메뉴 건너뛰기




Volumn 98, Issue 1-4, 2000, Pages 313-331

Asymmetric Earliness and Tardiness Scheduling with Exponential Processing Times on an Unreliable Machine

Author keywords

Dynamic programming; Earliness tardiness scheduling; Random due dates; Random processing times; Stochastic machine breakdowns

Indexed keywords


EID: 0034558594     PISSN: 02545330     EISSN: 15729338     Source Type: Journal    
DOI: 10.1023/a:1019220826984     Document Type: Article
Times cited : (27)

References (21)
  • 1
    • 0030174509 scopus 로고    scopus 로고
    • The single-machine absolute-deviation early-tardy problem with random completion times
    • U.M. Al-Turck, J. Mittenthal and M. Raghavachari, The single-machine absolute-deviation early-tardy problem with random completion times, Naval Research Logistics 43 (1996) 573-587.
    • (1996) Naval Research Logistics , vol.43 , pp. 573-587
    • Al-Turck, U.M.1    Mittenthal, J.2    Raghavachari, M.3
  • 2
    • 0031275545 scopus 로고    scopus 로고
    • Scheduling about an unrestricted common due window with arbitrary earliness/tardiness penalty rates
    • M. Azizoglu and S. Webster, Scheduling about an unrestricted common due window with arbitrary earliness/tardiness penalty rates, IIE Transactions 29 (1997) 1001-1006.
    • (1997) IIE Transactions , vol.29 , pp. 1001-1006
    • Azizoglu, M.1    Webster, S.2
  • 3
    • 0031147485 scopus 로고    scopus 로고
    • Scheduling job families about an unrestricted common due date on a single machine
    • M. Azizoglu and S. Webster, Scheduling job families about an unrestricted common due date on a single machine, International Journal of Production Research 35 (1997) 1321-1330.
    • (1997) International Journal of Production Research , vol.35 , pp. 1321-1330
    • Azizoglu, M.1    Webster, S.2
  • 4
    • 0025211593 scopus 로고
    • Sequencing with earliness and tardiness penalties: A review
    • K.R. Baker and G.D. Scudder, Sequencing with earliness and tardiness penalties: a review, Operations Research 38 (1990) 22-36.
    • (1990) Operations Research , vol.38 , pp. 22-36
    • Baker, K.R.1    Scudder, G.D.2
  • 6
    • 0032654777 scopus 로고    scopus 로고
    • Stochastic scheduling on parallel machines subject to random breakdowns to minimize expected costs for earliness and tardy jobs
    • X. Cai and S. Zhou, Stochastic scheduling on parallel machines subject to random breakdowns to minimize expected costs for earliness and tardy jobs, Operations Research 47 (1999) 422-437.
    • (1999) Operations Research , vol.47 , pp. 422-437
    • Cai, X.1    Zhou, S.2
  • 7
    • 0031234090 scopus 로고    scopus 로고
    • Scheduling stochastic jobs with asymmetric earliness and tardiness penalties
    • X. Cai and S. Zhou, Scheduling stochastic jobs with asymmetric earliness and tardiness penalties, Naval Research Logistics 44 (1997) 531-557.
    • (1997) Naval Research Logistics , vol.44 , pp. 531-557
    • Cai, X.1    Zhou, S.2
  • 8
    • 0031505653 scopus 로고    scopus 로고
    • Sequencing jobs with random processing times to minimize weighted completion time variance
    • X. Cai and S. Zhou, Sequencing jobs with random processing times to minimize weighted completion time variance, Annals of Operations Research, 70 (1997) 241-260.
    • (1997) Annals of Operations Research , vol.70 , pp. 241-260
    • Cai, X.1    Zhou, S.2
  • 9
    • 0030392840 scopus 로고    scopus 로고
    • Scheduling jobs with random processing times on a single machine subject to stochastic breakdowns to minimize early-tardy penalties
    • X. Cai and F.S. Tu, Scheduling jobs with random processing times on a single machine subject to stochastic breakdowns to minimize early-tardy penalties, Naval Research Logistics 43 (1996) 1127-1146.
    • (1996) Naval Research Logistics , vol.43 , pp. 1127-1146
    • Cai, X.1    Tu, F.S.2
  • 10
    • 0029378209 scopus 로고
    • Minimization of agreeably weighted variance in single machine systems
