메뉴 건너뛰기




Volumn 50, Issue 5-8, 2010, Pages 699-715

A flexible artificial neural network-fuzzy simulation algorithm for scheduling a flow shop with multiple processors

Author keywords

Artificial neural network; Fuzzy simulation; Metamodeling Flow shop scheduling; Multiattribute combinatorial dispatching; Optimization

Indexed keywords

ARTIFICIAL NEURAL NETWORK; ARTIFICIAL NEURAL NETWORKS; COMMONLY USED; COMPLEX OPTIMIZATION; CONVENTIONAL SIMULATION MODELS; DECISION PROBLEMS; DISPATCHING RULES; FLOW SHOP WITH MULTIPLE PROCESSORS; FLOW SHOPS WITH MULTIPLE PROCESSORS; FUZZY SIMULATION; INPUT DATAS; LEAD TIME; MANUFACTURING PLANT; MANUFACTURING SYSTEM; META HEURISTICS; META MODEL; METAMODELING; MULTI-ATTRIBUTES; MULTI-LAYER CERAMIC CAPACITOR; MULTILAYERED NEURAL NETWORKS; NON-LINEARITY; SCHEDULING PROBLEM; SOLUTION QUALITY; UNCERTAIN INPUT DATA;

EID: 78650297118     PISSN: 02683768     EISSN: 14333015     Source Type: Journal    
DOI: 10.1007/s00170-010-2533-6     Document Type: Article
Times cited : (24)

References (44)
  • 1
    • 36048943650 scopus 로고    scopus 로고
    • Using ant colony optimization to solve hybrid flow shop scheduling problems
    • Alaykýran K, Engin O, Döyen A (2007) Using ant colony optimization to solve hybrid flow shop scheduling problems. Int J Adv Manuf Technol 35(5-6):541-550
    • (2007) Int J Adv Manuf Technol , vol.35 , Issue.5-6 , pp. 541-550
    • Alaykýran, K.1    Engin, O.2    Döyen, A.3
  • 2
    • 10444260511 scopus 로고    scopus 로고
    • Integrating simulation and optimization to schedule a hybrid flow shop with maintenance constraints
    • Allaoui H, Artiba A (2004) Integrating simulation and optimization to schedule a hybrid flow shop with maintenance constraints. Comput Ind Eng 47(4):431-450
    • (2004) Comput Ind Eng , vol.47 , Issue.4 , pp. 431-450
    • Allaoui, H.1    Artiba, A.2
  • 3
    • 15344340038 scopus 로고    scopus 로고
    • Using computer simulation in a heavy electromotors assembly line unit
    • Azadeh MA, Karimizad K, Shakeri SH (2000) Using computer simulation in a heavy electromotors assembly line unit. J Faculty Engineering 34(2):127-139
    • (2000) J Faculty Engineering , vol.34 , Issue.2 , pp. 127-139
    • Azadeh, M.A.1    Karimizad, K.2    Shakeri, S.H.3
  • 4
    • 28044435648 scopus 로고    scopus 로고
    • Design of practical optimum jit systems by integration of computer simulation and analysis of variance
    • Azadeh MA, Bidokhti B, Sakkaki SMR (2005) Design of practical optimum JIT systems by integration of computer simulation and analysis of variance. Comput Ind Eng 49(4):504-519
    • (2005) Comput Ind Eng , vol.49 , Issue.4 , pp. 504-519
    • Azadeh, M.A.1    Bidokhti, B.2    Smr, S.3
  • 5
    • 61649097058 scopus 로고    scopus 로고
    • Hybrid simulated annealing in flow shop scheduling: A diversification and intensification approach
    • Azizi N, Liang M, Zolfaghari S (2009) Hybrid simulated annealing in flow shop scheduling: a diversification and intensification approach. Int J Ind Systems Eng 4(3):326-348
    • (2009) Int J Ind Systems Eng , vol.4 , Issue.3 , pp. 326-348
    • Azizi, N.1    Liang, M.2    Zolfaghari, S.3
  • 6
    • 0031256963 scopus 로고    scopus 로고
    • Simple priority rule combinations: An approach to improve both flow time and tardiness
    • Barman S (1997) Simple priority rule combinations: an approach to improve both flow time and tardiness. Int J Prod Res 35 (10):2857-2870
    • (1997) Int J Prod Res , vol.35 , Issue.10 , pp. 2857-2870
    • Barman, S.1
  • 7
