-
1
-
-
0016079895
-
A review of current inventory theory and its application
-
Aggarwal, B. C. (1974) A review of current inventory theory and its application, International Journal of Production Research, 12: 443-482.
-
(1974)
International Journal of Production Research
, vol.12
, pp. 443-482
-
-
Aggarwal, B.C.1
-
2
-
-
0037061529
-
The economic production lot-sizing problem with imperfect production processes and imperfect maintenance
-
Ben-Daya, M. (2002) The economic production lot-sizing problem with imperfect production processes and imperfect maintenance, International Journal of Production Economics, 76: 257-264.
-
(2002)
International Journal of Production Economics
, vol.76
, pp. 257-264
-
-
Ben-Daya, M.1
-
3
-
-
0026116409
-
An economic order quantity model with production processes
-
Cheng, T.C.E. (1991) An economic order quantity model with production processes, IIE Transactions, 23: 23-28.
-
(1991)
IIE Transactions
, vol.23
, pp. 23-28
-
-
Cheng, T.C.E.1
-
4
-
-
0142090745
-
Determining the optimal lot size for the finite production model with random defective rate, the rework process, and backlogging
-
Chiu, Y.P. (2003) Determining the optimal lot size for the finite production model with random defective rate, the rework process, and backlogging. Engineering Optimization, 35: 427-437.
-
(2003)
Engineering Optimization
, vol.35
, pp. 427-437
-
-
Chiu, Y.P.1
-
5
-
-
0030835106
-
Bounds for production lot sizing with machine breakdown
-
Chung, K.J. (1997) Bounds for production lot sizing with machine breakdown, Computers & Industrial Engineering, 32: 139-144.
-
(1997)
Computers & Industrial Engineering
, vol.32
, pp. 139-144
-
-
Chung, K.J.1
-
6
-
-
0035470201
-
Production lot sizing with the reworking of imperfect quality items produced
-
Hayek, P.A. and Salameh, M.K. (2001) Production lot sizing with the reworking of imperfect quality items produced, Production Planning & Control, 12(6): 584-590.
-
(2001)
Production Planning & Control
, vol.12
, Issue.6
, pp. 584-590
-
-
Hayek, P.A.1
Salameh, M.K.2
-
7
-
-
0023412314
-
Simultaneous determination of production cycle and inspection schedules in a production system
-
Lee, H. and Rosenblatt, M. (1987) Simultaneous determination of production cycle and inspection schedules in a production system, Management Science, 33: 1125-1136.
-
(1987)
Management Science
, vol.33
, pp. 1125-1136
-
-
Lee, H.1
Rosenblatt, M.2
-
8
-
-
0042091890
-
Optimal lot-sizing in an imperfect production system with homogeneous reworkable jobs
-
Liu, J.J. and Yang, P. (1996) Optimal lot-sizing in an imperfect production system with homogeneous reworkable jobs, European Journal of Operational Research, 91: 517-527.
-
(1996)
European Journal of Operational Research
, vol.91
, pp. 517-527
-
-
Liu, J.J.1
Yang, P.2
-
9
-
-
0003397637
-
-
McGraw-Hill Irwin, Inc.
-
th Ed., McGraw-Hill Irwin, Inc.
-
(2001)
th Ed.
-
-
Nahmias, S.1
-
10
-
-
0002656713
-
Use of the EOQ model for inventory analysis
-
Osteryoung, J.S., Nosari, E., McCarty, D.E., and Reinhart, W. J. (1986) Use of the EOQ model for inventory analysis, Production and Inventory Management. 27: 39-45.
-
(1986)
Production and Inventory Management
, vol.27
, pp. 39-45
-
-
Osteryoung, J.S.1
Nosari, E.2
McCarty, D.E.3
Reinhart, W.J.4
-
11
-
-
0022676316
-
Economic production cycles with imperfect production processes
-
Rosenblatt, M. J. and Lee, H. L. (1986) Economic production cycles with imperfect production processes, IIE Transactions, 18: 48-55.
-
(1986)
IIE Transactions
, vol.18
, pp. 48-55
-
-
Rosenblatt, M.J.1
Lee, H.L.2
-
16
-
-
0025399639
-
Joint lot sizing and inspection policy in and EOQ model with random yield
-
Zhang, and Gerchak, Y. (1990) Joint lot sizing and inspection policy in and EOQ model with random yield, IIE Transactions, 22: 41.
-
(1990)
IIE Transactions
, vol.22
, pp. 41
-
-
Zhang1
Gerchak, Y.2
|