메뉴 건너뛰기




Volumn 49, Issue 4, 2005, Pages 504-519

Erratum to "Design of practical optimum JIT systems by integration of computer simulation and analysis of variance" [Computers & Industrial Engineering Volume (49/4) 504-519] (DOI:10.1016/j.cie.2005.03.005);Design of practical optimum JIT systems by integration of computer simulation and analysis of variance

Author keywords

Analysis of variance; Integration; Just in time; Optimum; Practical; Simulation

Indexed keywords

COMPUTER SIMULATION; DESIGN; INTEGRATION; MATHEMATICAL MODELS; ROLLING MILLS; SCHEDULING;

EID: 28044435648     PISSN: 03608352     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.cie.2009.01.008     Document Type: Erratum
Times cited : (22)

References (60)
  • 1
    • 0027654294 scopus 로고
    • A systematic simulation approach for the design of JIT manufacturing systems
    • G. Abdou, and S. Dutta A systematic simulation approach for the design of JIT manufacturing systems Journal of Operations Management 11 3 1993
    • (1993) Journal of Operations Management , vol.11 , Issue.3
    • Abdou, G.1    Dutta, S.2
  • 2
    • 0011756777 scopus 로고
    • On some factors affecting the just-in-time production system output variability: A simulation study using Taguchi technique
    • G. Abdul-Nour On some factors affecting the just-in-time production system output variability: A simulation study using Taguchi technique Computers and Industrial Engineering 25 1-4 1993
    • (1993) Computers and Industrial Engineering , vol.25 , Issue.1-4
    • Abdul-Nour, G.1
  • 4
    • 0012321013 scopus 로고    scopus 로고
    • Successful implementation of computer simulation in industrial plants
    • M.A. Azadeh, and K. Jalali Farahani Successful implementation of computer simulation in industrial plants Foolad (Steel) Journal 46 1998
    • (1998) Foolad (Steel) Journal , vol.46
    • Azadeh, M.A.1    Jalali Farahani, K.2
  • 7
    • 28044467686 scopus 로고    scopus 로고
    • MS thesis in industrial engineering, the Faculty of Engineering, University of Tehran, November
    • Beydokhti, B. (2000). Modeling and simulation of a JIT system in an auto industry. MS thesis in industrial engineering, the Faculty of Engineering, University of Tehran, November.
    • (2000) Modeling and Simulation of a JIT System in an Auto Industry
    • Beydokhti, B.1
  • 10
    • 0031119839 scopus 로고    scopus 로고
    • JIT in auto vehicle manufacturing: The Minivan-Piaggio V.E. case study
    • M. Caputo, and R. Dulmin JIT in auto vehicle manufacturing: The Minivan-Piaggio V.E. case study Production Planning and Control 8 3 1997
    • (1997) Production Planning and Control , vol.8 , Issue.3
    • Caputo, M.1    Dulmin, R.2
  • 12
    • 0024166768 scopus 로고
    • Effect of learning JIT production system: A simulation experiment on microcomputer
    • C. Changchit, and H.K. Kung Effect of learning JIT production system: A simulation experiment on microcomputer Computers and Industrial Engineering 15 1-4 1988
    • (1988) Computers and Industrial Engineering , vol.15 , Issue.1-4
    • Changchit, C.1    Kung, H.K.2
  • 13
    • 28044473820 scopus 로고
    • Simulation analysis of just-in-time feasibility in a manufacturing environment
    • G. Chengalvarayan, and S.C. Parker Simulation analysis of just-in-time feasibility in a manufacturing environment Computers and Industrial Engineering 21 1-4 1991
    • (1991) Computers and Industrial Engineering , vol.21 , Issue.1-4
    • Chengalvarayan, G.1    Parker, S.C.2
  • 14
    • 0029368232 scopus 로고
    • Conceptual design of a warehouse for just-in-time operations in a bakery
    • G. Cormier, and D. Kersey Conceptual design of a warehouse for just-in-time operations in a bakery Computers and Industrial Engineering 29 1-4 1995
    • (1995) Computers and Industrial Engineering , vol.29 , Issue.1-4
    • Cormier, G.1    Kersey, D.2
  • 16
    • 28044445837 scopus 로고
    • Design of a synchronous manufacturing system with just-in-time production
    • P.J. Egbelu Design of a synchronous manufacturing system with just-in-time production Computers and Industrial Engineering 21 1-4 1991
    • (1991) Computers and Industrial Engineering , vol.21 , Issue.1-4
    • Egbelu, P.J.1
  • 17
    • 0029468254 scopus 로고
    • Spreadsheet simulation to aid capacity management of batch chemical processing using JIT pull control
    • J.N. Ezingeard, and P. Race Spreadsheet simulation to aid capacity management of batch chemical processing using JIT pull control International Journal of Operations and Production Management 15 10 1995