    • 0033906893 scopus 로고    scopus 로고
    • Hybrid flow shop scheduling with precedence constrains and time lags to minimize maximum lateness
    • Botta-Genoulaz V (2000) Hybrid flow shop scheduling with precedence constrains and time lags to minimize maximum lateness. Int J Prod Econ 64(1-3):101-111
    • (2000) Int J Prod Econ , vol.64 , Issue.1-3 , pp. 101-111
    • Botta-Genoulaz, V.1
  • 8
    • 0033078202 scopus 로고    scopus 로고
    • Heuristics for scheduling in a flow shop with multiple processors
    • Brah SA, Loo LL (1999) Heuristics for scheduling in a flow shop with multiple processors. Eur J Oper Res 113(1):113-122
    • (1999) Eur J Oper Res , vol.113 , Issue.1 , pp. 113-122
    • Brah, S.A.1    Loo, L.L.2
  • 9
    • 0030217535 scopus 로고    scopus 로고
    • Ranking dispatching rules by data envelopment analysis in a job shop environment
    • Chang YL, Sueyoshi T, Sullivan RS (1996) Ranking dispatching rules by data envelopment analysis in a job shop environment. IIE Trans 28(8):631-642
    • (1996) IIE Trans , vol.28 , Issue.8 , pp. 631-642
    • Chang, Y.L.1    Sueyoshi, T.2    Sullivan, R.S.3
  • 10
    • 70350537138 scopus 로고    scopus 로고
    • A nonlinear scheduling rule incorporating fuzzy-neural remaining cycle time estimator for scheduling a semiconductor manufacturing factory-a simulation study
    • Chen T, Wang YC (2009) A nonlinear scheduling rule incorporating fuzzy-neural remaining cycle time estimator for scheduling a semiconductor manufacturing factory-a simulation study. Int J Adv Manuf Technol 45(1-2):110-121
    • (2009) Int J Adv Manuf Technol , vol.45 , Issue.1-2 , pp. 110-121
    • Chen, T.1    Wang, Y.C.2
  • 11
    • 4043129481 scopus 로고    scopus 로고
    • Fuzzy multi-criteria selection of object-oriented simulation software for production system analysis
    • Cochran JK, Chen HN (2005) Fuzzy multi-criteria selection of object-oriented simulation software for production system analysis. Comput Oper Res 32(1):153-168
    • (2005) Comput Oper Res , vol.32 , Issue.1 , pp. 153-168
    • Cochran, J.K.1    Chen, H.N.2
  • 12
    • 69649083513 scopus 로고    scopus 로고
    • Solving multi-objective sdst flexible flow shop using grasp algorithm
    • Davoudpour H, Ashrafi M (2009) Solving multi-objective SDST flexible flow shop using GRASP algorithm. Int J Adv Manuf Technol 44(7-8):737-747
    • (2009) Int J Adv Manuf Technol , vol.44 , Issue.7-8 , pp. 737-747
    • Davoudpour, H.1    Ashrafi, M.2
  • 14
    • 68149100772 scopus 로고    scopus 로고
    • A heuristic for priority-based scheduling in a turbine manufacturing job-shop
    • Dulluri S, Mahesh V, Rao CSP (2008) A heuristic for priority-based scheduling in a turbine manufacturing job-shop. Int J Ind Systems Eng 3(6):625-643
    • (2008) Int J Ind Systems Eng , vol.3 , Issue.6 , pp. 625-643
    • Dulluri, S.1    Mahesh, V.2    Csp, R.3
  • 15
    • 0042830730 scopus 로고    scopus 로고
    • Simulation meta-modeling through artificial neural networks
    • Fonseca DJ, Navaresse DO, Moynihan GP (2003) Simulation meta-modeling through artificial neural networks. Eng Appl Artif Intell 16(3):177-183
    • (2003) Eng Appl Artif Intell , vol.16 , Issue.3 , pp. 177-183
    • Fonseca, D.J.1    Navaresse, D.O.2    Moynihan, G.P.3
  • 16
    • 0032599551 scopus 로고    scopus 로고
    • Generic simulation model for hybrid flow shop
    • Grangeon N, Tanguy A, Chernev N (1999) Generic simulation model for hybrid flow shop. Comput Ind Eng 137(1-2):207-210
    • (1999) Comput Ind Eng , vol.137 , Issue.1-2 , pp. 207-210
