메뉴 건너뛰기




Volumn 4, Issue 4, 2010, Pages 391-421

Estimating the impact of enterprise resource planning project management decisions on post-implementation maintenance costs: A case study using simulation modelling

Author keywords

Cost estimation model; Enterprise systems; Erp; Project management; System dynamics; Total cost of ownership

Indexed keywords

COST ESTIMATION MODELS; ENTERPRISE SYSTEM; ERP; SYSTEM DYNAMICS; TOTAL COST OF OWNERSHIP;

EID: 78049307075     PISSN: 17517575     EISSN: 17517583     Source Type: Journal    
DOI: 10.1080/17517575.2010.519785     Document Type: Article
Times cited : (32)

References (89)
  • 2
    • 0001318558 scopus 로고
    • Understanding the '90% syndrome' in software project management: A simulation-based case study
    • Abdel-Hamid, T., 1988. Understanding the '90% syndrome' in software project management: a simulation-based case study. Journal of Systems and Software, 8, 319-330.
    • (1988) Journal of Systems and Software , vol.8 , pp. 319-330
    • Abdel-Hamid, T.1
  • 3
    • 0024611582 scopus 로고
    • The dynamics of software project staffing: A system dynamics based simulation approach
    • Abdel-Hamid, T., 1989. The dynamics of software project staffing: a system dynamics based simulation approach. IEEE Transactions on Software Engineering, 15 (2), 109-119.
    • (1989) IEEE Transactions On Software Engineering , vol.15 , Issue.2 , pp. 109-119
    • Abdel-Hamid, T.1
  • 4
    • 0027556524 scopus 로고
    • Adapting, correcting, and perfecting software estimates: A maintenance metaphor
    • Abdel-Hamid, T., 1993. Adapting, correcting, and perfecting software estimates: a maintenance metaphor. Computer, 26 (3), 20-29.
    • (1993) Computer , vol.26 , Issue.3 , pp. 20-29
    • Abdel-Hamid, T.1
  • 5
    • 0023398475 scopus 로고
    • On the portability of quantitative software estimation models
    • Abdel-Hamid, T. and Madnick, S., 1987. On the portability of quantitative software estimation models. Information and Management, 13 (1), 1-10.
    • (1987) Information and Management , vol.13 , Issue.1 , pp. 1-10
    • Abdel-Hamid, T.1    Madnick, S.2
  • 7
    • 0037448855 scopus 로고    scopus 로고
    • The impact of ERP on a supply chain management: Exploratory findings from a European Delphi study
    • Akkermans, H., et al., 2003. The impact of ERP on a supply chain management: Exploratory findings from a European Delphi study. European Journal of Operational Research, 146, 284-301.
    • (2003) European Journal of Operational Research , vol.146 , pp. 284-301
    • Akkermans, H.1
  • 8
    • 0036001767 scopus 로고    scopus 로고
    • Vicious and virtuous cycles in ERP implementation: A case study of interrelations between critical success factors
    • Akkermans, H. and van Helden, K., 2002. Vicious and virtuous cycles in ERP implementation: a case study of interrelations between critical success factors. European Journal of Information Systems, 1, 35-46.
    • (2002) European Journal of Information Systems , vol.1 , pp. 35-46
    • Akkermans, H.1    van Helden, K.2
  • 9
    • 84986082563 scopus 로고    scopus 로고
    • Change management strategies for successful ERP implementation
    • Aladwani, A.M., 2001. Change management strategies for successful ERP implementation. Business Process Management, 7 (3), 266-275.
    • (2001) Business Process Management , vol.7 , Issue.3 , pp. 266-275
    • Aladwani, A.M.1
  • 10
    • 39849094480 scopus 로고    scopus 로고
    • Learn not to learn - a way of keeping budgets and deadlines in ERP projects?
    • Available from
    • Andersson, A. and Linderoth, H.C.J., 2008. Learn not to learn - a way of keeping budgets and deadlines in ERP projects? Enterprise Information Systems, 2 (1), 77-95. Available from: http://www.informaworld.com/10.1080/17517570701793830.
