-
2
-
-
4344682502
-
-
Hu X, Shi Y, Eberhart RC. Recent advances in particle swarm. In: Proceedings of the IEEE congress on evolutionary computation, vol. 1. Oregon: Portland; 2004. p. 90-7.
-
-
-
-
3
-
-
0002345372
-
Cooperative learning in neural network using particle swarm optimizers
-
Van den Bergh F., and Engelbrecht A.P. Cooperative learning in neural network using particle swarm optimizers. South African Computer Journal 26 (2000) 84-90
-
(2000)
South African Computer Journal
, vol.26
, pp. 84-90
-
-
Van den Bergh, F.1
Engelbrecht, A.P.2
-
5
-
-
4344713798
-
-
Tasgetiren MF, Sevkli M, Liang YC, Gencyilmaz G. Particle swarm optimization algorithm for single machine total weighted tardiness problem. In: Proceedings of the IEEE congress on evolutionary computation, vol. 2, Oregon: Portland; 2004. p. 1412-9.
-
-
-
-
6
-
-
33847673884
-
-
Tasgetiren MF, Liang YC, Sevkli M, Gencyilmaz G. Particle swarm optimization algorithm for makespan and maximum lateness minimization in permutation flowshop sequencing problem. In: Proceedings of the fourth international symposium on intelligent manufacturing systems, Turkey: Sakarya; 2004. p. 431-41.
-
-
-
-
11
-
-
0003438602
-
-
Prentice-Hall, Englewood Cliffs, NJ
-
Pinedo M. Scheduling: theory, algorithm, and system. 2nd ed. (2002), Prentice-Hall, Englewood Cliffs, NJ
-
(2002)
Scheduling: theory, algorithm, and system. 2nd ed.
-
-
Pinedo, M.1
-
12
-
-
0030192321
-
Scheduling in flowshop and cellular manufacturing systems with multiple objectives-a genetic algorithmic approach
-
Sridhar J., and Rajendran C. Scheduling in flowshop and cellular manufacturing systems with multiple objectives-a genetic algorithmic approach. Production Planning and Control 7 (1996) 374-382
-
(1996)
Production Planning and Control
, vol.7
, pp. 374-382
-
-
Sridhar, J.1
Rajendran, C.2
-
13
-
-
1642559633
-
Ant-colony algorithms for permutation flowshop scheduling to minimize makespan/total flowtime of jobs
-
Rajendran C., and Ziegler H. Ant-colony algorithms for permutation flowshop scheduling to minimize makespan/total flowtime of jobs. European Journal of Operational Research 155 (2004) 426-438
-
(2004)
European Journal of Operational Research
, vol.155
, pp. 426-438
-
-
Rajendran, C.1
Ziegler, H.2
-
14
-
-
0004222346
-
-
Morgan Kaufmann, San Francisco, CA
-
Kennedy J., Eberhart R.C., and Shi Y. Swarm intelligence (2001), Morgan Kaufmann, San Francisco, CA
-
(2001)
Swarm intelligence
-
-
Kennedy, J.1
Eberhart, R.C.2
Shi, Y.3
-
18
-
-
84947905083
-
-
Den Besten M, Stützle T, Dorigo M. Ant colony optimization for the total weighted tardiness problem. In: Proceeding PPSN VI, sixth international conference parallel problem solving from nature. Berlin: Springer; 2000. p. 611-20.
-
-
-
-
19
-
-
0014807274
-
A heuristic algorithm for the n job, m machine sequencing problem
-
Campbell H.G., Dudek R.A., and Smith M.L. A heuristic algorithm for the n job, m machine sequencing problem. Management Science 16 (1970) 630-637
-
(1970)
Management Science
, vol.16
, pp. 630-637
-
-
Campbell, H.G.1
Dudek, R.A.2
Smith, M.L.3
-
20
-
-
0017516618
-
An evaluation of flow shop sequencing heuristics
-
Dannenbring D. An evaluation of flow shop sequencing heuristics. Management Science 23 (1977) 1174-1182
-
(1977)
Management Science
, vol.23
, pp. 1174-1182
-
-
Dannenbring, D.1
-
21
-
-
0020699921
-
A heuristic algorithm for the m-machine, n-job flowshop sequencing problem
-
Nawaz M., Enscore E.E., and Ham I. A heuristic algorithm for the m-machine, n-job flowshop sequencing problem. OMEGA 11 (1983) 91-95
-
(1983)
OMEGA
, vol.11
, pp. 91-95
-
-
Nawaz, M.1
Enscore, E.E.2
Ham, I.3
-
22
-
-
0026925262
-
An efficient heuristic approach to the scheduling of jobs in a flowshop
-
Rajendran C., and Chaudhuri D. An efficient heuristic approach to the scheduling of jobs in a flowshop. European Journal of Operational Research 61 (1992) 318-325
-
(1992)
European Journal of Operational Research
, vol.61
, pp. 318-325
-
-
Rajendran, C.1
Chaudhuri, D.2
-
23
-
-
0037120618
-
Efficient heuristics for flowshop sequencing with the objectives of makespan and flowtime minimisation
-
Framinan J.M., Leisten R., and Ruiz-Usano R. Efficient heuristics for flowshop sequencing with the objectives of makespan and flowtime minimisation. European Journal of Operational Research 141 (2002) 559-569
-
(2002)
European Journal of Operational Research
, vol.141
, pp. 559-569
-
-
Framinan, J.M.1
Leisten, R.2
Ruiz-Usano, R.3
|