메뉴 건너뛰기




Volumn 42, Issue 9-10, 2009, Pages 955-962

Solving a multi-objective overlapping flow-shop scheduling

Author keywords

Ant colony optimization; Flow shop; Overlap manufacturing; Setup time

Indexed keywords

ANT COLONY OPTIMIZATION; EFFECTIVE MECHANISMS; FLOW SHOP; FLOW-SHOP SCHEDULING; MAKESPAN; MANUFACTURING COST; MANUFACTURING FLOW; MANUFACTURING SCHEDULING; MULTI OBJECTIVE; OVERLAP MANUFACTURING; OVERLAPPING PRODUCTION; REAL-LIFE APPLICATIONS; SCHEDULING MECHANISM; SCHEDULING PROBLEM; SETUP TIME; VARYING PARAMETERS; WORK-IN-PROCESS INVENTORY;

EID: 67349089317     PISSN: 02683768     EISSN: 14333015     Source Type: Journal    
DOI: 10.1007/s00170-008-1652-9     Document Type: Article
Times cited : (18)

References (17)
  • 1
    • 0030500179 scopus 로고    scopus 로고
    • Lot splitting in stochastic flow shop and job shop environments
    • TL Sumunt AH Buss DH Kropp 1996 Lot splitting in stochastic flow shop and job shop environments Decis Sci 27 215 237 (Pubitemid 126311587)
    • (1996) Decision Sciences , vol.27 , Issue.2 , pp. 215-237
    • Smunt, T.L.1    Buss, A.H.2    Kropp, D.H.3
  • 2
    • 0034691446 scopus 로고    scopus 로고
    • Lot streaming in multistage production system
    • doi:10.1016/S0925-5273(99)00124-3
    • RV Ramasesh F Haizhen KHF Duncan CH Jack 2000 Lot streaming in multistage production system Int J Prod Econ 66 199 211 doi:10.1016/S0925-5273(99)00124-3
    • (2000) Int J Prod Econ , vol.66 , pp. 199-211
    • Ramasesh, R.V.1    Haizhen, F.2    Duncan, K.H.F.3    Jack, C.H.4
  • 3
    • 84985818856 scopus 로고
    • Solution procedures for the lot-streaming problem
    • doi:10.1111/j.1540-5915.1990.tb00328.x
    • KR Baker DF Pyke 1990 Solution procedures for the lot-streaming problem Decis Sci 21 475 491 doi:10.1111/j.1540-5915.1990.tb00328.x
    • (1990) Decis Sci , vol.21 , pp. 475-491
    • Baker, K.R.1    Pyke, D.F.2
  • 4
    • 84974861854 scopus 로고
    • Integrating scheduling with bathing and lot-sizing: A review of algorithms and complexity
    • CN Potts LN Van-Wassenhove 1992 Integrating scheduling with bathing and lot-sizing: a review of algorithms and complexity J Oper Res Soc 43 395 406
    • (1992) J Oper Res Soc , vol.43 , pp. 395-406
    • Potts, C.N.1    Van-Wassenhove, L.N.2
  • 5
    • 0000611941 scopus 로고
    • Basic techniques for lot streaming
    • D Trietsch KR Baker 1993 Basic techniques for lot streaming Oper Res 41 1065 1076
    • (1993) Oper Res , vol.41 , pp. 1065-1076
    • Trietsch, D.1    Baker, K.R.2
  • 6
    • 52649092892 scopus 로고    scopus 로고
    • Enhanced performance of overlap flow-shop scheduling involving reworking and a time buffer
    • in press. doi: 10.1007/s00170-007-1192-8
    • Lee SC, Hsu TS, Chuang SP, Yang CL (2008) Enhanced performance of overlap flow-shop scheduling involving reworking and a time buffer. Int J Adv Manuf Technol (in press). doi: 10.1007/s00170-007-1192-8
    • (2008) Int J Adv Manuf Technol
    • Lee, S.C.1    Hsu, T.S.2    Chuang, S.P.3    Yang, C.L.4
  • 7
    • 38249040429 scopus 로고
    • Overlapping operations in material requirements planning
    • doi:10.1016/0272-6963(86)90004-5
    • SC Graves MM Kostreva 1986 Overlapping operations in material requirements planning J Oper Manag 6 283 294 doi:10.1016/0272-6963(86)90004-5
    • (1986) J Oper Manag , vol.6 , pp. 283-294
    • Graves, S.C.1    Kostreva, M.M.2
  • 8
    • 0022516278 scopus 로고
    • Optimal and heuristic procedures for component lot-splitting in multi-stage manufacturing system
    • JP Moily 1986 Optimal and heuristic procedures for component lot-splitting in multi-stage manufacturing system Manage Sci 32 113 125
    • (1986) Manage Sci , vol.32 , pp. 113-125
