2
-
-
0020699921
-
A heuristic algorithm for the m-machine, n-job flow shop sequencing problem
-
Nawaz, M., Jr. E.E. Enscore and I. Ham, "A heuristic algorithm for the m-machine, n-job flow shop sequencing problem, OMEGA, 11, 91-95, 1995.
-
(1995)
OMEGA
, vol.11
, pp. 91-95
-
-
Nawaz Jr., M.1
Enscore, E.E.2
Ham, I.3
-
3
-
-
0027146758
-
Addressing the gap in scheduling research: A review of optimization and heuristic methods in production scheduling
-
MacCarthy, B.L. and J. Liu, "Addressing the gap in scheduling research: a review of optimization and heuristic methods in production scheduling", Int. J. of Production Research, 31, 59-79, 1993.
-
(1993)
Int. J. of Production Research
, vol.31
, pp. 59-79
-
-
MacCarthy, B.L.1
Liu, J.2
-
4
-
-
0026156181
-
A new heuristic for the n-jobs, m-machine flow shop problem
-
Ho, J.C. and Y.-L. Chang, "A new heuristic for the n-jobs, m-machine flow shop problem", European Journal of Operational Research, 52, 194-202, 1991.
-
(1991)
European Journal of Operational Research
, vol.52
, pp. 194-202
-
-
Ho, J.C.1
Chang, Y.-L.2
-
5
-
-
0024700013
-
An new heuristic method for the flow shop sequencing problem
-
Widmer and A.Hertz, "An new heuristic method for the flow shop sequencing problem", European Journal of Operational Research, 41, 186-193, 1989.
-
(1989)
European Journal of Operational Research
, vol.41
, pp. 186-193
-
-
Widmer1
Hertz, A.2
-
7
-
-
0026925262
-
An eficient heuristic approach to the scheduling of jobs in a flow shop
-
Rajendran, C and D. Chaudhuri, "An eficient heuristic approach to the scheduling of jobs in a flow shop", European Journal of Operational Research, 61, 318-325, 1992.
-
(1992)
European Journal of Operational Research
, vol.61
, pp. 318-325
-
-
Rajendran, C.1
Chaudhuri, D.2
-
8
-
-
11244300486
-
Ant-colony algorithms for permutation flow shop scheduling to minimize makespan/total flow time of jobs
-
In press
-
Rajendran, C and H. Zeigler, "Ant-colony algorithms for permutation flow shop scheduling to minimize makespan/total flow time of jobs", European Journal of Operational Research, 2003, (In press).
-
(2003)
European Journal of Operational Research
-
-
Rajendran, C.1
Zeigler, H.2
-
9
-
-
0035314562
-
Multicriteria scheduling problems: A survey
-
T'kindt, V. and J. - C. Billaut, "Multicriteria scheduling problems: A survey", RAIRO Operations Research, 35, 143-163, 2001.
-
(2001)
RAIRO Operations Research
, vol.35
, pp. 143-163
-
-
T'kindt, V.1
Billaut, J.-C.2
-
10
-
-
0029635352
-
Heuristics for scheduling in flow shop with multiple objectives
-
Rajendran, C, "Heuristics for scheduling in flow shop with multiple objectives", European Journal of Operational Research, 82, 540-555, 1995.
-
(1995)
European Journal of Operational Research
, vol.82
, pp. 540-555
-
-
Rajendran, C.1
-
11
-
-
0030192321
-
Scheduling in flow shop and cellular manufacturing systems with multiple objectives - A genetic algorithmic approach
-
Sridhar, J. and C. Rajendran, "Scheduling in flow shop and cellular manufacturing systems with multiple objectives - A genetic algorithmic approach", Production Planning and Control, 7(4), 374-382, 1996.
-
(1996)
Production Planning and Control
, vol.7
, Issue.4
, pp. 374-382
-
-
Sridhar, J.1
Rajendran, C.2
-
12
-
-
0000599395
-
Multiobjecive optimization with vector evaluated genetic algorithms
-
July
-
Schaffer, J.D, "Multiobjecive optimization with vector evaluated genetic algorithms", Proc. of the first ICGA, 93-100, July 1985.
-
(1985)
Proc. of the First ICGA
, pp. 93-100
-
-
Schaffer, J.D.1
-
13
-
-
0000852513
-
Multiobjective function optimisation using nondominated sorting genetic algorithms
-
Srinivas, N., and K. Deb. "Multiobjective function optimisation using nondominated sorting genetic algorithms", IEEE Journal on Evolutionary Computation, 2(3), 221-248, 1995.
