-
1
-
-
84989688255
-
Scheduling on a single machine with a single breakdown to minimize stochastically the number of tardy jobs
-
Adiri, I., Frostig, E., & Rinnooy Kan, A.H.G. (1991). Scheduling on a single machine with a single breakdown to minimize stochastically the number of tardy jobs. Naval Research Logistics 38: 261-271.
-
(1991)
Naval Research Logistics
, vol.38
, pp. 261-271
-
-
Adiri, I.1
Frostig, E.2
Rinnooy Kan, A.H.G.3
-
2
-
-
0025498911
-
Single-machine scheduling subject to stochastic breakdown
-
Birge, J., Frenk, J.B.G., Mittenthal, J., & Rinnooy Kan, A.H.G. (1990). Single-machine scheduling subject to stochastic breakdown. Naval Research Logistics 37: 661-677.
-
(1990)
Naval Research Logistics
, vol.37
, pp. 661-677
-
-
Birge, J.1
Frenk, J.B.G.2
Mittenthal, J.3
Rinnooy Kan, A.H.G.4
-
3
-
-
0032654777
-
Stochastic scheduling on parallel machine subject to random breakdowns to minimize expected costs for earliness and tardy cost
-
Cai, X. & Zhou, X. (1999). Stochastic scheduling on parallel machine subject to random breakdowns to minimize expected costs for earliness and tardy cost. Operations Research 47: 422-437.
-
(1999)
Operations Research
, vol.47
, pp. 422-437
-
-
Cai, X.1
Zhou, X.2
-
4
-
-
0034558594
-
Asymmetric earliness-tardiness scheduling with exponential processing times on an unreliable machine
-
Cai, X. & Zhou, X. (2000), Asymmetric earliness-tardiness scheduling with exponential processing times on an unreliable machine. Annals of Operations Research 98: 313-331.
-
(2000)
Annals of Operations Research
, vol.98
, pp. 313-331
-
-
Cai, X.1
Zhou, X.2
-
5
-
-
84974201117
-
A note on stochastic scheduling on a single machine subject to breakdown - The preemptive repeat model
-
Frostig, E. (1991). A note on stochastic scheduling on a single machine subject to breakdown - the preemptive repeat model. Probability in the Engineering and Informational Sciences 5: 349-354.
-
(1991)
Probability in the Engineering and Informational Sciences
, vol.5
, pp. 349-354
-
-
Frostig, E.1
-
6
-
-
0021444223
-
Scheduling stochastic jobs on a single machine subject to breakdowns
-
Glazebrook, K.D. (1984). Scheduling stochastic jobs on a single machine subject to breakdowns. Naval Research Logistics Quarterly 31: 251-264.
-
(1984)
Naval Research Logistics Quarterly
, vol.31
, pp. 251-264
-
-
Glazebrook, K.D.1
-
7
-
-
0023367406
-
Evaluating the effects of machine breakdowns in scheduling stochastic problems
-
Glazebrook, K.D. (1987). Evaluating the effects of machine breakdowns in scheduling stochastic problems. Naval Research Logistics 34: 319-335.
-
(1987)
Naval Research Logistics
, vol.34
, pp. 319-335
-
-
Glazebrook, K.D.1
-
8
-
-
0001002199
-
Stochastic single machine scheduling with quadratic early-tardy penalties
-
Mittenthal, J. & Raghavachari, M. (1993). Stochastic single machine scheduling with quadratic early-tardy penalties. Operations Research 41: 786-796.
-
(1993)
Operations Research
, vol.41
, pp. 786-796
-
-
Mittenthal, J.1
Raghavachari, M.2
-
11
-
-
0031214284
-
General stochastic single-machine scheduling with regular cost functions
-
Zhou, X. & Cai, X. (1997). General stochastic single-machine scheduling with regular cost functions. Mathematical and Computer Modelling 26; 95-108.
-
(1997)
Mathematical and Computer Modelling
, vol.26
, pp. 95-108
-
-
Zhou, X.1
Cai, X.2
|