-
1
-
-
36048943650
-
Using ant colony optimization to solve hybrid flow shop scheduling problems
-
Alaykýran K, Engin O, Döyen A (2007) Using ant colony optimization to solve hybrid flow shop scheduling problems. Int J Adv Manuf Technol 35(5-6):541-550
-
(2007)
Int J Adv Manuf Technol
, vol.35
, Issue.5-6
, pp. 541-550
-
-
Alaykýran, K.1
Engin, O.2
Döyen, A.3
-
2
-
-
10444260511
-
Integrating simulation and optimization to schedule a hybrid flow shop with maintenance constraints
-
Allaoui H, Artiba A (2004) Integrating simulation and optimization to schedule a hybrid flow shop with maintenance constraints. Comput Ind Eng 47(4):431-450
-
(2004)
Comput Ind Eng
, vol.47
, Issue.4
, pp. 431-450
-
-
Allaoui, H.1
Artiba, A.2
-
3
-
-
15344340038
-
Using computer simulation in a heavy electromotors assembly line unit
-
Azadeh MA, Karimizad K, Shakeri SH (2000) Using computer simulation in a heavy electromotors assembly line unit. J Faculty Engineering 34(2):127-139
-
(2000)
J Faculty Engineering
, vol.34
, Issue.2
, pp. 127-139
-
-
Azadeh, M.A.1
Karimizad, K.2
Shakeri, S.H.3
-
4
-
-
28044435648
-
Design of practical optimum jit systems by integration of computer simulation and analysis of variance
-
Azadeh MA, Bidokhti B, Sakkaki SMR (2005) Design of practical optimum JIT systems by integration of computer simulation and analysis of variance. Comput Ind Eng 49(4):504-519
-
(2005)
Comput Ind Eng
, vol.49
, Issue.4
, pp. 504-519
-
-
Azadeh, M.A.1
Bidokhti, B.2
Smr, S.3
-
5
-
-
61649097058
-
Hybrid simulated annealing in flow shop scheduling: A diversification and intensification approach
-
Azizi N, Liang M, Zolfaghari S (2009) Hybrid simulated annealing in flow shop scheduling: a diversification and intensification approach. Int J Ind Systems Eng 4(3):326-348
-
(2009)
Int J Ind Systems Eng
, vol.4
, Issue.3
, pp. 326-348
-
-
Azizi, N.1
Liang, M.2
Zolfaghari, S.3
-
6
-
-
0031256963
-
Simple priority rule combinations: An approach to improve both flow time and tardiness
-
Barman S (1997) Simple priority rule combinations: an approach to improve both flow time and tardiness. Int J Prod Res 35 (10):2857-2870
-
(1997)
Int J Prod Res
, vol.35
, Issue.10
, pp. 2857-2870
-
-
Barman, S.1
-
7
-
-
0033906893
-
Hybrid flow shop scheduling with precedence constrains and time lags to minimize maximum lateness
-
Botta-Genoulaz V (2000) Hybrid flow shop scheduling with precedence constrains and time lags to minimize maximum lateness. Int J Prod Econ 64(1-3):101-111
-
(2000)
Int J Prod Econ
, vol.64
, Issue.1-3
, pp. 101-111
-
-
Botta-Genoulaz, V.1
-
8
-
-
0033078202
-
Heuristics for scheduling in a flow shop with multiple processors
-
Brah SA, Loo LL (1999) Heuristics for scheduling in a flow shop with multiple processors. Eur J Oper Res 113(1):113-122
-
(1999)
Eur J Oper Res
, vol.113
, Issue.1
, pp. 113-122
-
-
Brah, S.A.1
Loo, L.L.2
-
9
-
-
0030217535
-
Ranking dispatching rules by data envelopment analysis in a job shop environment
-
Chang YL, Sueyoshi T, Sullivan RS (1996) Ranking dispatching rules by data envelopment analysis in a job shop environment. IIE Trans 28(8):631-642
-
(1996)
IIE Trans
, vol.28
, Issue.8
, pp. 631-642
-
-
Chang, Y.L.1
Sueyoshi, T.2
Sullivan, R.S.3
-
10
-
-
70350537138
-
A nonlinear scheduling rule incorporating fuzzy-neural remaining cycle time estimator for scheduling a semiconductor manufacturing factory-a simulation study
-
Chen T, Wang YC (2009) A nonlinear scheduling rule incorporating fuzzy-neural remaining cycle time estimator for scheduling a semiconductor manufacturing factory-a simulation study. Int J Adv Manuf Technol 45(1-2):110-121