    • Moily, J.P.1
  • 9
    • 0026932105 scopus 로고
    • Optimal cycle time in multistage serial system with set-up and inventory costs
    • IA Karimi 1992 Optimal cycle time in multistage serial system with set-up and inventory costs Manage Sci 38 1467 1481
    • (1992) Manage Sci , vol.38 , pp. 1467-1481
    • Karimi, I.A.1
  • 10
    • 0003401932 scopus 로고
    • PhD thesis, Dipartmento di Elettronica, Politecnico di Milano, Italy (in Italian)
    • Dorigo M (1992) Optimization, learning and natural algorithms. PhD thesis, Dipartmento di Elettronica, Politecnico di Milano, Italy (in Italian)
    • (1992) Optimization, Learning and Natural Algorithms
    • Dorigo, M.1
  • 11
    • 0033084695 scopus 로고
    • Ant algorithms for discrete optimization
    • doi:10.1162/106454699568728
    • M Dorigo G Di-Caro LM Gambardella 1995 Ant algorithms for discrete optimization Artif Life 5 137 172 doi:10.1162/106454699568728
    • (1995) Artif Life , vol.5 , pp. 137-172
    • Dorigo, M.1    Di-Caro, G.2    Gambardella, L.M.3
  • 12
    • 0942269532 scopus 로고    scopus 로고
    • An ant colony system for permutation flow-shop sequencing
    • doi:10.1016/S0305-0548(03)00038-8
    • KC Ying CJ Liao 2004 An ant colony system for permutation flow-shop sequencing Comput Oper Res 31 791 801 doi:10.1016/S0305-0548(03)00038-8
    • (2004) Comput Oper Res , vol.31 , pp. 791-801
    • Ying, K.C.1    Liao, C.J.2
  • 13
    • 33845735022 scopus 로고    scopus 로고
    • Industrial applications of the ant colony optimization algorithm
    • doi:10.1007/s00170-005-0254-z
    • B Fox W Xiang HP Lee 2007 Industrial applications of the ant colony optimization algorithm Int J Adv Manuf Technol 31 805 814 doi:10.1007/s00170- 005-0254-z
    • (2007) Int J Adv Manuf Technol , vol.31 , pp. 805-814
    • Fox, B.1    Xiang, W.2    Lee, H.P.3
  • 14
    • 36048943650 scopus 로고    scopus 로고
    • Using ant colony optimization to solve hybrid flow shop scheduling problems
    • doi:10.1007/s00170-007-1048-2
    • K Alaykyran O Engin A Doyen 2007 Using ant colony optimization to solve hybrid flow shop scheduling problems Int J Adv Manuf Technol 35 541 550 doi:10.1007/s00170-007-1048-2
    • (2007) Int J Adv Manuf Technol , vol.35 , pp. 541-550
    • Alaykyran, K.1    Engin, O.2    Doyen, A.3
  • 15
    • 43449136218 scopus 로고    scopus 로고
    • Two-sided assembly line balancing using an ant-colony-based heuristic
    • doi:10.1007/s00170-006-0861-3
    • A Baykasoglu T Dereli 2008 Two-sided assembly line balancing using an ant-colony-based heuristic Int J Adv Manuf Technol 36 582 588 doi:10.1007/s00170-006-0861-3
    • (2008) Int J Adv Manuf Technol , vol.36 , pp. 582-588
    • Baykasoglu, A.1    Dereli, T.2
  • 16
    • 52649172737 scopus 로고    scopus 로고
    • Ant colony system for job shop scheduling with time windows
    • in press. doi: 10.1007/s00170-007-1203-9
    • Huang RH, Yang CL (2008) Ant colony system for job shop scheduling with time windows. Int J Adv Manuf Technol (in press). doi: 10.1007/s00170-007-1203-9
    • (2008) Int J Adv Manuf Technol
    • Huang, R.H.1    Yang, C.L.2
  • 17
    • 0027627715 scopus 로고
    • Single-machine scheduling for minimizing total cost with identical, asymmetrical earliness and tardiness penalties
    • WX Zheng H Nagasawa N Nishiyama 1993 single-machine scheduling for minimizing total cost with identical, asymmetrical earliness and tardiness penalties Int J Prod Res 31 1611 1620 doi:10.1080/00207549308956812 (Pubitemid 23663680)
    • (1993) International Journal of Production Research , vol.31 , Issue.7 , pp. 1611-1620
    • Zheng, W.-X.1    Nagasawa, H.2    Nishiyama, N.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.