    • Grangeon, N.1    Tanguy, A.2    Chernev, N.3
  • 17
  • 18
    • 70349294190 scopus 로고    scopus 로고
    • No-wait two-stage multiprocessor flow shop scheduling with unit setup
    • Huang RH, Yang CL, Huang YC (2008) No-wait two-stage multiprocessor flow shop scheduling with unit setup. Int J Adv Manuf Technol 44(9-10):921-927
    • (2008) Int J Adv Manuf Technol , vol.44 , Issue.9-10 , pp. 921-927
    • Huang, R.H.1    Yang, C.L.2    Huang, Y.C.3
  • 19
    • 0034286617 scopus 로고    scopus 로고
    • A comparative analysis of different approaches to scheduling in flexible flow shops
    • Jayamohan MS, Rajendran C (2000) A comparative analysis of different approaches to scheduling in flexible flow shops. Prod Plan Control 11(6):572-580
    • (2000) Prod Plan Control , vol.11 , Issue.6 , pp. 572-580
    • Jayamohan, M.S.1    Rajendran, C.2
  • 20
    • 0031073978 scopus 로고    scopus 로고
    • A fuzzy integrated decision-making support system for scheduling of fms using simulation
    • Kazerooni A, Chan FTS, Abhary K (1997) A fuzzy integrated decision-making support system for scheduling of FMS using simulation. Comput-Integr Manuf Syst 10(1):27-34
    • (1997) Comput-integr Manuf Syst , vol.10 , Issue.1 , pp. 27-34
    • Kazerooni, A.1    Fts, C.2    Abhary, K.3
  • 21
    • 34547778459 scopus 로고    scopus 로고
    • Simulation meta-model development using uniform design and neural networks for automated material handling systems in semiconductor wafer fabrication
    • Kuo Y, Taho Y, Peters BA, Chang I (2007) Simulation meta-model development using uniform design and neural networks for automated material handling systems in semiconductor wafer fabrication. Simul Modeling Pract Theory 15(8):1002-1015
    • (2007) Simul Modeling Pract Theory , vol.15 , Issue.8 , pp. 1002-1015
    • Kuo, Y.1    Taho, Y.2    Peters, B.A.3    Chang, I.4
  • 22
    • 42049114830 scopus 로고    scopus 로고
    • Using simulation and multi-criteria methods to provide robust solutions to dispatching problems in a flow shop with multiple processors
    • Kuo Y, Yang T, Cho C, Tseng YC (2008) Using simulation and multi-criteria methods to provide robust solutions to dispatching problems in a flow shop with multiple processors. Math Comput Simul 78(1):40-56
    • (2008) Math Comput Simul , vol.78 , Issue.1 , pp. 40-56
    • Kuo, Y.1    Yang, T.2    Cho, C.3    Tseng, Y.C.4
  • 23
    • 33846194668 scopus 로고    scopus 로고
    • An effective hybrid particle swarm optimization for no-wait flow shop scheduling
    • Liu B, Wang L, Jin YH (2006) An effective hybrid particle swarm optimization for no-wait flow shop scheduling. Int J Adv Manuf Technol 31(9-10):1001-1011
    • (2006) Int J Adv Manuf Technol , vol.31 , Issue.9-10 , pp. 1001-1011
    • Liu, B.1    Wang, L.2    Jin, Y.H.3
  • 24
    • 38749118677 scopus 로고    scopus 로고
    • An effective hybrid pso-based algorithm for flow shop scheduling with limited buffers
    • Liu B, Wang L, Jin YH (2008) An effective hybrid PSO-based algorithm for flow shop scheduling with limited buffers. Comput Oper Res 35(9):2791-2806
    • (2008) Comput Oper Res , vol.35 , Issue.9 , pp. 2791-2806
    • Liu, B.1    Wang, L.2    Jin, Y.H.3
  • 25
    • 76549113337 scopus 로고    scopus 로고
    • Training a neural network to select dispatching rules in real time
    • doi:10.1016/j.cie.2009.03.008
    • Mouelhi-Chibani W, Pierreval H (2009) Training a neural network to select dispatching rules in real time. Comput Ind Eng. doi:10.1016/j.cie.2009.03.008
    • (2009) Comput Ind Eng.