-
(2009)
Int J Adv Manuf Technol
, vol.45
, Issue.1-2
, pp. 110-121
-
-
Chen, T.1
Wang, Y.C.2
-
11
-
-
4043129481
-
Fuzzy multi-criteria selection of object-oriented simulation software for production system analysis
-
Cochran JK, Chen HN (2005) Fuzzy multi-criteria selection of object-oriented simulation software for production system analysis. Comput Oper Res 32(1):153-168
-
(2005)
Comput Oper Res
, vol.32
, Issue.1
, pp. 153-168
-
-
Cochran, J.K.1
Chen, H.N.2
-
12
-
-
69649083513
-
Solving multi-objective sdst flexible flow shop using grasp algorithm
-
Davoudpour H, Ashrafi M (2009) Solving multi-objective SDST flexible flow shop using GRASP algorithm. Int J Adv Manuf Technol 44(7-8):737-747
-
(2009)
Int J Adv Manuf Technol
, vol.44
, Issue.7-8
, pp. 737-747
-
-
Davoudpour, H.1
Ashrafi, M.2
-
14
-
-
68149100772
-
A heuristic for priority-based scheduling in a turbine manufacturing job-shop
-
Dulluri S, Mahesh V, Rao CSP (2008) A heuristic for priority-based scheduling in a turbine manufacturing job-shop. Int J Ind Systems Eng 3(6):625-643
-
(2008)
Int J Ind Systems Eng
, vol.3
, Issue.6
, pp. 625-643
-
-
Dulluri, S.1
Mahesh, V.2
Csp, R.3
-
16
-
-
0032599551
-
Generic simulation model for hybrid flow shop
-
Grangeon N, Tanguy A, Chernev N (1999) Generic simulation model for hybrid flow shop. Comput Ind Eng 137(1-2):207-210
-
(1999)
Comput Ind Eng
, vol.137
, Issue.1-2
, pp. 207-210
-
-
Grangeon, N.1
Tanguy, A.2
Chernev, N.3
-
17
-
-
0004063090
-
-
Prentice Hall, New Jersey
-
Haykin S (1999) Neural networks. Prentice Hall, New Jersey
-
(1999)
Neural Networks
-
-
Haykin, S.1
-
18
-
-
70349294190
-
No-wait two-stage multiprocessor flow shop scheduling with unit setup
-
Huang RH, Yang CL, Huang YC (2008) No-wait two-stage multiprocessor flow shop scheduling with unit setup. Int J Adv Manuf Technol 44(9-10):921-927
-
(2008)
Int J Adv Manuf Technol
, vol.44
, Issue.9-10
, pp. 921-927
-
-
Huang, R.H.1
Yang, C.L.2
Huang, Y.C.3
-
19
-
-
0034286617
-
A comparative analysis of different approaches to scheduling in flexible flow shops
-
Jayamohan MS, Rajendran C (2000) A comparative analysis of different approaches to scheduling in flexible flow shops. Prod Plan Control 11(6):572-580
-
(2000)
Prod Plan Control
, vol.11
, Issue.6
, pp. 572-580
-
-
Jayamohan, M.S.1
Rajendran, C.2
-
20
-
-
0031073978
-
A fuzzy integrated decision-making support system for scheduling of fms using simulation
-
Kazerooni A, Chan FTS, Abhary K (1997) A fuzzy integrated decision-making support system for scheduling of FMS using simulation. Comput-Integr Manuf Syst 10(1):27-34
-
(1997)
Comput-integr Manuf Syst
, vol.10
, Issue.1
, pp. 27-34
-
-
Kazerooni, A.1
Fts, C.2
Abhary, K.3
-
21
-
-
34547778459
-
Simulation meta-model development using uniform design and neural networks for automated material handling systems in semiconductor wafer fabrication
-
Kuo Y, Taho Y, Peters BA, Chang I (2007) Simulation meta-model development using uniform design and neural networks for automated material handling systems in semiconductor wafer fabrication. Simul Modeling Pract Theory 15(8):1002-1015
-
(2007)
Simul Modeling Pract Theory
, vol.15
, Issue.8
, pp. 1002-1015
-
-
Kuo, Y.1
Taho, Y.2
Peters, B.A.3
Chang, I.4
-
22
-
-
42049114830
-
Using simulation and multi-criteria methods to provide robust solutions to dispatching problems in a flow shop with multiple processors
-