-
(1995)
IEEE Journal on Evolutionary Computation
, vol.2
, Issue.3
, pp. 221-248
-
-
Srinivas, N.1
Deb, K.2
-
14
-
-
0001953837
-
Genetic algorithms for multiobjective optimization: Formulation, discussion and generalization
-
July
-
Fonseca, C.M., and P.J. Fleming, "Genetic algorithms for multiobjective optimization: Formulation, discussion and generalization", Proceedings of the Fifth International Conference on Genetic Algorithms, 416-423, July 1993.
-
(1993)
Proceedings of the Fifth International Conference on Genetic Algorithms
, pp. 416-423
-
-
Fonseca, C.M.1
Fleming, P.J.2
-
15
-
-
0037063773
-
The development of gradual priority weighting approach for the multi-objective flow shop scheduling problem
-
Chang, P. C., J.C. Hsieh and S.G. Lin, "The development of gradual priority weighting approach for the multi-objective flow shop scheduling problem", International Journal on Production Economics, 79, 171-183, 2002.
-
(2002)
International Journal on Production Economics
, vol.79
, pp. 171-183
-
-
Chang, P.C.1
Hsieh, J.C.2
Lin, S.G.3
-
16
-
-
0036530772
-
Fast and elitist multiobjective genetic algorithm: NSGA II
-
Deb, K., Amrit Pratap, Sameer Agarwal, and T. Meyarivan. "Fast and elitist multiobjective genetic algorithm: NSGA II ", IEEE Journal on Evolutionary Computation, 6(2), 182-197, 2002.
-
(2002)
IEEE Journal on Evolutionary Computation
, vol.6
, Issue.2
, pp. 182-197
-
-
Deb, K.1
Pratap, A.2
Agarwal, S.3
Meyarivan, T.4
-
18
-
-
0032141635
-
A multi-objective genetic local search algorithm and its application to flow shop scheduling
-
Ishibuchi H., and T. Murata, "A multi-objective genetic local search algorithm and its application to flow shop scheduling", IEEE Tansactions on Systems, Man and Cybernetics-Part C: Appliationa nd Reviews, 28, 392-403, 1998.
-
(1998)
IEEE Tansactions on Systems, Man and Cybernetics-part C: Appliationa Nd Reviews
, vol.28
, pp. 392-403
-
-
Ishibuchi, H.1
Murata, T.2
-
19
-
-
0038273913
-
Balance between genetic search and local search in mementic algorithms for multiobjective permutation flowshop scheduling
-
Ishibuchi, H., T. Yoshida, and T. Murata. "Balance between genetic search and local search in mementic algorithms for multiobjective permutation flowshop scheduling", IEEE transactions on Evolutionary Compulation, 7(2), 204-223, 2003.
-
(2003)
IEEE Transactions on Evolutionary Compulation
, vol.7
, Issue.2
, pp. 204-223
-
-
Ishibuchi, H.1
Yoshida, T.2
Murata, T.3
-
22
-
-
0016952078
-
The complexity of flow shop and job shop scheduling
-
Garey, M. R., D.S. Johnson and R. Sethi, "The complexity of flow shop and job shop scheduling", Mathematics of Operations Research", 1, 117-129, 1976.
-
(1976)
Mathematics of Operations Research
, vol.1
, pp. 117-129
-
-
Garey, M.R.1
Johnson, D.S.2
Sethi, R.3
-
23
-
-
0000978859
-
Complexity of multiple machine multicriteria scheduling problems
-
Atlanta
-
Chen, P., and R. Bulfin. "Complexity of multiple machine multicriteria scheduling problems", Proceedings of the third IERC, Atlanta, 1994.
-
(1994)
Proceedings of the Third IERC
-
-
Chen, P.1
Bulfin, R.2
-
24
-
-
26444479778
-
Optimization by simulated annealing
-
Kirkpatrick, S., C.D. Gelatt Jr, and M.P. Vecchi. "Optimization by simulated annealing", Science, 220(4598), 671 - 680, 1983.
-
(1983)
Science
, vol.220
, Issue.4598
, pp. 671-680
-
-
Kirkpatrick, S.1
Gelatt Jr., C.D.2
Vecchi, M.P.3
|