    • (2008) Enterprise Information Systems , vol.2 , Issue.1 , pp. 77-95
    • Andersson, A.1    Linderoth, H.C.J.2
  • 11
    • 78049252035 scopus 로고    scopus 로고
    • Improving the software development process: A dynamic model using the capacity maturity model
    • Boston, MA. Available from
    • Araujo, E., et al., 2007. Improving the software development process: a dynamic model using the capacity maturity model. Paper presented at the Proceedings of the 2007 International Conference of the System Dynamics Society, Boston, MA. Available from http:// systemdynamics.org/conferences/2007/proceed/index.htm.
    • (2007) Paper Presented At the Proceedings of the 2007 International Conference of the System Dynamics Society
    • Araujo, E.1
  • 13
    • 2942729980 scopus 로고    scopus 로고
    • Seeking strategic advantage in the post-net era: Viewing ERP systems from the resource-based perspective
    • Bearda, J.W. and Sumner, M., 2004. Seeking strategic advantage in the post-net era: viewing ERP systems from the resource-based perspective. Journal of Strategic Information Systems, 13 (2), 129-150.
    • (2004) Journal of Strategic Information Systems , vol.13 , Issue.2 , pp. 129-150
    • Bearda, J.W.1    Sumner, M.2
  • 14
    • 0042818983 scopus 로고    scopus 로고
    • ERP project dynamics and enacted dialogue: Perceived understanding, perceived leeway, and the nature of task-related conflicts
    • Besson, P. and Rowe, F., 2001. ERP project dynamics and enacted dialogue: perceived understanding, perceived leeway, and the nature of task-related conflicts. The DATA BASE for Advances in Information Systems, 32 (4), 47-66.
    • (2001) The DATA BASE For Advances In Information Systems , vol.32 , Issue.4 , pp. 47-66
    • Besson, P.1    Rowe, F.2
  • 16
    • 78049279492 scopus 로고    scopus 로고
    • Capturing project dynamics with a new project management tool: Project management simulation model (PMSM)
    • Boston, MA. Available from
    • Bulbul, A.A., 2005. Capturing project dynamics with a new project management tool: project management simulation model (PMSM). Paper presented at the Proceedings of the 23rd International Conference of the System Dynamics Society, Boston, MA. Available from: http://systemdynamics.org/conferences/2005/proceed/index.htm.
    • (2005) Paper Presented At the Proceedings of the 23rd International Conference of the System Dynamics Society
    • Bulbul, A.A.1
  • 19
    • 56649109917 scopus 로고    scopus 로고
    • Dynamic project performance estimation by combining static estimation models with system dynamics
    • Choi, K. and Bae, D., 2009. Dynamic project performance estimation by combining static estimation models with system dynamics. Information and Software Technology, 51 (1), 162-172.
    • (2009) Information and Software Technology , vol.51 , Issue.1 , pp. 162-172
    • Choi, K.1    Bae, D.2
  • 20
    • 83755202997 scopus 로고
    • Naval ship production: A claim settled and a framework built
    • Cooper, K.G., 1980. Naval ship production: a claim settled and a framework built. Interfaces, 10 (6),20-36.
    • (1980) Interfaces , vol.10 , Issue.6 , pp. 20-36
    • Cooper, K.G.1
  • 22
    • 0032112063 scopus 로고    scopus 로고
    • Putting the enterprise into the enterprise system
    • Davenport, T.H., 1998. Putting the enterprise into the enterprise system. Harvard Business Review, 76 (4), 121-131.
    • (1998) Harvard Business Review , vol.76 , Issue.4 , pp. 121-131
    • Davenport, T.H.1
  • 24
    • 33646671571 scopus 로고    scopus 로고
    • A model for enterprise systems implementation: Top management influences on implementation effectivenes
    • Long Beach, CA. Available from
    • Dong, L., 2000. A model for enterprise systems implementation: top management influences on implementation effectivenes. Paper presented at the Americas Conference on Information Systems (AMCIS), Long Beach, CA. Available from: http://aisel.aisnet.org/ amcis2000/13.
    • (2000) Paper Presented At the Americas Conference On Information Systems (AMCIS)
    • Dong, L.1
  • 28
    • 78049234868 scopus 로고    scopus 로고
    • Reengineering business process reengineering with system dynamics
    • Cambridge, MA. Available from
    • Georgantzas, N.C., 1996. Reengineering business process reengineering with system dynamics. Paper presented at the 1996 International System Dynamics Conference, Cambridge, MA. Available from: http://systemdynamics.org/conferences/1996/proceed/index.htm.