Kuo Y, Yang T, Cho C, Tseng YC (2008) Using simulation and multi-criteria methods to provide robust solutions to dispatching problems in a flow shop with multiple processors. Math Comput Simul 78(1):40-56
-
(2008)
Math Comput Simul
, vol.78
, Issue.1
, pp. 40-56
-
-
Kuo, Y.1
Yang, T.2
Cho, C.3
Tseng, Y.C.4
-
23
-
-
33846194668
-
An effective hybrid particle swarm optimization for no-wait flow shop scheduling
-
Liu B, Wang L, Jin YH (2006) An effective hybrid particle swarm optimization for no-wait flow shop scheduling. Int J Adv Manuf Technol 31(9-10):1001-1011
-
(2006)
Int J Adv Manuf Technol
, vol.31
, Issue.9-10
, pp. 1001-1011
-
-
Liu, B.1
Wang, L.2
Jin, Y.H.3
-
24
-
-
38749118677
-
An effective hybrid pso-based algorithm for flow shop scheduling with limited buffers
-
Liu B, Wang L, Jin YH (2008) An effective hybrid PSO-based algorithm for flow shop scheduling with limited buffers. Comput Oper Res 35(9):2791-2806
-
(2008)
Comput Oper Res
, vol.35
, Issue.9
, pp. 2791-2806
-
-
Liu, B.1
Wang, L.2
Jin, Y.H.3
-
25
-
-
76549113337
-
Training a neural network to select dispatching rules in real time
-
doi:10.1016/j.cie.2009.03.008
-
Mouelhi-Chibani W, Pierreval H (2009) Training a neural network to select dispatching rules in real time. Comput Ind Eng. doi:10.1016/j.cie.2009.03.008
-
(2009)
Comput Ind Eng.
-
-
Mouelhi-Chibani, W.1
Pierreval, H.2
-
27
-
-
34047222441
-
The three-machine flow shop scheduling problem to minimize maximum lateness with separate setup times
-
Ng CT, Allahverdi A, Al-Anzi FS, Cheng TCE (2007) The three-machine flow shop scheduling problem to minimize maximum lateness with separate setup times. Int J Oper Research 2(2):135-155
-
(2007)
Int J Oper Research
, vol.2
, Issue.2
, pp. 135-155
-
-
Ng, C.T.1
Allahverdi, A.2
Al-Anzi, F.S.3
Cheng, T.C.E.4
-
28
-
-
33750007920
-
A bicriterian flow shop scheduling using artificial neural network
-
Noorul Haq A, Ramanan TR (2005) A bicriterian flow shop scheduling using artificial neural network. Int J Adv Manuf Technol 30(11-12):1132-1138
-
(2005)
Int J Adv Manuf Technol
, vol.30
, Issue.11-12
, pp. 1132-1138
-
-
Noorul Haq, A.1
Ramanan, T.R.2
-
29
-
-
67349127659
-
Hybrid fuzzy set-based polynomial neural networks and their development with the aid of genetic optimization and information granulation
-
Oh SK, Pedrycz W, Roh SB (2009) Hybrid fuzzy set-based polynomial neural networks and their development with the aid of genetic optimization and information granulation. Appl Soft Computing 9(3):1068-1089
-
(2009)
Appl Soft Computing
, vol.9
, Issue.3
, pp. 1068-1089
-
-
Oh, S.K.1
Pedrycz, W.2
Roh, S.B.3
-
30
-
-
33749176597
-
Simulation of fuzzy multiattribute models for grey relationships
-
Olson DL, Wu D (2006) Simulation of fuzzy multiattribute models for grey relationships. Eur J Oper Res 175(1):111-120
-
(2006)
Eur J Oper Res
, vol.175
, Issue.1
, pp. 111-120
-
-
Olson, D.L.1
Wu, D.2
-
31
-
-
0036497435
-
A fuzzy logic based methodology to rank shop floor dispatch rules
-
Petroni A, Rizzi A (2002) A fuzzy logic based methodology to rank shop floor dispatch rules. Int J Prod Econ 76(1):99-108
-
(2002)
Int J Prod Econ
, vol.76
, Issue.1
, pp. 99-108
-
-
Petroni, A.1
Rizzi, A.2
-
34
-
-
39149138667
-
Simulation of discrete linear time-invariant fuzzy dynamic systems
-
Puig V, Saludes J, Quevedo J (2008) Simulation of discrete linear time-invariant fuzzy dynamic systems. Fuzzy Sets Syst 159 (7):787-803
-
(2008)
Fuzzy Sets Syst
, vol.159
, Issue.7
, pp. 787-803
-
-
Puig, V.1
Saludes, J.2
Quevedo, J.3
-
35
-
-
40249109955
-
