메뉴 건너뛰기




Volumn 3, Issue 6, 2008, Pages 625-643

A heuristic for priority-based scheduling in a turbine manufacturing job-shop

Author keywords

Break downs; Combinatorial optimisation; Constraint satisfaction problem; CSP; Dynamic; Job shop; Material availability; Priority; Scheduling

Indexed keywords

COMBINATORIAL OPTIMIZATION; CONSTRAINT SATISFACTION PROBLEMS; DYNAMICS; INDUSTRIAL RESEARCH; MANUFACTURE; OPTIMIZATION; SCHEDULING;

EID: 68149100772     PISSN: 17485037     EISSN: 17485045     Source Type: Journal    
DOI: 10.1504/IJISE.2008.020678     Document Type: Article
Times cited : (11)

References (32)
  • 1
    • 0021466185 scopus 로고
    • Towards a general theory of action and time
    • Allen, J.F. (1984) 'Towards a general theory of action and time', Artificial Intelligence, Vol. 23, pp.123-154.
    • (1984) Artificial Intelligence , vol.23 , pp. 123-154
    • Allen, J.F.1
  • 2
    • 34548440648 scopus 로고    scopus 로고
    • Lagrangian bounds for just-in-time job-shop scheduling
    • Baptiste et al. (2008) 'Lagrangian bounds for just-in-time job-shop scheduling', Computers and Operations Research, Vol. 35, No. 3, pp.906-915.
    • (2008) Computers and Operations Research , vol.35 , Issue.3 , pp. 906-915
    • Baptiste1
  • 3
    • 68149095400 scopus 로고    scopus 로고
    • The stochastic makespan problem
    • Department of Mechanical Engineering, The University of Texas at Austin, Austin, USA
    • Bauke, B., et al. (2005) 'The stochastic makespan problem', Submitted to Operations Research Journal, Department of Mechanical Engineering, The University of Texas at Austin, Austin, USA.
    • (2005) Submitted to Operations Research Journal
    • Bauke, B.1
  • 4
    • 4344628823 scopus 로고    scopus 로고
    • From fluid relaxations to practical algorithms for high-multiplicity job-shop scheduling: The holding cost objective
    • Bertsimas, D., et al. (2003) 'From fluid relaxations to practical algorithms for high-multiplicity job-shop scheduling: The holding cost objective', Operations Research, Vol. 51, No. 5, pp.798-813.
    • (2003) Operations Research , vol.51 , Issue.5 , pp. 798-813
    • Bertsimas, D.1
  • 5
    • 68149110457 scopus 로고    scopus 로고
    • Blum, C. (2002) 'Metaheuristics for group shop scheduling', Master's Thesis, Universite Libre de Bruxelles, IRIDIA, Belgium, Available at: cblumυlb.ac.be.
    • Blum, C. (2002) 'Metaheuristics for group shop scheduling', Master's Thesis, Universite Libre de Bruxelles, IRIDIA, Belgium, Available at: cblumυlb.ac.be.
  • 6
    • 36348936649 scopus 로고    scopus 로고
    • A memetic algorithm for the job-shop with time-lags
    • Caumond, A., et al. (2008) 'A memetic algorithm for the job-shop with time-lags', Computers and Operations Research, Vol. 35, No. 7, pp.2331-2356.
    • (2008) Computers and Operations Research , vol.35 , Issue.7 , pp. 2331-2356
    • Caumond, A.1
  • 8
    • 34447289102 scopus 로고    scopus 로고
    • A hybrid of genetic algorithm and bottleneck shifting for multiobjective flexible job shop scheduling problems
    • Goa, J., et al. (2007) 'A hybrid of genetic algorithm and bottleneck shifting for multiobjective flexible job shop scheduling problems', Computers and Industrial Engineering, Vol. 53, No. 1, pp.149-162.
    • (2007) Computers and Industrial Engineering , vol.53 , Issue.1 , pp. 149-162
    • Goa, J.1
  • 9
    • 0012533045 scopus 로고    scopus 로고
    • Better approximation guarantees for job-shop scheduling
    • Goldberg, L.A., et al. (2001) 'Better approximation guarantees for job-shop scheduling', SIAM Journal of Discrete Mathematics, Vol. 14, No. 1, pp.67-92.