    • X. Cai, Minimization of agreeably weighted variance in single machine systems, European Journal of Operational Research 85 (1995) 576-592.
    • (1995) European Journal of Operational Research , vol.85 , pp. 576-592
    • Cai, X.1
  • 11
    • 0022768284 scopus 로고
    • A Single machine scheduling problem with random processing times
    • S. Chakravarthy, A Single machine scheduling problem with random processing times, Naval Research Logistics 33 (1986) 391-397.
    • (1986) Naval Research Logistics , vol.33 , pp. 391-397
    • Chakravarthy, S.1
  • 12
    • 0002957133 scopus 로고    scopus 로고
    • A review of machine scheduling: Complexity, algorithms, and approximability
    • eds. D.-Z. Du and P. Pardalos Kluwer Academic
    • B. Chen, C.N. Potts and G.J. Woeginger, A review of machine scheduling: complexity, algorithms, and approximability, in: Handbook of Combinatorial Optimization, eds. D.-Z. Du and P. Pardalos (Kluwer Academic, 1998).
    • (1998) Handbook of Combinatorial Optimization
    • Chen, B.1    Potts, C.N.2    Woeginger, G.J.3
  • 13
    • 0026142578 scopus 로고
    • Optimal assignment of slack due-dates and sequencing of jobs with random processing times on a single machine
    • T.C.E. Cheng, Optimal assignment of slack due-dates and sequencing of jobs with random processing times on a single machine, European Journal of Operational Research 51 (1991) 348-353.
    • (1991) European Journal of Operational Research , vol.51 , pp. 348-353
    • Cheng, T.C.E.1
  • 14
    • 0024303531 scopus 로고
    • Survey of scheduling research involving due date determination decisions
    • T.C.E. Cheng and M. Gupta, Survey of scheduling research involving due date determination decisions, European Journal of Operational Research 38 (1989) 156-166.
    • (1989) European Journal of Operational Research , vol.38 , pp. 156-166
    • Cheng, T.C.E.1    Gupta, M.2
  • 15
    • 0027540836 scopus 로고
    • Common due date scheduling problem with separate earliness and tardiness penalties
    • P. Dileepan, Common due date scheduling problem with separate earliness and tardiness penalties, Computers and Operations Research 20 (1991) 179-184.
    • (1991) Computers and Operations Research , vol.20 , pp. 179-184
    • Dileepan, P.1
  • 16
    • 0025897854 scopus 로고
    • Minimizing weighted number of tardy jobs and weighted earliness-tardiness penalties about a common due date
    • C.-Y. Lee, Danusaputro and Lin, Minimizing weighted number of tardy jobs and weighted earliness-tardiness penalties about a common due date, Computers and Operations Research 18 (1991) 379-389.
    • (1991) Computers and Operations Research , vol.18 , pp. 379-389
    • Lee, C.-Y.1    Danusaputro2    Lin3
  • 17
    • 0001002199 scopus 로고
    • Stochastic single machine scheduling with quadratic early-tardy penalties
    • J. Mittenthal and M. Raghavachari, Stochastic single machine scheduling with quadratic early-tardy penalties, Operations Research 41 (1993) 786-796.
    • (1993) Operations Research , vol.41 , pp. 786-796
    • Mittenthal, J.1    Raghavachari, M.2
  • 20
    • 0023170104 scopus 로고
    • Deterministic and random single machine sequencing with variance minimization
    • V. Vani and M. Raghavachari, Deterministic and random single machine sequencing with variance minimization, Operations Research 35 (1987) 111-120.
    • (1987) Operations Research , vol.35 , pp. 111-120
    • Vani, V.1    Raghavachari, M.2
  • 21
    • 0001949808 scopus 로고
    • Scheduling tasks with exponential service times on nonidentical processors to minimize makespan or flow time
    • G. Weiss and M. Pinedo, Scheduling tasks with exponential service times on nonidentical processors to minimize makespan or flow time, Journal of Applied Probability 17 (1980) 187-202.
    • (1980) Journal of Applied Probability , vol.17 , pp. 187-202
    • Weiss, G.1    Pinedo, M.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.