Analysis of heuristics for the uet two-machine flow shop problem with time delays
-
Rayward-Smith VJ, Rebaine D (2008) Analysis of heuristics for the UET two-machine flow shop problem with time delays. Comput Oper Res 35(10):3298-3310
-
(2008)
Comput Oper Res
, vol.35
, Issue.10
, pp. 3298-3310
-
-
Rayward-Smith, V.J.1
Rebaine, D.2
-
36
-
-
0030243899
-
An evaluation of sequencing heuristics in flow shops with multiple processors
-
Santos DL, Hunsucker JL, Deal DE (1996) An evaluation of sequencing heuristics in flow shops with multiple processors. Comput Ind Eng 30(4):681-692
-
(1996)
Comput Ind Eng
, vol.30
, Issue.4
, pp. 681-692
-
-
Santos, D.L.1
Hunsucker, J.L.2
Deal, D.E.3
-
37
-
-
38849162891
-
Evolving dispatching rules using genetic programming for solving multi-objective flexible job-shop problems
-
Tay JC, Ho NB (2008) Evolving dispatching rules using genetic programming for solving multi-objective flexible job-shop problems. Comput Ind Eng 54(3):453-473
-
(2008)
Comput Ind Eng
, vol.54
, Issue.3
, pp. 453-473
-
-
Tay, J.C.1
Ho, N.B.2
-
38
-
-
0141636340
-
A new heuristic for minimal makespan in flow shops with multiple processors and no intermediate storage
-
Thornton HW, Hunsucker JL (2004) A new heuristic for minimal makespan in flow shops with multiple processors and no intermediate storage. Eur J Oper Res 152(1):96-114
-
(2004)
Eur J Oper Res
, vol.152
, Issue.1
, pp. 96-114
-
-
Thornton, H.W.1
Hunsucker, J.L.2
-
39
-
-
57349124886
-
Scheduling parallel batch processors with incompatible job families to minimize weighted completion time
-
Venkataramana M, Raghavan NRS (2009) Scheduling parallel batch processors with incompatible job families to minimize weighted completion time. Int J Ind Systems Engineering 4(1):76-93
-
(2009)
Int J Ind Systems Engineering
, vol.4
, Issue.1
, pp. 76-93
-
-
Venkataramana, M.1
Nrs, R.2
-
40
-
-
0037278745
-
An effective hybrid heuristic for flow shop scheduling
-
Wang L, Zheng D (2003) An effective hybrid heuristic for flow shop scheduling. Int J Adv Manuf Technol 21(1):38-44
-
(2003)
Int J Adv Manuf Technol
, vol.21
, Issue.1
, pp. 38-44
-
-
Wang, L.1
Zheng, D.2
-
41
-
-
33750013118
-
A genetic algorithms simulation approach for the multi-attribute combinatorial dispatching decision problem
-
Yang T, Kuo Y, Cho C (2007) A genetic algorithms simulation approach for the multi-attribute combinatorial dispatching decision problem. Eur J Oper Res 176(3):1859-1873
-
(2007)
Eur J Oper Res
, vol.176
, Issue.3
, pp. 1859-1873
-
-
Yang, T.1
Kuo, Y.2
Cho, C.3
-
42
-
-
34248666540
-
Fuzzy sets
-
Zadeh LA (1965) Fuzzy sets. Inf Control 8(3):338-353
-
(1965)
Inf Control
, vol.8
, Issue.3
, pp. 338-353
-
-
Zadeh, L.A.1
-
43
-
-
60949107906
-
Simulation-based optimization of dispatching rules for semiconductor wafer fabrication system scheduling by the response surface methodology
-
Zhang H, Jiang Z, Guo C (2008) Simulation-based optimization of dispatching rules for semiconductor wafer fabrication system scheduling by the response surface methodology. Int J Adv Manuf Technol 41(1-2):110-121
-
(2008)
Int J Adv Manuf Technol
, vol.41
, Issue.1-2
, pp. 110-121
-
-
Zhang, H.1
Jiang, Z.2
Guo, C.3
-
44
-
-
41449119248
-
Neural network-based simulation meta-models for predicting probability distributions
-
Zobel CW, Keeling KB (2008) Neural network-based simulation meta-models for predicting probability distributions. Comput Ind Eng 54(4):879-888
-
(2008)
Comput Ind Eng
, vol.54
, Issue.4
, pp. 879-888
-
-
Zobel, C.W.1
Keeling, K.B.2
|