    • (1996) Paper Presented At the 1996 International System Dynamics Conference
    • Georgantzas, N.C.1
  • 33
    • 33751024633 scopus 로고    scopus 로고
    • Prioritization of enterprise resource planning (ERP) systems success measures: Viewpoints of two organizational stakeholder groups
    • 23-27 April 2006, Dijon, France. Available from
    • Ifinedo, P. and Nahar, N., 2006. Prioritization of enterprise resource planning (ERP) systems success measures: viewpoints of two organizational stakeholder groups. Paper presented at the ACM Symposium on Applied Computing, 23-27 April 2006, Dijon, France. Available from: http://doi.acm.org/10.1145/1141277.1141636.
    • (2006) Paper Presented At the ACM Symposium On Applied Computing
    • Ifinedo, P.1    Nahar, N.2
  • 34
    • 34548032213 scopus 로고    scopus 로고
    • ERP systems success: An empirical analysis of how two organizational stakeholder groups prioritize and evaluate relevant measures
    • Ifinedo, P. and Nahar, N., 2007. ERP systems success: an empirical analysis of how two organizational stakeholder groups prioritize and evaluate relevant measures. Enterprise Information Systems, 1 (1), 25-48.
    • (2007) Enterprise Information Systems , vol.1 , Issue.1 , pp. 25-48
    • Ifinedo, P.1    Nahar, N.2
  • 35
    • 78049298125 scopus 로고    scopus 로고
    • The total cost of ERP ownership
    • Available from
    • Jutras, C., 2006. The total cost of ERP ownership. Enterprise Strategies: AberdeenGroup. Available from: http://www.aberdeen.com/.
    • (2006) Enterprise Strategies: AberdeenGroup
    • Jutras, C.1
  • 36
    • 78049281605 scopus 로고    scopus 로고
    • The total cost of ERP ownership in mid-size companies
    • Available from
    • Jutras, C., 2007. The total cost of ERP ownership in mid-size companies. AberdeenGroup. Available from: http://www.aberdeen.com/.
    • (2007) AberdeenGroup
    • Jutras, C.1
  • 37
    • 78049284551 scopus 로고    scopus 로고
    • A system dynamics model of an ERP application designed to produce a transformation of IS business processes
    • Nijmegen, The Netherlands. Available from
    • Kennedy, M.S., 2006. A system dynamics model of an ERP application designed to produce a transformation of IS business processes. Paper presented at the Proceedings of the 24th International Conference of the System Dynamics Society, Nijmegen, The Netherlands. Available from: http://systemdynamics.org/conferences/2006/proceed/index.htm.
    • (2006) Paper Presented At the Proceedings of the 24th International Conference of the System Dynamics Society
    • Kennedy, M.S.1
  • 38
    • 0142217277 scopus 로고    scopus 로고
    • ERP implementation: An integrated process of radical change and continuous learning
    • Kraemmerand, P., Moller, C. and Boer, H., 2003. ERP implementation: an integrated process of radical change and continuous learning. Production Planning & Control, 14(4), 228-248.
    • (2003) Production Planning & Control , vol.14 , Issue.4 , pp. 228-248
    • Kraemmerand, P.1    Moller, C.2    Boer, H.3
  • 41
    • 55349128874 scopus 로고    scopus 로고
    • TQM - a predecessor of ERP implementation
    • Available from
    • Li, L., et al., 2008a. TQM - a predecessor of ERP implementation. International Journal of Production Economics, 115 (2), 569-580. Available from: http://www.sciencedirect.com/ science/article/B566VF568-564T562DKTY-561/562/f560e519f517a552dae2262d4658238c 4692582.
    • (2008) International Journal of Production Economics , vol.115 , Issue.2 , pp. 569-580
    • Li, L.1
  • 42
    • 36349023414 scopus 로고    scopus 로고
    • Assessing the effects of manufacturing infrastructure preparation prior to enterprise information-systems implementation
    • Available from
    • Li, L., et al., 2008b. Assessing the effects of manufacturing infrastructure preparation prior to enterprise information-systems implementation. International Journal of Production Research, 46 (6), 1645-1665. Available from: http://www.informaworld.com/1610.1080/ 00207540600898064.
    • (2008) International Journal of Production Research , vol.46 , Issue.6 , pp. 1645-1665
    • Li, L.1
  • 44
    • 78049268679 scopus 로고    scopus 로고
    • System Dynamics Society Applications Award 2009 to Ken Cooper and Greg Lee for Work at Fluor Corporation
    • Lyneis, J.M., 2009. System Dynamics Society Applications Award 2009 to Ken Cooper and Greg Lee for Work at Fluor Corporation. System Dynamics NEWSLETTER, p. 22.
