메뉴 건너뛰기




Volumn 29, Issue 1, 2010, Pages 35-46

Design of multi-product manufacturing lines with the consideration of product change dependent inter-task times, reduced changeover and machine flexibility

Author keywords

[No Author keywords available]

Indexed keywords

DEVELOPED MODEL; HEURISTIC SOLUTIONS; MACHINE FLEXIBILITY; MANUFACTURING LINES; MANUFACTURING TASKS; MIXED INTEGER PROGRAMMING; MIXED-MODEL PRODUCTION; MULTI-MODEL; MULTI-PRODUCTS; OPTIMIZATION MODELS; PRODUCT CHANGES; PRODUCT MODELS; PRODUCT VARIETY; SEQUENCE-DEPENDENT; SIGNIFICANT IMPACTS;

EID: 77957716540     PISSN: 02786125     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.jmsy.2010.08.001     Document Type: Article
Times cited : (54)

References (38)
  • 1
    • 0027599646 scopus 로고
    • Decomposition for scheduling flexible manufacturing systems
    • R.R. Inman, and P.C. Jones Decomposition for scheduling flexible manufacturing systems Operations Research 41 3 1993 608 617
    • (1993) Operations Research , vol.41 , Issue.3 , pp. 608-617
    • Inman, R.R.1    Jones, P.C.2
  • 2
    • 0022676091 scopus 로고
    • A hierarchical approach to solving machine grouping and loading problems of flexible manufacturing systems
    • K.E. Stecke A hierarchical approach to solving machine grouping and loading problems of flexible manufacturing systems European Journal of Operational Research 24 3 1986 369 378
    • (1986) European Journal of Operational Research , vol.24 , Issue.3 , pp. 369-378
    • Stecke, K.E.1
  • 3
    • 0000424475 scopus 로고
    • Classification of flexible manufacturing systems
    • J. Browne Classification of flexible manufacturing systems The FMS Magazine 2 2 1984 114 117
    • (1984) The FMS Magazine , vol.2 , Issue.2 , pp. 114-117
    • Browne, J.1
  • 5
    • 0023384747 scopus 로고
    • The machine loading and tool allocation problem in a flexible manufacturing system
    • S.C. Sarin, and C.S. Chen The machine loading and tool allocation problem in a flexible manufacturing system International Journal of Production Research 25 7 1987 1081 1094
    • (1987) International Journal of Production Research , vol.25 , Issue.7 , pp. 1081-1094
    • Sarin, S.C.1    Chen, C.S.2
  • 6
    • 0036833069 scopus 로고    scopus 로고
    • Commonality and postponement in multistage assembly systems
    • S. Ma, W. Wang, and L. Liu Commonality and postponement in multistage assembly systems European Journal of Operational Research 142 3 2002 523 538
    • (2002) European Journal of Operational Research , vol.142 , Issue.3 , pp. 523-538
    • Ma, S.1    Wang, W.2    Liu, L.3
  • 9
    • 58149321832 scopus 로고
    • The role of product architecture in the manufacturing firm
    • K. Ulrich The role of product architecture in the manufacturing firm Research Policy 24 3 1995 419 440
    • (1995) Research Policy , vol.24 , Issue.3 , pp. 419-440
    • Ulrich, K.1
  • 11
    • 43449085514 scopus 로고    scopus 로고
    • The sequence-dependent assembly line balancing problem
    • A. Scholl, N. Boysen, and M. Fliedner The sequence-dependent assembly line balancing problem OR Spectrum 30 3 2008 579 609
    • (2008) OR Spectrum , vol.30 , Issue.3 , pp. 579-609
    • Scholl, A.1    Boysen, N.2    Fliedner, M.3
  • 12
    • 36849023499 scopus 로고    scopus 로고
    • Balancing and scheduling tasks in assembly lines with sequence-dependent setup times
    • C. Andrs, C. Miralles, and R. Pastor Balancing and scheduling tasks in assembly lines with sequence-dependent setup times European Journal of Operational Research 187 3 2008 1212 1223
    • (2008) European Journal of Operational Research , vol.187 , Issue.3 , pp. 1212-1223
