메뉴 건너뛰기




Volumn 17, Issue 4, 2003, Pages 467-485

Stochastic scheduling with preemptive-repeat machine breakdowns to minimize the expected weighted flow time

Author keywords

[No Author keywords available]

Indexed keywords

SCHEDULING; STOCHASTIC SYSTEMS;

EID: 1642492010     PISSN: 02699648     EISSN: None     Source Type: Journal    
DOI: 10.1017/S0269964803174037     Document Type: Article
Times cited : (26)

References (11)
  • 1
    • 84989688255 scopus 로고
    • Scheduling on a single machine with a single breakdown to minimize stochastically the number of tardy jobs
    • Adiri, I., Frostig, E., & Rinnooy Kan, A.H.G. (1991). Scheduling on a single machine with a single breakdown to minimize stochastically the number of tardy jobs. Naval Research Logistics 38: 261-271.
    • (1991) Naval Research Logistics , vol.38 , pp. 261-271
    • Adiri, I.1    Frostig, E.2    Rinnooy Kan, A.H.G.3
  • 3
    • 0032654777 scopus 로고    scopus 로고
    • Stochastic scheduling on parallel machine subject to random breakdowns to minimize expected costs for earliness and tardy cost
    • Cai, X. & Zhou, X. (1999). Stochastic scheduling on parallel machine subject to random breakdowns to minimize expected costs for earliness and tardy cost. Operations Research 47: 422-437.
    • (1999) Operations Research , vol.47 , pp. 422-437
    • Cai, X.1    Zhou, X.2
  • 4
    • 0034558594 scopus 로고    scopus 로고
    • Asymmetric earliness-tardiness scheduling with exponential processing times on an unreliable machine
    • Cai, X. & Zhou, X. (2000), Asymmetric earliness-tardiness scheduling with exponential processing times on an unreliable machine. Annals of Operations Research 98: 313-331.
    • (2000) Annals of Operations Research , vol.98 , pp. 313-331
    • Cai, X.1    Zhou, X.2
  • 5
    • 84974201117 scopus 로고
    • A note on stochastic scheduling on a single machine subject to breakdown - The preemptive repeat model
    • Frostig, E. (1991). A note on stochastic scheduling on a single machine subject to breakdown - the preemptive repeat model. Probability in the Engineering and Informational Sciences 5: 349-354.
    • (1991) Probability in the Engineering and Informational Sciences , vol.5 , pp. 349-354
    • Frostig, E.1
  • 6
    • 0021444223 scopus 로고
    • Scheduling stochastic jobs on a single machine subject to breakdowns
    • Glazebrook, K.D. (1984). Scheduling stochastic jobs on a single machine subject to breakdowns. Naval Research Logistics Quarterly 31: 251-264.
    • (1984) Naval Research Logistics Quarterly , vol.31 , pp. 251-264
    • Glazebrook, K.D.1
  • 7
    • 0023367406 scopus 로고
    • Evaluating the effects of machine breakdowns in scheduling stochastic problems
    • Glazebrook, K.D. (1987). Evaluating the effects of machine breakdowns in scheduling stochastic problems. Naval Research Logistics 34: 319-335.
    • (1987) Naval Research Logistics , vol.34 , pp. 319-335
    • Glazebrook, K.D.1
  • 8
    • 0001002199 scopus 로고
    • Stochastic single machine scheduling with quadratic early-tardy penalties
    • Mittenthal, J. & Raghavachari, M. (1993). Stochastic single machine scheduling with quadratic early-tardy penalties. Operations Research 41: 786-796.
    • (1993) Operations Research , vol.41 , pp. 786-796
    • Mittenthal, J.1    Raghavachari, M.2
  • 11
    • 0031214284 scopus 로고    scopus 로고
    • General stochastic single-machine scheduling with regular cost functions
    • Zhou, X. & Cai, X. (1997). General stochastic single-machine scheduling with regular cost functions. Mathematical and Computer Modelling 26; 95-108.
    • (1997) Mathematical and Computer Modelling , vol.26 , pp. 95-108
    • Zhou, X.1    Cai, X.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.