    • (2009) System Dynamics NEWSLETTER , pp. 22
    • Lyneis, J.M.1
  • 45
    • 0001446357 scopus 로고    scopus 로고
    • Strategic management of complex projects: A case study using system dynamics
    • Lyneis, J.M., Cooper, K.G., and Els, S.A., 2001. Strategic management of complex projects: a case study using system dynamics. System Dynamics Review, 17 (3), 237-260.
    • (2001) System Dynamics Review , vol.17 , Issue.3 , pp. 237-260
    • Lyneis, J.M.1    Cooper, K.G.2    Els, S.A.3
  • 46
    • 36349001859 scopus 로고    scopus 로고
    • System dynamics applied to project management: A survey, assessment, and directions for future research
    • Lyneis, J.M. and Ford, D.N., 2007. System dynamics applied to project management: a survey, assessment, and directions for future research. System Dynamics Review, 23 (2-3), 157-189.
    • (2007) System Dynamics Review , vol.23 , Issue.2-3 , pp. 157-189
    • Lyneis, J.M.1    Ford, D.N.2
  • 48
    • 0002327064 scopus 로고    scopus 로고
    • The enterprise systems experience - from adoption to success
    • In: R.W. Zmud, ed., Cincinnati, OH: Pinnafles Educational Resources Inc
    • Markus, M.L. and Tanis, C., 2000. The enterprise systems experience - from adoption to success. In: R.W. Zmud, ed. Framing the domains of IT research: glimpsing the future through the past. Cincinnati, OH: Pinnafles Educational Resources Inc, 173-207.
    • (2000) Framing the Domains of it Research: Glimpsing the Future Through the Past , pp. 173-207
    • Markus, M.L.1    Tanis, C.2
  • 49
    • 0001894535 scopus 로고    scopus 로고
    • Multisite ERP implementation
    • Markus, M.L., Tanis, C., and Fenema, P.C., 2000. Multisite ERP implementation. CACM, 43 (4),42-46.
    • (2000) CACM , vol.43 , Issue.4 , pp. 42-46
    • Markus, M.L.1    Tanis, C.2    Fenema, P.C.3
  • 50
    • 84977393414 scopus 로고
    • Modeling complexity: Using dynamics simulation to link regression and case studies
    • McCaffrey, D., et al., 1985. Modeling complexity: using dynamics simulation to link regression and case studies. Journal of Policy Analysis and Management, 4 (2), 196-216.
    • (1985) Journal of Policy Analysis and Management , vol.4 , Issue.2 , pp. 196-216
    • McCaffrey, D.1
  • 53
    • 78049244655 scopus 로고    scopus 로고
    • Risk manager: A system dynamics simulation tool to identify and mitigate project risk
    • 6-10 August 2000, Bergen, Norway. Available from
    • Mindrum, C., et al., 2000. "Risk manager": a system dynamics simulation tool to identify and mitigate project risk. Paper presented at the 18th International Conference of the System Dynamics Society, 6-10 August 2000, Bergen, Norway. Available from: http:// systemdynamics.org/conferences/2000/proceeds.pdf.
    • (2000) Paper Presented At the 18th International Conference of the System Dynamics Society
    • Mindrum, C.1
  • 54
    • 85006894912 scopus 로고    scopus 로고
    • The effects of national culture on ERP implementation: A study of Colombia and Switzerland
    • Murcia, M.A.P. and Whitley, E.A., 2007. The effects of national culture on ERP implementation: a study of Colombia and Switzerland. Enterprise Information Systems, 1 (3),301-325.
    • (2007) Enterprise Information Systems , vol.1 , Issue.3 , pp. 301-325
    • Murcia, M.A.P.1    Whitley, E.A.2
  • 55
    • 0034969960 scopus 로고    scopus 로고
    • Using cost benefit analysis for enterprise resource planning project evaluation: A case for including intangibles
    • 3-6 January. Washington, DC: IEEE Computer Society
    • Murphy, K. and Simon, S., 2001. Using cost benefit analysis for enterprise resource planning project evaluation: a case for including intangibles. Paper presented at the Proceedings of the 34th Annual Hawaii International Conference on System Sciences, 3-6 January. Washington, DC: IEEE Computer Society, 8018-8029.