    • Andrs, C.1    Miralles, C.2    Pastor, R.3
  • 13
    • 77954577006 scopus 로고    scopus 로고
    • Balancing two-sided assembly lines with sequence-dependent setup times
    • U zcan, and B Toklu Balancing two-sided assembly lines with sequence-dependent setup times International Journal of Production Research 48 18 2010 5363 5383
    • (2010) International Journal of Production Research , vol.48 , Issue.18 , pp. 5363-5383
    • Zcan, U.1    Toklu, B.2
  • 15
    • 0032651420 scopus 로고    scopus 로고
    • A column-generation approach for the assembly system design problem with tool changes
    • W.E. Wilhelm A column-generation approach for the assembly system design problem with tool changes International Journal of Flexible Manufacturing Systems 11 2 1999 177 205
    • (1999) International Journal of Flexible Manufacturing Systems , vol.11 , Issue.2 , pp. 177-205
    • Wilhelm, W.E.1
  • 16
    • 40849130689 scopus 로고
    • A computer method of sequencing operations for assembly lines
    • A.L. Arcus A computer method of sequencing operations for assembly lines International Journal of Production Research 4 4 1965 259 277
    • (1965) International Journal of Production Research , vol.4 , Issue.4 , pp. 259-277
    • Arcus, A.L.1
  • 18
    • 77955285833 scopus 로고    scopus 로고
    • Manufacturing system design considering stochastic product evolution and task recurrence
    • J. Ko, and S.J. Hu Manufacturing system design considering stochastic product evolution and task recurrence Journal of Manufacturing Science and Engineering 131 5 2009 051012
    • (2009) Journal of Manufacturing Science and Engineering , vol.131 , Issue.5 , pp. 051012
    • Ko, J.1    Hu, S.J.2
  • 19
    • 0032117097 scopus 로고    scopus 로고
    • A survey of the assembly line balancing procedures
    • E. Erel, and S.C. Sarin A survey of the assembly line balancing procedures Production Planning and Control 9 5 1998 414 434
    • (1998) Production Planning and Control , vol.9 , Issue.5 , pp. 414-434
    • Erel, E.1    Sarin, S.C.2
  • 20
    • 25144450992 scopus 로고    scopus 로고
    • A survey on problems and methods in generalized assembly line balancing
    • C. Becker, and A. Scholl A survey on problems and methods in generalized assembly line balancing European Journal of Operational Research 168 3 2006 694 715
    • (2006) European Journal of Operational Research , vol.168 , Issue.3 , pp. 694-715
    • Becker, C.1    Scholl, A.2
  • 22
    • 40449083604 scopus 로고    scopus 로고
    • A survey of the literature on the multiple or parallel assembly line balancing problem
    • A. Lusa A survey of the literature on the multiple or parallel assembly line balancing problem European Journal of Industrial Engineering 2 1 2008 50 72
    • (2008) European Journal of Industrial Engineering , vol.2 , Issue.1 , pp. 50-72
    • Lusa, A.1
  • 24
    • 0035130068 scopus 로고    scopus 로고
    • Balancing mixed-model assembly lines to reduce work overload
    • S. Matanachai, and C.A. Yano Balancing mixed-model assembly lines to reduce work overload IIE Transactions 33 1 2001 29 42
    • (2001) IIE Transactions , vol.33 , Issue.1 , pp. 29-42
    • Matanachai, S.1    Yano, C.A.2
  • 25
    • 51249121803 scopus 로고    scopus 로고
    • Sequencing mixed-model assembly lines: Survey, classification and model critique
    • N. Boysen, M. Fliedner, and A. Scholl Sequencing mixed-model assembly lines: survey, classification and model critique European Journal of Operational Research 192 2 2009 349 373
    • (2009) European Journal of Operational Research , vol.192 , Issue.2 , pp. 349-373
    • Boysen, N.1    Fliedner, M.2    Scholl, A.3
  • 26