    • Mouelhi-Chibani, W.1    Pierreval, H.2
  • 27
    • 34047222441 scopus 로고    scopus 로고
    • The three-machine flow shop scheduling problem to minimize maximum lateness with separate setup times
    • Ng CT, Allahverdi A, Al-Anzi FS, Cheng TCE (2007) The three-machine flow shop scheduling problem to minimize maximum lateness with separate setup times. Int J Oper Research 2(2):135-155
    • (2007) Int J Oper Research , vol.2 , Issue.2 , pp. 135-155
    • Ng, C.T.1    Allahverdi, A.2    Al-Anzi, F.S.3    Cheng, T.C.E.4
  • 28
    • 33750007920 scopus 로고    scopus 로고
    • A bicriterian flow shop scheduling using artificial neural network
    • Noorul Haq A, Ramanan TR (2005) A bicriterian flow shop scheduling using artificial neural network. Int J Adv Manuf Technol 30(11-12):1132-1138
    • (2005) Int J Adv Manuf Technol , vol.30 , Issue.11-12 , pp. 1132-1138
    • Noorul Haq, A.1    Ramanan, T.R.2
  • 29
    • 67349127659 scopus 로고    scopus 로고
    • Hybrid fuzzy set-based polynomial neural networks and their development with the aid of genetic optimization and information granulation
    • Oh SK, Pedrycz W, Roh SB (2009) Hybrid fuzzy set-based polynomial neural networks and their development with the aid of genetic optimization and information granulation. Appl Soft Computing 9(3):1068-1089
    • (2009) Appl Soft Computing , vol.9 , Issue.3 , pp. 1068-1089
    • Oh, S.K.1    Pedrycz, W.2    Roh, S.B.3
  • 30
    • 33749176597 scopus 로고    scopus 로고
    • Simulation of fuzzy multiattribute models for grey relationships
    • Olson DL, Wu D (2006) Simulation of fuzzy multiattribute models for grey relationships. Eur J Oper Res 175(1):111-120
    • (2006) Eur J Oper Res , vol.175 , Issue.1 , pp. 111-120
    • Olson, D.L.1    Wu, D.2
  • 31
    • 0036497435 scopus 로고    scopus 로고
    • A fuzzy logic based methodology to rank shop floor dispatch rules
    • Petroni A, Rizzi A (2002) A fuzzy logic based methodology to rank shop floor dispatch rules. Int J Prod Econ 76(1):99-108
    • (2002) Int J Prod Econ , vol.76 , Issue.1 , pp. 99-108
    • Petroni, A.1    Rizzi, A.2
  • 34
    • 39149138667 scopus 로고    scopus 로고
    • Simulation of discrete linear time-invariant fuzzy dynamic systems
    • Puig V, Saludes J, Quevedo J (2008) Simulation of discrete linear time-invariant fuzzy dynamic systems. Fuzzy Sets Syst 159 (7):787-803
    • (2008) Fuzzy Sets Syst , vol.159 , Issue.7 , pp. 787-803
    • Puig, V.1    Saludes, J.2    Quevedo, J.3
  • 35
    • 40249109955 scopus 로고    scopus 로고
    • Analysis of heuristics for the uet two-machine flow shop problem with time delays
    • Rayward-Smith VJ, Rebaine D (2008) Analysis of heuristics for the UET two-machine flow shop problem with time delays. Comput Oper Res 35(10):3298-3310
    • (2008) Comput Oper Res , vol.35 , Issue.10 , pp. 3298-3310
    • Rayward-Smith, V.J.1    Rebaine, D.2
  • 36
    • 0030243899 scopus 로고    scopus 로고
    • An evaluation of sequencing heuristics in flow shops with multiple processors
    • Santos DL, Hunsucker JL, Deal DE (1996) An evaluation of sequencing heuristics in flow shops with multiple processors. Comput Ind Eng 30(4):681-692
    • (1996) Comput Ind Eng , vol.30 , Issue.4 , pp. 681-692
    • Santos, D.L.1    Hunsucker, J.L.2    Deal, D.E.3