    • (2001) SIAM Journal of Discrete Mathematics , vol.14 , Issue.1 , pp. 67-92
    • Goldberg, L.A.1
  • 10
    • 33747786647 scopus 로고    scopus 로고
    • Mathematical model and genetic optimization for the job shop scheduling problem in a mixed- and multi-product assembly environment: A case study based on the apparel industry
    • Guo, Z.X., et al. (2006) 'Mathematical model and genetic optimization for the job shop scheduling problem in a mixed- and multi-product assembly environment: A case study based on the apparel industry', Computers and Industrial Engineering, Vol. 50, No. 3, pp.202-219.
    • (2006) Computers and Industrial Engineering , vol.50 , Issue.3 , pp. 202-219
    • Guo, Z.X.1
  • 12
    • 0019067870 scopus 로고
    • Increasing tree search efficiency for constraint satisfaction problems
    • Haralick, R.M. and Elliott, G.L. (1980) 'Increasing tree search efficiency for constraint satisfaction problems', Artificial Intelligence, Vol. 14, pp.263-313.
    • (1980) Artificial Intelligence , vol.14 , pp. 263-313
    • Haralick, R.M.1    Elliott, G.L.2
  • 13
    • 33644681713 scopus 로고    scopus 로고
    • A grid-based scheduling system of manufacturing resources for a virtual enterprise
    • Hong, D., et al. (2006) 'A grid-based scheduling system of manufacturing resources for a virtual enterprise', International Journal of Advanced Manufacturing Technology, Vol. 28, No. 2, pp.137-141.
    • (2006) International Journal of Advanced Manufacturing Technology , vol.28 , Issue.2 , pp. 137-141
    • Hong, D.1
  • 17
    • 68149089948 scopus 로고    scopus 로고
    • Krishna, L.S.R., et al. (2002b) 'Web integrated inventory and machine scheduling decision support system for a multi-product manufacturing industry', International Conference on e-Manufacturing: An Emerging Need for 21st Century World - Class Enterprises, Institution of Engineers (India) M.P. State Centre, Bhopal, held at MANIT Bhopal from 17-19 November.
    • Krishna, L.S.R., et al. (2002b) 'Web integrated inventory and machine scheduling decision support system for a multi-product manufacturing industry', International Conference on e-Manufacturing: An Emerging Need for 21st Century World - Class Enterprises, Institution of Engineers (India) M.P. State Centre, Bhopal, held at MANIT Bhopal from 17-19 November.
  • 18
    • 33644699284 scopus 로고    scopus 로고
    • Integration of process planning and scheduling in a job-shop environment
    • Kumar, M. and Rajotia, S. (2006) 'Integration of process planning and scheduling in a job-shop environment', International Journal of Advanced Manufacturing Technology, Vol. 28, No. 1, pp.108-116.
    • (2006) International Journal of Advanced Manufacturing Technology , vol.28 , Issue.1 , pp. 108-116
    • Kumar, M.1    Rajotia, S.2
  • 19
    • 0032654876 scopus 로고    scopus 로고
    • An effective approach for job-shop scheduling with uncertain processing requirements
    • Luh, P.B., et al. (1999) 'An effective approach for job-shop scheduling with uncertain processing requirements', IEEE Transactions on Robotics and Automation, Vol. 15, No. 2, pp.328-339.
    • (1999) IEEE Transactions on Robotics and Automation , vol.15 , Issue.2 , pp. 328-339
    • Luh, P.B.1
  • 21
    • 68149086099 scopus 로고    scopus 로고
    • Design and development of a database oriented scheduling system for a multiproduct manufacturing industry
    • Turkey, 26-28 June
    • Mahesh, V., et al. (2002) 'Design and development of a database oriented scheduling system for a multiproduct manufacturing industry', Second International Conference on Responsive Manufacturing, Held at Gazientep, Turkey, 26-28 June.