    • (2001) Paper Presented At the Proceedings of the 34th Annual Hawaii International Conference On System Sciences , pp. 8018-8029
    • Murphy, K.1    Simon, S.2
  • 57
    • 77749279674 scopus 로고    scopus 로고
    • Maintaining ERP packaged software - a revelatory case study
    • Ng, C.S.-P. and Gable, G.G., 2010. Maintaining ERP packaged software - a revelatory case study. Journal of Information Technology, 25, 65-90.
    • (2010) Journal of Information Technology , vol.25 , pp. 65-90
    • Ng, C.S.-P.1    Gable, G.G.2
  • 58
    • 78049285019 scopus 로고    scopus 로고
    • The ERP dilemma: "plain vanilla" versus customer satisfaction
    • Noyes, J.W., 2003. The ERP dilemma: "plain vanilla" versus customer satisfaction. Educause Quarterly, 2, 54-55.
    • (2003) Educause Quarterly , vol.2 , pp. 54-55
    • Noyes, J.W.1
  • 61
    • 0036014191 scopus 로고    scopus 로고
    • Knowing in practice: Enacting a collective capability in distributed organizing
    • Orlikowski, W.J., 2002. Knowing in practice: enacting a collective capability in distributed organizing. Organization Science, 13 (3), 249-273.
    • (2002) Organization Science , vol.13 , Issue.3 , pp. 249-273
    • Orlikowski, W.J.1
  • 62
    • 84877913578 scopus 로고    scopus 로고
    • Lost signals: How poor communication and other nontechnical issues hampered Arkansas' innovative statewide ERP implementation
    • February. Available from
    • Peterson, S., 2003. Lost signals: how poor communication and other nontechnical issues hampered Arkansas' innovative statewide ERP implementation. Government Technology. February. Available from: http://www.govtech.com/e.government/Lost-Signals.html.
    • (2003) Government Technology
    • Peterson, S.1
  • 63
    • 0034321494 scopus 로고    scopus 로고
    • Using simulation to analyse the impact of software requirement volatality on project performance
    • Pfahl, D. and Lebsanft, K., 2000. Using simulation to analyse the impact of software requirement volatality on project performance. Information and Software Technology, 42(14),1001-1008.
    • (2000) Information and Software Technology , vol.42 , Issue.14 , pp. 1001-1008
    • Pfahl, D.1    Lebsanft, K.2
  • 64
    • 58049139009 scopus 로고    scopus 로고
    • PMI, 3rd ed. Newtown Square, PA: Project Management Institute
    • 1 Guide). 3rd ed. Newtown Square, PA: Project Management Institute.
    • (2004) 1 Guide)
  • 66
    • 0000511606 scopus 로고
    • Guidelines for model conceptualization
    • In: Randers, J., ed., MA: Productivity Press
    • Randers, J., 1980. Guidelines for model conceptualization. In: Randers, J., ed. Elements of the system dynamics method. Cambridge, MA: Productivity Press, 117-139.
    • (1980) Elements of the System Dynamics Method. Cambridge , pp. 117-139
    • Randers, J.1
  • 71
    • 78049289220 scopus 로고    scopus 로고
    • Post Implementation ERP maintenance - we've only just begun
    • Orlando, FL. Available from
    • Salmon, M., 2007. Post Implementation ERP maintenance - we've only just begun. Paper presented at the Alliance Conference, Orlando, FL. Available from: http://heug.org/p/do/sd/sid=45190&type=40.
    • (2007) Paper Presented At the Alliance Conference
    • Salmon, M.1
  • 72
    • 78049286002 scopus 로고    scopus 로고
    • Dynamic aspects of an ERP implementation project
    • Boston, MA. Available from
    • Santos, J., Serrano, N., and Sarriegi, J.M., 2005. Dynamic aspects of an ERP implementation project. Paper presented at the System Dynamics Conference, Boston, MA. Available from: http://systemdynamics.org/conferences/2005/proceed/index.htm.
    • (2005) Paper Presented At the System Dynamics Conference
    • Santos, J.1    Serrano, N.2    Sarriegi, J.M.3
  • 74
    • 85006664859 scopus 로고    scopus 로고
    • Enterprise system implementation issues: Learning from field study in Poland
    • Available form
    • Soja, P., 2009. Enterprise system implementation issues: learning from field study in Poland. Enterprise Information Systems, 3 (2), 1-28. Available form: http://www.informaworld. com/10.1080/17517570802398216.