    • 55149115705 scopus 로고    scopus 로고
    • Modeling of manufacturing complexity in mixed-model assembly lines
    • X. Zhu Modeling of manufacturing complexity in mixed-model assembly lines Journal of Manufacturing Science and Engineering 130 2008
    • (2008) Journal of Manufacturing Science and Engineering , vol.130
    • Zhu, X.1
  • 27
    • 25144469836 scopus 로고    scopus 로고
    • An endosymbiotic evolutionary algorithm for the integration of balancing and sequencing in mixed-model U-lines
    • Y.K. Kim, J.Y. Kim, and Y. Kim An endosymbiotic evolutionary algorithm for the integration of balancing and sequencing in mixed-model U-lines European Journal of Operational Research 168 3 2006 838 852
    • (2006) European Journal of Operational Research , vol.168 , Issue.3 , pp. 838-852
    • Kim, Y.K.1    Kim, J.Y.2    Kim, Y.3
  • 28
    • 0242269828 scopus 로고    scopus 로고
    • ASRS sizing for recreating automotive assembly sequences
    • R.R. Inman ASRS sizing for recreating automotive assembly sequences International Journal of Production Research 41 5 2003 847 863
    • (2003) International Journal of Production Research , vol.41 , Issue.5 , pp. 847-863
    • Inman, R.R.1
  • 29
    • 2942674864 scopus 로고    scopus 로고
    • Scheduling flexible flow lines with sequence-dependent setup times
    • M.E. Kurz, and R.G. Askin Scheduling flexible flow lines with sequence-dependent setup times European Journal of Operational Research 159 1 2004 66 82
    • (2004) European Journal of Operational Research , vol.159 , Issue.1 , pp. 66-82
    • Kurz, M.E.1    Askin, R.G.2
  • 30
    • 33847250382 scopus 로고    scopus 로고
    • A multicriteria flowshop scheduling problem with setup times
    • DOI 10.1016/j.jmatprotec.2006.12.022, PII S0924013606011551
    • T. Eren A multicriteria flowshop scheduling problem with setup times Journal of Materials Processing Technology 186 13 2007 60 65 (Pubitemid 46330717)
    • (2007) Journal of Materials Processing Technology , vol.186 , Issue.1-3 , pp. 60-65
    • Eren, T.1
  • 31
    • 74549129380 scopus 로고    scopus 로고
    • Heuristic procedures for solving the general assembly line balancing problem with setups
    • L. Martino, and R. Pastor Heuristic procedures for solving the general assembly line balancing problem with setups International Journal of Production Research 48 6 2010 1787 1804
    • (2010) International Journal of Production Research , vol.48 , Issue.6 , pp. 1787-1804
    • Martino, L.1    Pastor, R.2
  • 32
    • 64549088104 scopus 로고    scopus 로고
    • An evaluation of constructive heuristic methods for solving the alternative subgraphs assembly line balancing problem
    • L. Capacho An evaluation of constructive heuristic methods for solving the alternative subgraphs assembly line balancing problem Journal of Heuristics 15 2 2009 109 132
    • (2009) Journal of Heuristics , vol.15 , Issue.2 , pp. 109-132
    • Capacho, L.1
  • 33
    • 0031543416 scopus 로고    scopus 로고
    • Simple assembly line balancingheuristic approaches
    • A. Scholl, and S. Voß Simple assembly line balancingheuristic approaches Journal of Heuristics 2 3 1997 217 244
    • (1997) Journal of Heuristics , vol.2 , Issue.3 , pp. 217-244
    • Scholl, A.1    Voß, S.2
  • 38
    • 0001636411 scopus 로고
    • An experimental investigation and comparative evaluation of production line balancing techniques
    • A.A. Mastor An experimental investigation and comparative evaluation of production line balancing techniques Management Science 16 11 1970 728 746
    • (1970) Management Science , vol.16 , Issue.11 , pp. 728-746
    • Mastor, A.A.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.