  • 37
    • 38849162891 scopus 로고    scopus 로고
    • Evolving dispatching rules using genetic programming for solving multi-objective flexible job-shop problems
    • Tay JC, Ho NB (2008) Evolving dispatching rules using genetic programming for solving multi-objective flexible job-shop problems. Comput Ind Eng 54(3):453-473
    • (2008) Comput Ind Eng , vol.54 , Issue.3 , pp. 453-473
    • Tay, J.C.1    Ho, N.B.2
  • 38
    • 0141636340 scopus 로고    scopus 로고
    • A new heuristic for minimal makespan in flow shops with multiple processors and no intermediate storage
    • Thornton HW, Hunsucker JL (2004) A new heuristic for minimal makespan in flow shops with multiple processors and no intermediate storage. Eur J Oper Res 152(1):96-114
    • (2004) Eur J Oper Res , vol.152 , Issue.1 , pp. 96-114
    • Thornton, H.W.1    Hunsucker, J.L.2
  • 39
    • 57349124886 scopus 로고    scopus 로고
    • Scheduling parallel batch processors with incompatible job families to minimize weighted completion time
    • Venkataramana M, Raghavan NRS (2009) Scheduling parallel batch processors with incompatible job families to minimize weighted completion time. Int J Ind Systems Engineering 4(1):76-93
    • (2009) Int J Ind Systems Engineering , vol.4 , Issue.1 , pp. 76-93
    • Venkataramana, M.1    Nrs, R.2
  • 40
    • 0037278745 scopus 로고    scopus 로고
    • An effective hybrid heuristic for flow shop scheduling
    • Wang L, Zheng D (2003) An effective hybrid heuristic for flow shop scheduling. Int J Adv Manuf Technol 21(1):38-44
    • (2003) Int J Adv Manuf Technol , vol.21 , Issue.1 , pp. 38-44
    • Wang, L.1    Zheng, D.2
  • 41
    • 33750013118 scopus 로고    scopus 로고
    • A genetic algorithms simulation approach for the multi-attribute combinatorial dispatching decision problem
    • Yang T, Kuo Y, Cho C (2007) A genetic algorithms simulation approach for the multi-attribute combinatorial dispatching decision problem. Eur J Oper Res 176(3):1859-1873
    • (2007) Eur J Oper Res , vol.176 , Issue.3 , pp. 1859-1873
    • Yang, T.1    Kuo, Y.2    Cho, C.3
  • 42
    • 34248666540 scopus 로고
    • Fuzzy sets
    • Zadeh LA (1965) Fuzzy sets. Inf Control 8(3):338-353
    • (1965) Inf Control , vol.8 , Issue.3 , pp. 338-353
    • Zadeh, L.A.1
  • 43
    • 60949107906 scopus 로고    scopus 로고
    • Simulation-based optimization of dispatching rules for semiconductor wafer fabrication system scheduling by the response surface methodology
    • Zhang H, Jiang Z, Guo C (2008) Simulation-based optimization of dispatching rules for semiconductor wafer fabrication system scheduling by the response surface methodology. Int J Adv Manuf Technol 41(1-2):110-121
    • (2008) Int J Adv Manuf Technol , vol.41 , Issue.1-2 , pp. 110-121
    • Zhang, H.1    Jiang, Z.2    Guo, C.3
  • 44
    • 41449119248 scopus 로고    scopus 로고
    • Neural network-based simulation meta-models for predicting probability distributions
    • Zobel CW, Keeling KB (2008) Neural network-based simulation meta-models for predicting probability distributions. Comput Ind Eng 54(4):879-888
    • (2008) Comput Ind Eng , vol.54 , Issue.4 , pp. 879-888
    • Zobel, C.W.1    Keeling, K.B.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.