cost modeling of space missions using the Develop New Projects (DNP) implementation process
    • Brighton, UK
    • Rosenberg, L., Hihn, L., Roust, K., and Warfield, K. Parametric cost modeling of space missions using the Develop New Projects (DNP) implementation process. In Proceedings of the INCOSE Symposium, Brighton, UK, 1999.
    • (1999) Proceedings of the INCOSE Symposium
    • Rosenberg, L.1    Hihn, L.2    Roust, K.3    Warfield, K.4
  • 50
    • 0040374577 scopus 로고    scopus 로고
    • Quantitative and qualitative cost estimating for engineering design
    • Roy, R., Kelvesjo, S., Forsberg, S., and Rush, C. Quantitative and qualitative cost estimating for engineering design. J. Eng. Design, 2001, 12(2), 147-162.
    • (2001) J. Eng. Design , vol.12 , Issue.2 , pp. 147-162
    • Roy, R.1    Kelvesjo, S.2    Forsberg, S.3    Rush, C.4
  • 52
    • 33645358949 scopus 로고    scopus 로고
    • NASA (NASA HQ, Washington, DC)
    • NASA. Cost estimating handbook, 2002 (NASA HQ, Washington, DC).
    • (2002) Cost Estimating Handbook


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.