    • (2009) Enterprise Information Systems , vol.3 , Issue.2 , pp. 1-28
    • Soja, P.1
  • 75
    • 78049232028 scopus 로고    scopus 로고
    • An ERP post-implementation review: Planning for the future by looking back
    • Spicer, D.Z., DeBlois, P.B., and Committee, E.C.I., 2004. An ERP post-implementation review: planning for the future by looking back. EDUCAUSE Quarterly, 27 (2), 8-22.
    • (2004) EDUCAUSE Quarterly , vol.27 , Issue.2 , pp. 8-22
    • Spicer, D.Z.1    Deblois, P.B.2    Committee, E.C.I.3
  • 78
    • 26044434660 scopus 로고    scopus 로고
    • Achievement assessment for enterprise resource planning (ERP) system implementations based on critical success factors (CSFs)
    • Sun, A.Y.T., Yazdani, A., and Overend, D.J., 2005. Achievement assessment for enterprise resource planning (ERP) system implementations based on critical success factors (CSFs). International Journal of Production Economics, 98, 189-203.
    • (2005) International Journal of Production Economics , vol.98 , pp. 189-203
    • Sun, A.Y.T.1    Yazdani, A.2    Overend, D.J.3
  • 79
    • 78049265540 scopus 로고    scopus 로고
    • Improving software project management through system dynamics modeling
    • Cambridge, MA. Available from
    • Sycamore, D., 1996. Improving software project management through system dynamics modeling.Paperpresentedatthe1996InternationalSystemDynamicsConference,Cambridge, MA. Available from: http://systemdynamics.org/conferences/1996/proceed/index.htm.
    • (1996) Paperpresentedatthe1996InternationalSystemDynamicsConference
    • Sycamore, D.1
  • 81
    • 85125255723 scopus 로고    scopus 로고
    • The role of project acceptance in the successful peoplesoft human resources management system implementation for the Kentucky community an technical college system
    • Tampa, FL. Available from
    • Tapp, R.M., Hesseldenz, J., and Kelley, G., 2003. The role of project acceptance in the successful peoplesoft human resources management system implementation for the Kentucky community an technical college system. Paper presented at the 9th Americas Conference on Information Systems (AMCIS), Tampa, FL. Available from: http:// aisel.aisnet.org/amcis2003/172/.
    • (2003) Paper Presented At the 9th Americas Conference On Information Systems (AMCIS)
    • Tapp, R.M.1    Hesseldenz, J.2    Kelley, G.3
  • 82
    • 33646499160 scopus 로고    scopus 로고
    • Tipping point failure and robustness in single development projects
    • Taylor, T. and Ford, D.N., 2006. Tipping point failure and robustness in single development projects. System Dynamics Review, 22 (1), 51-71.
    • (2006) System Dynamics Review , vol.22 , Issue.1 , pp. 51-71
    • Taylor, T.1    Ford, D.N.2
  • 84
    • 39849108362 scopus 로고    scopus 로고
    • A method for improving ERP implementation success by the principles and process of user-centred design
    • Available from
    • Vilpola, I.H., 2008. A method for improving ERP implementation success by the principles and process of user-centred design. Enterprise Information Systems, 2 (1), 47-76. Available from: http://www.informaworld.com/10.1080/17517570701793848.
    • (2008) Enterprise Information Systems , vol.2 , Issue.1 , pp. 47-76
    • Vilpola, I.H.1
  • 87
    • 77949633560 scopus 로고    scopus 로고
    • An ERP implementation and business process reengineering at a Small University
    • Yakovlev, I.V., 2002. An ERP implementation and business process reengineering at a Small University. Educause Quarterly, 2, 52-57.
    • (2002) Educause Quarterly , vol.2 , pp. 52-57
    • Yakovlev, I.V.1
  • 89
    • 78049313804 scopus 로고    scopus 로고
    • Guided by learning organization to practice a process reengineering for an enterprise business
    • Cambridge, MA. Available from
    • Yu, L., 1996. Guided by learning organization to practice a process reengineering for an enterprise business. Paper presented at the 1996 International System Dynamics Conference, Cambridge, MA. Available from: http://systemdynamics.org/conferences/ 1996/proceed/index.htm.
    • (1996) Paper Presented At the 1996 International System Dynamics Conference
    • Yu, L.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.