    • (2002) Second International Conference on Responsive Manufacturing, Held at Gazientep
    • Mahesh, V.1
  • 23
    • 0037210011 scopus 로고    scopus 로고
    • Scheduling rules for dynamic shops that manufacture multi-level jobs
    • Mohanasundaram, K.M., et al. (2003) 'Scheduling rules for dynamic shops that manufacture multi-level jobs', Computers and Industrial Engineering, Vol. 44, No. 1, pp.119-131.
    • (2003) Computers and Industrial Engineering , vol.44 , Issue.1 , pp. 119-131
    • Mohanasundaram, K.M.1
  • 25
    • 33751191658 scopus 로고    scopus 로고
    • A hybrid particle swarm optimization for job shop scheduling problem
    • Sha, D.Y. and Hsu, C.Y. (2006) 'A hybrid particle swarm optimization for job shop scheduling problem', Computers and Industrial Engineering Vol. 51, No. 4, pp.791-808.
    • (2006) Computers and Industrial Engineering , vol.51 , Issue.4 , pp. 791-808
    • Sha, D.Y.1    Hsu, C.Y.2
  • 26
    • 33847157999 scopus 로고    scopus 로고
    • Late work minimization in a small flexible manufacturing system
    • Stern, M. (2007) 'Late work minimization in a small flexible manufacturing system', Computers and Industrial Engineering, Vol. 52, No. 2, pp.210-228.
    • (2007) Computers and Industrial Engineering , vol.52 , Issue.2 , pp. 210-228
    • Stern, M.1
  • 27
    • 34447251448 scopus 로고    scopus 로고
    • Capability of cumulative delay based reactive scheduling for job shops with machine breakdowns
    • Suwa, H. and Sandoh, H. (2007) 'Capability of cumulative delay based reactive scheduling for job shops with machine breakdowns', Computers and Industrial Engineering, Vol. 53, No. 1, pp.63-78.
    • (2007) Computers and Industrial Engineering , vol.53 , Issue.1 , pp. 63-78
    • Suwa, H.1    Sandoh, H.2
  • 28
    • 15344347475 scopus 로고    scopus 로고
    • A computer simulation model for job shop scheduling problems minimizing makespan
    • Tavakkoli-Moghaddam, R. and Daneshmand-Mehr, M. (2005) 'A computer simulation model for job shop scheduling problems minimizing makespan', Computers and Industrial Engineering, Vol. 48, No. 4, pp.811-823.
    • (2005) Computers and Industrial Engineering , vol.48 , Issue.4 , pp. 811-823
    • Tavakkoli-Moghaddam, R.1    Daneshmand-Mehr, M.2
  • 29
    • 28044452691 scopus 로고    scopus 로고
    • Scheduling in dynamic assembly job-shops to minimize the sum of weighted earliness, weighted tardiness and weighted flowtime of jobs
    • Thiagarajan, S. and Rajendran, C. (2005) 'Scheduling in dynamic assembly job-shops to minimize the sum of weighted earliness, weighted tardiness and weighted flowtime of jobs', Computers and Industrial Engineering Vol. 49, No. 4, pp.463-503.
    • (2005) Computers and Industrial Engineering , vol.49 , Issue.4 , pp. 463-503
    • Thiagarajan, S.1    Rajendran, C.2
  • 31
    • 68149126951 scopus 로고    scopus 로고
    • Yamada, T. and Nakano, R. (1997) Genetic Algorithms in Engineering Systems, 1 of 55, chap. Job-Shop Scheduling. IEE Control Engineering, ISBN: 0 85296 902 3.
    • Yamada, T. and Nakano, R. (1997) Genetic Algorithms in Engineering Systems, Vol. 1 of 55, chap. Job-Shop Scheduling. IEE Control Engineering, ISBN: 0 85296 902 3.
  • 32
    • 34250219585 scopus 로고    scopus 로고
    • A very fast TS/SA algorithm for the job shop scheduling problem
    • Zhang, C.Y., et al. (2008) 'A very fast TS/SA algorithm for the job shop scheduling problem', Computers and Operations Research, Vol. 35, No. 1, pp.282-294.
    • (2008) Computers and Operations Research , vol.35 , Issue.1 , pp. 282-294
    • Zhang, C.Y.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.