    • (1995) International Journal of Operations and Production Management , vol.15 , Issue.10
    • Ezingeard, J.N.1    Race, P.2
  • 20
    • 0027908815 scopus 로고
    • Simulation-based training in support of low inventory apparel production
    • J.R. Gross Simulation-based training in support of low inventory apparel production Production and Inventory Management Journal 1993
    • (1993) Production and Inventory Management Journal
    • Gross, J.R.1
  • 23
    • 0032300132 scopus 로고    scopus 로고
    • A simulation and comparative study of CONWIP Kanban and MRP production control system in a cold rolling plant
    • M. Huang, D. Wang, and W.H. Ip A simulation and comparative study of CONWIP Kanban and MRP production control system in a cold rolling plant Production Planning and Control 9 8 1998
    • (1998) Production Planning and Control , vol.9 , Issue.8
    • Huang, M.1    Wang, D.2    Ip, W.H.3
  • 24
    • 84989486136 scopus 로고
    • A simulation analysis of the Japanese just-in-time techniques (with kanban) for a multiline, multistage production system
    • P.Y. Huang, L.P. Rees, and B.W. Taylor III A simulation analysis of the Japanese just-in-time techniques (with kanban) for a multiline, multistage production system Decision Sciences 14 1983
    • (1983) Decision Sciences , vol.14
    • Huang, P.Y.1    Rees, L.P.2    Iii, W.T.B.3
  • 25
    • 0022161887 scopus 로고
    • Integrating the MR-based control level and the multi-stage production shop level of a manufacturing system via network simulation
    • P.Y. Huang, L.P. Rees, and B.W. Taylor III Integrating the MR-based control level and the multi-stage production shop level of a manufacturing system via network simulation International Journal of Production Research 6 1985
    • (1985) International Journal of Production Research , vol.6
    • Huang, P.Y.1    Rees, L.P.2    Iii, W.T.B.3
  • 26
    • 0002691514 scopus 로고
    • JIT scheduling rules: A simulation evaluation
    • S.H. Hum, and C.K. Lee JIT scheduling rules: A simulation evaluation Omega 26 3 1988
    • (1988) Omega , vol.26 , Issue.3
    • Hum, S.H.1    Lee, C.K.2
  • 32
    • 0029387149 scopus 로고
    • A simulation analysis of sequencing alternatives for JIT lines using kanban
    • R.R. Lummus A simulation analysis of sequencing alternatives for JIT lines using kanban Journal of Production Economics 13 3 1995
    • (1995) Journal of Production Economics , vol.13 , Issue.3
    • Lummus, R.R.1
  • 33
    • 0025469496 scopus 로고
    • A rule based simulator for modeling JIT manufacturing system
    • S. Manivannan, and C.D. Pegden A rule based simulator for modeling JIT manufacturing system Simulation 1990
    • (1990) Simulation
    • Manivannan, S.1    Pegden, C.D.2
  • 39
    • 0031641970 scopus 로고    scopus 로고
    • Optimum number of Kanbans between two adjacent Stations
    • Nori, V.S. and Sarker, B.R. (1998). Optimum number of Kanbans between two adjacent Stations. Production Planning and Control, 9(1).
    • (1998) Production Planning and Control , vol.9 , Issue.1
    • Nori, V.S.1    Sarker, B.R.2
  • 43
    • 0023327418 scopus 로고
    • A review of kanban - The Japanese 'just-in-time' production system
    • H.M. Reda A review of kanban - the Japanese 'just-in-time' production system Engineering Management International 4 1987 2
    • (1987) Engineering Management International , vol.4 , pp. 2
    • Reda, H.M.1
  • 45
    • 0031235185 scopus 로고    scopus 로고
    • The impact of JIT manufacturing and its infrastructure on manufacturing performance
    • S. Sakakibara, B.B. Flynn, R.G. Schroeder, and W.T. Morris The impact of JIT manufacturing and its infrastructure on manufacturing performance Management Science 43 9 1997
    • (1997) Management Science , vol.43 , Issue.9
    • Sakakibara, S.1    Flynn, B.B.2    Schroeder, R.G.3    Morris, W.T.4
  • 55
    • 28044451257 scopus 로고    scopus 로고
    • Simulation optimizes JIT system design
    • September
    • Simulation Optimizes JIT System Design (1997).Modern material handling, 52, September.
    • (1997) Modern Material Handling , vol.52
  • 56
    • 0030082178 scopus 로고    scopus 로고
    • Order release in JIT production system: A simulation study
    • K. Takahashi, N. Nakamura, and K. Ohashi Order release in JIT production system: A simulation study Simulation 66 2 1996
    • (1996) Simulation , vol.66 , Issue.2
    • Takahashi, K.1    Nakamura, N.2    Ohashi, K.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.